Professional Documents
Culture Documents
GENERAL NOTES :-
REF. OF REVESIONS
SPECIAL NOTES:-
FOR APPROVAL
THIS DRAWING HAS PROOF CHECKER'S / DDC CERTIFICATE CONSORTIUM / GC CERTIFICATE NOTICE OF 'NO OBJECTIONS' FROM EMPLOYER IS BEING ACCORDED FOR DESIGN
PRINCIPLES. HOWEVER, THE OVERALL RESPONSIBILITY FOR THE DETAILING AND DESIGN
PROCESS NAME DESIGNATION SIGN DATE PROCESS NAME DESIGNATION SIGN DATE BEEN PROOF
CHECKED IN PROCESS NAME DESIGNATION SIGN DATE " NO OBJECTION" PROCESS NAME DESIGNATION SIGN DATE ACCURACY LIES WITH THE DESIGN AND BUILD CONTRACTOR.
ACCORDANCE AS PER
APPROVED BY WITH THE REQUIREMENT OF NAME DESIGNATION SIGN NAME DESIGNATION SIGN
APPROVED BY REQUIREMENTS OF APPROVED BY THE CONTRACT APPROVED BY
CHECKED BY CONTRACT NO. SCALE:- DATE:-
CA02/ LINE 7 AND
DESIGN BY FOUND SUITABLE REVIEWED BY
REVIEWED BY FOR EXECUTION REVIEWED BY
DRAWN BY PURPOSE REVIEWED BY PROJECT :-
CONSULTANT CONTRACTOR DETAIL DESIGN CONSULTANT GENERAL CONSULTANT OWNER