Mob No – 9875744920
cpubro@gmail.com
DIPLOMA WITH +40 YEARS OF EXPERIENCE
PROFICIENCY IN EXECUTION OF ROAD WORKS WITH MORTH SPECIFICATIONS
GOOD KNOWLEDGE IN PROJECT PLANNING, MONITORING & COST CONTROL
JUDICIOUSLY UTILIZATION OF RESOURCES
SOUND KNOWLEDGE IN INTERPRETATION OF CONTRACT DOCUMENTS & ESTABLISHMENT OF CLAIMS
GOOD KNOWLEDGE OF CONTRACT DOCUMENTS, ARBITRATIONS & RELATED LITIGATIONS
PERSONAL
DETAILS : Chandra Prakash
Father’s : Late Sri T.R. Upadhyay
name Date : 01 JULY 1962
CONTACT
of birth ADDRESS : Married
Address
Marital for : Tulip
Indian-642, New Minal Residency, J.K.Road, Bhopal,
status No
Mobile : Madhya Pradesh, India
9875744920
Bhopal, MADHYA PRADESH,
Land line : NA
EMPLOYMENT
No E-mail : cpubro@gmail.com
DETAILS
Language : English &Supervisor
Work-Sr Hindi in Bhagirathi Engineering
Present : Limited,
AE WithMgmarg
BORDER Kochin,
ROADS (Kerala)
ORGANIZATION /
From Feb1982 to Nov
GENERAL RESERVE ENGINEER1984– 2 Years& 8 Months
FORCE
In BRO (Central Govt Department), under MINERSTRY
OF DEFENCE (MOD)
From 11.01.1985 to till date – 37 Years & 1 Months
QUALIFICATIONS
Academic : SSC – 1978 (First Class)
Computer knowledge : Very good knowledge in MS Word, Excel & Power Point etc.
CARRIER CHRONICLE
Bhagirathi Engineering Limited : From Feb 1982 to Nov 1984
Construction of Dam for MPEB Thermal Power
Project, Establishment of New Camp in Birsingpurpali
(M.P.)
Nov 2017 to June 2022 -EE, Construction Of both road sector setrawa banayana sandara
Barmer, Rajasthan devikot and shrimohangarh, ramgarh construction of 40 km
road sector setwara baniyana sandera devikot with
construction etc. roads and multicell box culverts of 15mt &
30m long.
Construction of 61km fresh road with average 2m height
embankment filling & 84 numbers of box culverts from Shri
Mohangarh to Ramgarh at Dist. Jaisalmer.
Jan 1990 to May 1992 – SE, Dett with budged section matters & cost control of all ongoing
Udhampur, Jammu & Kashmir jobs.
Estimation Division
Carrying our recccy survey of hill /plain roads, bridges.
Preparation & submission of estimates for roads, bridges etc.
Preparation & submission of revised estimates.
Preparation of rate analysis, standard schedule of rates etc.
Planning Division
Preparation & submission of annual & 5 years plan of works.
Preparation & submission of budget planning.
Processing of HPs of bridges for approvals.
Monitoring Division
Preparation of technical sanctions & Project Cost Analysis.
Preparation of annual plan of resurfacing works.
Monitoring of the progress of the works & its reporting.
Preparation of cases for land & environmental clearances.
Costing controlling of the projects.
Budget Division
Preparation of annual budget requirements & its process.
Maintaining of major head wise job side expenditure & its
reporting.
Costing controlling of the projects within allotments.
Contract Division
Preparation of annual plan of tenders & its process. Drafting
of tenders, issue & its acceptance.
Preparation & processing of EOTs, DOs & amendments.
Rate analysis as per the prevailing market trends.
Contract administration & contractual correspondences.
Preparation, scrutiny, process & payment of bills.
Establishment of claims & invoking of
arbitrations/conciliations. Submission of statement of claims,
pleadings & rejoinders.
Attending hearings & making arguments in arbitration.
Drafting of writ petitions & counters of court case of contracts.
Maintaining of tenders & contract documents.
Execution of works
Mobilisation of resources & establishment of camps.
Execution of roads, bridges, culverts, airfields, buildings
etc. Reporting of daily progress of works and resources
deployed. Achievement of laid down targets of works on
monthly basis. Coordination with all the ground staff to
achieve the progress. Ensuring optimum utilisation of
resources.
EXPERIENCE
Areas of excellence : 1. Business Development, Tendering & Rate analysis
2. Estimating & Budgeting
3. Contract Management , Arbitration & Claims
4. Project Planning, Monitoring & Cost Control
Strengths : Sincere & hard working to achieve assigned & desired goal.
Stringent cost control of projects to make them profitable.
Ensuring strict confidentiality and timely actions.
Strict compliance to organization systems and procedures.
Achievements
During working in Central Govt Department, we have
wined many of arbitration awards in favour of the
department and have also implemented after making the
awards rule of court.