PERT AND CPM

WORKERS:
1 ENGINEER
2 POREMAN
8 SKILLED
6 MASON
15 LABOR
32 WORKERS

ASSEMBLE THE ASSEMBLE THE


ASSEMBLE FOR REINFORCEMENT REINFORCEMENT
BARRACKS BEAM FOR SECOND SLAB FOR SECOND
1 DAY FLOOR FLOOR
3-5 DAYS 5-8 DAYS

PLACING THE PLACING THE POURING CONCETE POURING CONCETE


PROCESSING FOR GATHER WORKERS CLEANING AREA ASSEMBLE THE REINFORCEMENT REINFORCEMENT TO FOOTING TO COLUMNS
ASSEMBLE THE ASSEMBLE THE
BUILDING PERMIT 3-5 DAYS 1-2 DAYS REINFORCEMENT REINFORCEMENT REINFORCEMENT FOOTINGS TO EACH COLUMNS TO (24 PCS) (24 PCS)
15-30 DAYS FOOTING (24 PCS) COLUMNS (24 PCS) FTB (38 PCS) HOLE CONNECT FOOTING 1- 2 DAYS 1- 2 DAYS
2-3 DAYS 2-3DAYS 3-5 DAYS 1 DAY 1-2 DAYS

LAY OUT/ MARKING DIGGING FOR DIGGING FOR


1 DAY FOOTINGS FOOTINGS TIE-
24 HOLES BEAMS
8-10 DAYS 9-10 DAYS

PLACING THE POURING CONCETE


REINFORCEMENT TO FOOTING TIE-
FOOTINGS TIE- BEAM
BEAMS 1-2 DAYS
1- 2 DAYS