Does the ASR OHS plan submitted for approval within 30 days of the award of the contract?
Does the Contractor OH&S plan submitted for approval Within 30 days of the award of the
contract.
Safety Leadership Tour established, and senior management team participated.- If yes attach
evidence
OHS Meeting established and senior management team participated.- If yes attached evidence
Safety reward and recognition established for the project. – if yes attached evidence
Required number of HSE personnel appointed on the project in accordance with QCS
2014/ccontractual conditions and approved HSE Manager is working on the project.
OH&S roles and responsibility clearly assigned for all the project team.
OH&S Contractor & Consultant OH&S Manager / Engineer CV submitted for approval within
30 days of the award of the contract.
1. OHS Manager & Dept Manager approved, mobilized for the project and full time
available.
2. ASR OH&S Manager approved and mobilise for the project and full time available.
3. Adequate Number of OHS Officers are appointed for the project (50:1)
Method Statements are reviewed by the HSE Department and HSE confirms that approved MSs are
available at the work location and are understood and followed by the workforce.
The Contractor has established, implement and maintain a process(es) for evaluating compliance with
legal requirements and other requirements
Resources
Temporary work coordinator appointed for the project
Excavation competent / soil competent person appointed for the project
Lifting Authorized person appointed for the project
Contractor developed an internal and external audit schedule and is being followed-
CC Audit Reports are issued. Corrective actions are closed out on time
Inspection Identifies non-conforming issues and records of daily site inspections are issued and
maintained
CC closes out and responds to PWA & SC site inspection findings within specified timeframe.
Management review
Management review conducted regularly.
First Aiders Ratio (1:25) and First Aid Boxes with required contents available at Construction sites and
offices and stocks replenished on usage each day.
Medical personnel contact and reporting information clearly displayed and communicated throughout
site.
Nurse/Dr is implementing health awareness programs and is assessing injuries and illnesses for
trends, possible outbreaks and prevention.
Suitable medical facilities and with staff appropriate to the size of resident population. All staff and
facilities to be examined and licensed by SCH. Medical records of all residents maintained
Appropriate number of trained first aiders with adequate first aid kits provided
Welfare Arrangements
Adequate site offices and toilet facilities
Pest Control, Maintenance and Cleaning regime in place for all facilities. Separate toilet and wash
facilities for female staff as necessary"
Water Coolers provided throughout worksite area (minimum 1 tap/outlet per 20 residents). To be
located so that water is available with in a 3 minute walk of any work point
Washing Facilities (1 x wash basin per 25 workers) to be installed within a reasonable distance from
the worksite area. Hand soap and paper towels to be provided
Toilet facilities private and screened off from public view. (1 x WC and 1 x urinal per 25 workers) to be
located within a 3 minute walk of the worksite area
Screened and covered form the elements, Air-conditioned, properly lit with suitable tables and chairs
for the number fo people dining."
"Food to be stored, transported to site and served in accordance with ISO22000 compliant.