You are on page 1of 5

FAKULTI PENDIDIKAN TEKNIKAL DAN VOKASIONAL

UNIVERSITI TUN HUSSEIN ONN MALAYSIA


86400 BATU PAHAT
JOHOR
ASSIGNMENT 2 : GROUP
TITLE OF ASSIGNMENT
Demolition Waste Management Plan (WMP)
(Demolition and Construction Waste Management)
PROGRAM CODE : BBY
SEM/SESSION : 1 / 2022/2023
COURSE CODE : BBY21104
COURSE NAME : Demolition and Construction Waste Management
LECTURER 1. Mohd Fakrul Adli bin Abdul Razak
2. Ikhwan(Part time lecturer)
LEARNING 1. Student will be able to establish waste management
OUTCOME practice with legislative requirement associated into
demolition waste management and responsibility of
construction good practices.
(CLO 3, PLO8- Leadership, Autonomy and responsibility,
LOD1-Knowledge and understanding, C7-create)

TASK INSTRUCTION:

Waste Management Plan (WMP) is the essential framework for waste management
and good practice in Demolition work.:

Produce a Waste Management Plan (WMP) in associate with:


• Used Provision Guidelines on Construction Waste Management by
CIDB Malaysia.
• Develop a complete outline and synthesis of Waste Management Plan
in demolition work

TASK OF WORK

Group 1: 2 Storey factory


Group 2: 9-16 Storey Concrete Building
Group 3: 9-16 Storey Steel Structure
Group 4: 9-16 Storey Concrete &Steel Structure
Group 5: 9-16 Storey Concrete Highrise Structure
Group 6: 2-4 Storey Concrete and Timber building

SUBMISSION DATE

9th.December, 2022 @ 2359 Hrs ( Week 8 )


REQUIREMENTS:

All report content have to be presented in any format (1.0 spacing, Arial with
the font size of 12) of approximately 5 – 25 pages. The report written in
English will be an added advantage. The content of the assignment should at
least consist of the followings:

(i) Introduction – Organization chart show responsibilities for waste


management, Estimated waste generated, identify waste destination and
transport modes, produce layout for location of designated sorting area
for 3R(Reduce,reuse,recycle)
(ii) Concept and Strategy– Priorities based on legistative waste
management hierarchy, Cradle to Grave concept, Enviromentally friendly
system, identify waste that can be recycle and have market value.
(iii) Objective
(iv) Waste Management Hierarchy – Waste Minimisation Activities,
Recycle,Identified and Exploration of Waste Minimisation Opportunities,
Implementation, Transportation and disposal system
(v) Waste Management Plan –Type and estimated quantity generated
during demolition work, method for CDL waste salvage, reused, recycling,
and disposal during demolition, Proposed method of salvage, method in
handling and transportation procedure. ( sample as Appendix A )
(vi) Conclusion

Assignment meetings (Minutes of Meeting):

1. Student need to attached group members Minutes of Meeting (MoM). The


meeting/discussion using online platform (teams or meet) between group
members. Screenshot and attach in the report. ( Appendix B )

ASSESSMENT:

Report assessment.

No. Assessment criteria Percentage Mark


1 Introduction 10
2 Concept and strategy 15
3. Objective 15
4. Waste Management Hierarchy 15
5. Waste Management Plan 20
6. Conclusion 15
7. Group Minutes of Meeting (min of 4 ) 10

Prepared by;
Mohd Fakrul Adli Bin Abdul Razak
Appendix A: Sample of Waste Management Plan
Appendix A: Sample
Appendix B: Minutes of Meeting
Faculty of Technical Education & Vacational
ASSIGNMENT 2: GROUP BBY21104 YEAR: 2022/2023

ASSIGNMENT 2-GROUP SEM: 1

PROJECT
TITLE

A. GROUP INFORMATION
MEMBER NAME MATRIX ID
M1
M2
M3
M4
M5
M6

B. MEETING AGENDA AND PERSON IN CHARGE


No. Meeting’s Agenda Action

C. PREPARED BY:
MEMBER : NAME: DATE:

You might also like