N Tree type Areas to be planted Total Unit Total Image

o quantity price price


1 AB (243m) one side of road in 1 row & 1m spac.= 243
Hollander GH (191m) both sides of road in 1 row & 0.5m spac
tree (half of its length will be planted)= 382
IJ (187m) both sides of road in 1 row & 0.5m spac.= 748 3550 40 142,000
CD (200m) one side of road in 1 row & 0.5m spac. = 400
OKLM (190m) in 4 rows & 0.5m spac. = 1520
ON (120m) one side of road in 1 row & 0.5m spac. =
240
2 Grevillea DE (293m) one side of road in 2 rows & 1m spac.= 586
tree
586 35 20,510

3 Duranta RI (200m) in 1 row & 0.25m spac. = 800


Geometry 2 (325m) in 1 row & 0.25m spac. = 1,300
Geometry 3 (97) = 388 3264 15 48,960
Geometry 4(97m)= 388
Geometry 6(97m)= 388

5 Geranium Different areas

500 20 10,000

6 Cyperus Different areas

20 350 7000

7 Palm Different areas


/Zenbaba
50 80 4000

8 Apple Geometry 7 50 250 12500


9 Ficus

30 130 3900

10 Different
variety 100 50 5,000
plants
11 Tools Tools 18 Mattock per day for 5 days = 18*100*5=9000 9,000
rental
12 Prof.cost 40,000
Total sum excluding labor and professional cost 253,190 ETB
Total sum excluding professional cost only 262,190 ETB
Total sum including both labor and professional cost 302,190 ETB