CE-4833: Construction Management

Lecture No. 01

Engr. Usman Hussain

Department of Civil Engineering


Course Overview:

• Credit Hours : 3
• Text Book :
– Managing the construction process: estimating scheduling, and project
control, Frederick E. Gould, Pearson Prentice Hall 2010.
– Construction Planning and Scheduling, Jimmie W. Hinze, 3rd Edition

• Reference Book :
– Construction Jobsite William R. Mincks, Hal Johnston, Management,
3rd Edition
– Construction Contracts, Jimmie Hinze, 3rd Edition 2010

September 27, 2022 Department of Civil Engineering 2


Course Overview:

• Course Objectives

– • To develop ability of students in planning and management techniques for


various construction projects.

September 27, 2022 Department of Civil Engineering 3


Course Overview:
• Course Learning Outcomes, CLOs (OBE-System)
Course Learning Outcomes:

At the end of the course, the student will be able:

Taxonomy PLO Content


No. Description
Level mapping Weightage

CLO:1 to assess deterministic and probabilistic models for project (C5) PLO-4 21%-
planning, scheduling and controlling. 39%

CLO:2 to establish understanding on tender evaluation, contract (C6) PLO-3 21%-


law and disputes. 39%

CLO:3 to argue rights and obligations in simple projects as per (A3) PLO-11 21%-
contract documents. 39%
CLO:4 to apply modern tools (Primavera) for Gantt chart in (C3) - 5%-
project scheduling 20%

September 27, 2022 Department of Civil Engineering 4


Course Overview:
• Course Outlines
1. Introduction
• The construction industry, nature and challenges, key players
• Management issues and need for improved organization and management
structures with particular reference to local construction industry, project
management objectives, processes and responsibilities
• Project Life Cycle (PLC)
• Value engineering, normal track versus fast track construction
• Importance of construction management
• Risk Management

2. Project Scoping, Bidding and Preconstruction Planning


• Defining project scope
• Pre-Qualification process
• Bidding process
• Overview of preconstruction planning aspects including area and site
investigation, constructability review, site layout planning, contractor’s site
(team) organization chart, preliminary schedules, mobilization plan

September 27, 2022 Department of Civil Engineering 5


Course Overview:
• Course Outlines
1. Project Planning, Scheduling and Controlling by Deterministic Models
• Work Breakdown Structure
• Project activities and their types
• Estimating activity durations
• Establishing activity sequencing
• Arrow Diagramming Method (ADM) overview
• Precedence Diagramming Method (PDM)
• Scheduling using Rectangular bar chart
• CPM Scheduling
• Determining the minimum total cost of a project
• Resource scheduling and leveling
• Cost loaded schedule
• S-curve
• Cash flow analysis
• Project control during construction
• Record keeping
• Project supervision
• Schedule and Cost Control
• Activity on node

September 27, 2022 Department of Civil Engineering 6


Course Overview:
1. Project Planning, Scheduling and Controlling by Probabilistic Models
• Program Evaluation & Review Technique (PERT)
• Statistical tools including mean, variance and standard Deviation
• Probability distribution
• Beta curves and center limit theorem

2. Tendering
• Preparation of civil engineering contracts and tender documents
• Evaluation of proposals and contracts

3. Overview of Contract Law and Dispute


• Contract express and implied terms, breach of contract, liability for negligence,
statutory and regulatory laws affecting construction, rights and liabilities of
project key stakeholders
• Overview of engineering and professional registration, contractor licensing,
insurance and bonds
• Liquidated damages and penalty/ bonus clauses
• Delays, acceleration, suspension of work, termination. changes, claims, alternate
dispute resolutions techniques

4. Computer Software Application


• Application of computer software (Primavera)
September 27, 2022 Department of Civil Engineering 7
Course Overview:
• Grading Criteria

Sr. No. Grading % of Total Marks

1. Complex Engineering Problems 20

2. Quizzes 20

3. Mid-term Exam 20

4. Final Exam 40

Total 100

September 27, 2022 Department of Civil Engineering 8


Course Overview:
• Grading Criteria

Allocated marks distribution


Allocated
Grading Allocated %age
Marks
Grading Items Marks Total Marks

1 5%
Complex 2 5%
Engineering 20% 100 20 %
Problem 3 5%
4 5%
1 5%
2 5%
Quiz 20% 40 20 %
3 5%
4 5%
Mid-term 20% 20 - 20 %
Final Exam 40% 40 - 40 %
Total marks - 200 - 100 %

September 27, 2022 Department of Civil Engineering 9


Course Overview:
• Tentative Schedule
Schedule
Assessment Item
Announcement
Week Due Week
CEP Part I (a) 02 04
Complex Engineering CEP Part 1 (b) 05 07
Problem CEP Part II (a) 10 12
CEP Part II (b) 13 15
Quiz 1 02 03
Quiz 2 05 06
Quiz
Quiz 3 10 11
Quiz 4 14 15
Mid-term - - 08
Final Exam - - 16
Note : The schedule of Assignment Submissions shall be strictly followed.

September 27, 2022 Department of Civil Engineering 10


Class Discipline

September 27, 2022 Department of Civil Engineering 11


Introduction:

• What is Construction ?

• Construction is the process of building some facility physically.


• Construction is the process of preparing and forming buildings and
building systems. Construction starts with planning, design, and
financing and continues until the structure is ready for occupancy

September 27, 2022 Department of Civil Engineering 12


Introduction:
• What is Construction ?

• Building
• Roads / Highway
• Airport
• Dam
• Tunnel
• Bridge

September 27, 2022 Department of Civil Engineering 13


September 27, 2022 Department of Civil Engineering 14
Introduction:

• Nature of Construction Industry


• Fragmented
• 3 D (Difficult , Dirty, Dangerous)

September 27, 2022 Department of Civil Engineering 15


Introduction:
• Scope of Civil Engineering works
The main scope of civil engineering or the task of civil engineering is
• planning
• designing
• estimating
• supervising construction
• managing construction
• execution
• maintenance of structures

September 27, 2022 Department of Civil Engineering 16


Introduction:

• What is Construction Management?

▪ Construction Management is process of the planning, coordinating,


and building of a project from conception to completion.
▪ Is a technique to oversee the planning, design, and construction of a
project, from its beginning to its end.
▪ Construction management is the overall planning, coordination, and
control of a construction process from beginning to completion.

September 27, 2022 Department of Civil Engineering 17


Introduction:
• What is Construction Management?
▪ The purpose of CM is to
▪ control a project's time, cost and quality.
▪ Meet the client's requirement in order to produce a functionally
and financially viable project.

September 27, 2022 Department of Civil Engineering 18


Introduction:
• Objectives of Construction Management

– To specifying project objectives and plans


• including description of scope, budgeting, scheduling, setting
performance requirements, and selecting project participants.

– Maximizing the resource efficiency through procurement of labor,


materials and equipment.

September 27, 2022 Department of Civil Engineering 19


Introduction:
• Objectives of Construction Management
– Implementing various operations through proper coordination and control of
• planning,
• design,
• estimating,
• contracting and construction in the entire process.
– Developing effective communications and mechanisms for resolving conflicts.

September 27, 2022 Department of Civil Engineering 20


Introduction:
• Project Life Cycle
– Phases

September 27, 2022 Department of Civil Engineering 21


Introduction:
• Key Players in Construction Project

September 27, 2022 Department of Civil Engineering 22


Introduction:
• Who is Construction Manager

September 27, 2022 Department of Civil Engineering 23


Introduction:
• Who is Construction Manager
A construction manager is person who
– plans
– coordinates
– budgets/ estimates
– supervises
A construction projects from early development to completion.

September 27, 2022 Department of Civil Engineering 24


Introduction:
• What does a construction Manager Do
– Prepare and negotiate cost estimates, budgets, and work timetables
– Select appropriate construction methods and strategies
– Interpret and explain contracts and technical information to workers and
other professionals
– Report on work progress and budget matters to clients
– Collaborate with architect, engineers and other construction and building
specialists
– Instruct and supervise construction personnel and activities onsite
– Respond to work delays and other problems and emergencies
– Select, hire, and instruct laborers and subcontractors
– Comply with legal requirements, building and safety codes, and other
regulations

September 27, 2022 Department of Civil Engineering 25


Introduction:
• Responsibilities of a Construction Manager
There are certain tasks that are performed by construction managers. These
include:
– Quality management. Construction projects quite often involve a number
of contractors and subcontractors.
• One of the most important jobs of the construction manager is making
certain everyone is doing quality work and not cutting any corners
along the way.
– Cost management. A good construction manager is constantly on top of
costs and makes the necessary adjustments when unexpected
complications or issues arise.
– Safety management. Construction managers need to be able to identify
and eliminate possible safety hazards for the good of everyone on the job
site.

September 27, 2022 Department of Civil Engineering 26


Introduction:
• Responsibilities of a Construction Manager
– Contract administration. It is the job of the construction manager to
ensure that every provision of the contract is being met and that all parties
involved are happy.
– Contractual Communication . Construction managers need to keep all
parties involved well informed throughout the whole project. It includes
the
• client,
• the architect
• any contractor or subcontractor involved.
• If issues arrive, the manager must be in the position to deal with them
immediately.

September 27, 2022 Department of Civil Engineering 27