Surface
Casing
Production Tubing
Casing
Packer
Perforated
Interval
RESERVOIR
• Selective production
• Zonal Isolation
• Water/Gas Shut-off
Disadvantage:
Application:
• Consolidated formation.
• Multi reservoirs with different pressures.
• When dual Completions are required
Copyright 2007, , All rights reserved
OPEN HOLE
COMPLETION
Surface
Casing
Production Tubing
Casing
Packer
RESERVOIR
Advantage:
• Simple
• Saving in cost and time
Disadvantage:
• No selective control
• Difficult to isolate water or gas Breakthrough
• Cross flow can not be controlled
• Not suitable for unstable Formation
Application:
• Low cost/multi well developments
• Deep consolidated wells.
• Naturally Fractured reservoirs.
Copyright 2007, , All rights reserved
OPEN HOLE COMPLETION WITH
SLOTTED, PERFORATED OR SCREEN
LINER
SURFACE TUBING
CASING
PACKER
RESERVOIR
Advantage:
• Simple
• Cheeper than cemented casing
• Sand control
Disadvantage:
• No selective control
• Difficult to isolate water or gas Breakthrough
• Cross flow can not be controlled
• Not suitable for unstable Formation
Application:
SURFACE TUBING
CASING
PACKER
RESERVOIR
Tubing
Packer
Liner Hanger
Production Casing
Slotted, Perforated Underreamed hole
or Screen Liner
RESERVOIR
Gravel
Tubing
Packer
Liner Hanger
RESERVOIR
Gravel
Copyright 2007, , All rights reserved
FRAC AND PACK COMPLETION
Tubing
Packer
Liner Hanger
RESERVOIR
Tubing
Packer
Production Casing
Slotted, Perforated
or Screen Liner Underreamed Casing/Hole
RESERVOIR
Gravel
SLIDING SLEEVES
ZONE 1
ZONE 2
ZONE 3
Top Packer
OPEN CLOSED
Sliding Sleeve
Anim. 1
Copyright 2007, , All rights reserved Anim. 2