P.M Homework 5
P.M Homework 5
GROUP MEMBERS
Adidi Oghenetega Shadrack- 22119144
Mukhtar Aliyu Musa- 22205892
David Sonny Ikpah- 22211210
8/10/2022
PROJECT TITLE CIU DORMITORY FOR BOYS AND GIRLS CONSTRUCTION COMPANY XYX CONSTRUCTION
PROJECT NAME COMPANY LTD.
PROJECT MUKHTAR ALIYU MUSA DATE 8/10/2022
MANAGER
Construction of CIU
Dormitory
1.1: Site Clearing 2.1: Cost Estimation 3.1: Building Foundation 4.1: Removing of scrab 5.1: Releasing the Project
1.2: Fencing 2.2: Buying Materials and 3.2: Building a Structure 5.2: Dissolution of the team
Equipments
WBS ID Task
0 Construction of CIU Dormitory
1 Site Preparation
1.1 Site Clearing
1.2 Fencing
2 Buying Resources
2.1 Cost Estimation
2.2 Buying Materials and Equipment
2.3 Recruiting Manpower
3 Construction
3.1 Building Foundation
3.2 Building a Structure
3.3 Painting
4 Cleaning
4.1 Removing of scrab
5 Handover Deliverables
5.1 Releasing the Project
5.2 Dissolution of the team
WBS DICTIONARY
Level WBS ID Element Definition Responsible
Name Organisation
Individual task: kindly complete the wbs dictionary datas (refer to lecture 4 slides 39)
David- from site preparation to construction (1-3)