Professional Documents
Culture Documents
∅ = 37.5° 𝑒 = 0.6
𝛾𝑠 = 2.65 𝑇𝑛/𝑚 3 𝑐=0 0.6
𝐷. 𝑁. 𝐹.
∅ = 23.5°
𝐶 = 0.8𝑇𝑛/𝑚 2 0.8
B*B
𝛾𝑠 = 1.82 𝑇𝑛/𝑚 3
𝑒 = 0.45
B=1.2m
PS=3.0
PARTE (A)
𝑞𝑢 = 1.3 ∗ 𝐶 ∗ 𝑁𝑐 + 𝑞 ∗ 𝑁𝑞 + 0.4 ∗ 𝛾′ ∗ 𝑁𝛾 ∗ 𝐵
- DENSIDADES
Suelo 1: SECO
𝛾𝑠
𝛾𝑑 =
1+𝑒
2.65
𝛾𝑑 =
1 + 0.6
𝛾𝑑 = 1.656 𝑇𝑛/𝑚 3
Suelo 2: SECO
𝛾𝑠
𝛾𝑠 =
𝛾𝑤
𝛾𝑠 = 1.82
𝛾𝑠
𝛾𝑑 =
1+𝑒
1.82
𝛾𝑑 =
1 + 0.45
𝛾𝑑 = 1.255 𝑇𝑛/𝑚 3
𝛾𝑠 + 𝑒
𝛾𝑠𝑎𝑡 = ∗ 𝛾𝑤
1+𝑒
1.82 + 0.45
𝛾𝑠𝑎𝑡 = ∗1
1 + 0.45
𝛾𝑠𝑎𝑡 = 1.566𝑇𝑛/𝑚 2
Esf. Totales:
𝜎𝐴 = 0
𝜎𝐵 = 0 + 0.6 ∗ 1.656 = 0.994𝑇𝑛/𝑚 2
𝜎𝐶 = 0.994 + 0.8 ∗ 1.566 = 2.247𝑇𝑛/𝑚 2
Esf. Neutros:
𝜇𝐴 = 0
𝜇𝐵 = 0
𝜇𝐶 = 0 + 1 ∗ 0.8 = 0.8𝑇𝑛/𝑚 2
Esf. Efectivos:
𝜎𝐴′ = 0
𝜎𝐵′ = 0.994 − 0 = 0.994𝑇𝑛/𝑚 2
𝜎𝐶 ′ = 2.247 − 0.8 = 1.447𝑇𝑛/𝑚 2 = 𝑞
- DENSIDAD:
CASO I:
0 ≤ 𝐷1 ≤ 𝐷𝑓
0 ≤ 0.6 ≤ 1.6
𝑁𝑞 = 9.119
𝑁𝑞 − 1
𝑁𝑐 =
tan ∅
𝑁𝑐 = 18.672
𝑁𝛾 = 2 ∗ (𝑁𝑞 + 1) ∗ tan ∅
𝑁𝛾 = 8.8
- REEMPLAZANDO DATOS:
𝑞𝑢 = 1.3 ∗ 𝐶 ∗ 𝑁𝑐 + 𝑞 ∗ 𝑁𝑞 + 0.4 ∗ 𝛾′ ∗ 𝑁𝛾 ∗ 𝐵
𝑞𝑢 = 35𝑇𝑛/𝑚 2
𝑞𝑢
𝑞𝑎𝑑𝑚 =
𝑃𝑆
35
𝑞𝑎𝑑𝑚 =
3
𝑞𝑎𝑑𝑚 = 11.667𝑇𝑛/𝑚 2
𝑞𝑎𝑐𝑡 = 𝑞𝑎𝑑𝑚
𝑃
= 11.667
𝐵2
𝑃 = 16.8𝑇𝑛
PARTE (B)
𝑀𝑦 = 2.5𝑇𝑛. 𝑚
𝑃 = 16.8𝑇𝑛
𝑀𝑦 = 2.5𝑇𝑛. 𝑚
𝑃 = 16.8𝑇𝑛
𝐵 = 1.20𝑚
𝜎 𝑚𝑖𝑛
𝜎 𝑚á𝑥
𝐿 = 1.2𝑚
𝐵 = 1.2𝑚
𝑃 𝜎𝑀𝑦
𝜎 𝑚á𝑥/𝜎 𝑚𝑖𝑛 = ±
𝐵𝐿 𝐿𝐵2
16.8 6 ∗ 2.5
𝜎 𝑚á𝑥 = + = 20.35𝑇𝑛/𝑚 2
1.2 ∗ 1.2 1.2 ∗ 1.22
16.8 6 ∗ 2.5
𝜎 𝑚𝑖𝑛 = − = 2.97𝑇𝑛/𝑚 2
1.2 ∗ 1.2 1.2 ∗ 1.22