EMERGENCY EQUIPMENT Issue date: 10.8.2020


QUESTION BANK
Rev: 01

EMERGENCY FLOTATION SYSTEM

(CMM 25-69-30)

1. Minor inspection are: Corresponds to visual inspection + leak test,


for floats: (1) (2)
a) Correct.
b) Incorrect.
Refer : ( Page 2/ 2 )
2. Major inspection are: Corresponds to visual inspection + leak test +
proof pressure test + pressure relief valves test + bulkhead test, for
floats: (1) (2)
a) Correct.
b) Incorrect.
Refer : ( Page 2/ 2 )
3. How many separate floats are provided to give buoyancy to the
Helicopter: (1)
a) Two separate floats.
b) Four separate floats.
Refer : ( Page 2/ B )
4. The floats are inflated to their final shapes within: (1)
a) t ≤ 5 seconds.
b) t ≤ 8 seconds.
Refer : ( Page 2/ B )
5. Each aft float is divided into five pressure-tight compartments: (1)
a) Correct.
b) Incorrect.
Refer : ( Page 4/ 2 a)

6. All the floats compartments are fitted with pressure relief valves
calibrated at an opening gage pressure: (2) (3)

Page 1
Page: 2

EMERGENCY EQUIPMENT Issue date: 10.8.2020


QUESTION BANK
Rev: 01

a) P = 240 hPa
b) P = 345 hPa.
c) P = 370 hPa.
Refer : ( Page 5/ 2)
7. R/H AFT float assembly is made of two polyamide backing fabrics
coated on one and both sides with polyurethane: (1)
a) Correct.
b) Incorrect.
Refer : ( Page 11/ B 2)

8. Washing of cover assemblies: (1)

a) Cleaning the cover assemblies with a detergent solution,


b) Rinse with water, and dry.
c) a & b.
Refer : ( Page 401/ 4)
8. Floats visual inspection with Lightly inflate the floats: P < 50hPa
through the manual inflating/deflating valves: (2) (3)

a) Correct.

b) Incorrect.

Refer : ( Page 503/ d)

10. Inflate the float to a pressure to Carry out a leak test: (2) (3)

a) 150 hpa.
b) 170 hpa.
c) 200 hpa.
Refer : ( Page 505/ F.4)

11. After 30 minutes, adjust the pressure to: (2) (3)

a) 150 hpa.
b) 170 hpa.

Page 2
Page: 3

EMERGENCY EQUIPMENT Issue date: 10.8.2020


QUESTION BANK
Rev: 01

c) 180 hpa.
Refer : ( Page 505/ F.4)

12. After 3 hours, check the pressure drop, which should not exceed: (2)
(3)

a) 50 hpa.
b) 60 hpa.
c) 80 hpa.
Refer : ( Page 507/ F.5)

13. Standard proof pressure test inflate the float through the various
Manual inflating/deflating valves simultaneously, until pressure is
stabilized at the standard test value of: (2) (3)

a) 300 hpa.
b) 360 hpa.
c) 400 hpa.
Refer : ( Page 507/ 1.d)

14. Standard proof pressure test: Maintain pressure for 5 minutes.


Drop pressure to 50hPa & carefully inspect the float surface, particularly
around the assemblies: (2) (3)

a) Correct.

b) Incorrect.

Refer : ( Page 507/ 1 e,f)

15. Pressure relief valves opening pressure: (2) (3)

a) 280 to 300 hPa.


b) 300 to 360 hPa
c) 325 to 365 hPa.

Refer : ( Page 507/ 2)


Page 3
Page: 4

EMERGENCY EQUIPMENT Issue date: 10.8.2020


QUESTION BANK
Rev: 01

16. Pressure relief valves closing values: (2) (3)

a) 250 hPa.
b) 260 hPa mini.
c) 270 hPa.
Refer : ( Page 508/ f)

17. Bulkhead test is required to verify the structural integrity of each


of the two bulkheads: (2) (3)

a) Correct.

b) Incorrect.

Refer : ( Page 508/ D)

18. Inflate alternating chambers (every other one) through the


manual inflating/deflating valve to: (2) (3)

a) 190 hpa.
b) 200 hpa.
c) 210 hpa
Refer : ( Page 508/ D.1)

19. After 30 minutes, adjust the pressure to: (2) (3)

a) 150 hpa.
b) 170 hpa.
c) 180 hpa.
Refer : ( Page 508/ D.2)

20. After 1 hour, the pressure in the inflated chambers must be


greater than:

(2) (3)

a) 150 hpa.

Page 4
Page: 5

EMERGENCY EQUIPMENT Issue date: 10.8.2020


QUESTION BANK
Rev: 01

b) 162 hpa.
c) 170 hpa.
Refer : ( Page 508/ D.3)

21. Floats overhaul have to be returned to Zodiac Aerospace


Services for any of the following reasons: (1) (2)

a) In case of ditching.
b) In case of serious defects found during the Minor inspection:

leak tests, movement of seams,worn fabric, major wear or

warping on metallic parts, etc.

c) After 10 years.
d) In case of accidental inflation.
e) All.
Refer : ( Page 509/ G)

22. After repairing patch. Let the adhesive dry for at least: (1)

a) 24 hours.
b) 46 hours.
c) 64 hours.
Refer : ( Page 608/ f)

23. How many hours after the proof pressure test, perform a leak
test: (1)

a) 12 hours.
b) 20 hours.
c) 30 hours.
Refer : ( Page 608/ h)

24. Tightening torque values 5 PSI PRESSURE RELIEF VALVE:


(3)

Page 5
Page: 6

EMERGENCY EQUIPMENT Issue date: 10.8.2020


QUESTION BANK
Rev: 01

a) 0.5 daN.m.
b) 1 daN.m.
c) 2 daN.m.
Refer : ( Page 801)

25. Tightening torque values MANUAL INFLATION/DEFLATION


VALVE: (3)

a) 0.5 daN.m.
b) 1 daN.m.
c) 2 daN.m.
Refer : ( Page 801 )

26. Tightening torque values SUPPLY COUPLING: (3)

a) 0.5 daN.m.
b) 1 daN.m.
c) 2 daN.m.
Refer : ( Page 801 )

27. Tightening torque values SET SCREW: (3)

a) 0.5 daN.m.
b) 0.8 daN.m.
c) 0.9 daN.m.
Refer : ( Page 801 )