You are on page 1of 4

Page: 1

EMERGENCY EQUIPMENT Issue date: 10.8.2020


QUESTION BANK
Rev: 01

LIFEJACKET MK-28 ( CMM 25-60-47 )


1. The inflatable stole is manufactured from:(1)
a) Polyurethane coated nylon fabric dyed orange.
b) Hard-wearing polyester fabric.
Refer : ( Chapter 2/ Page 3/ 2.9.1)
2. How many panels are there the stole comprises of ?(1)
a) Two panels.
b) Three panels.
Refer :( Chapter 2/ Page 3/ 2.9.2)
3. The pouch is manufactured from:(1)
a) Polyurethane coated nylon fabric
b) Hard-wearing polyester fabric, dyed black.
Refer :( Chapter 2/ Page 2/ 2.8.1)
4. Maintenance schedule is:(1) (2)
a) Exceeding 12 months.
b) At any time if they have been inflated.
c) At any time if they are, or are suspected of being damaged.
d) At any time if the pouch has been opened by unauthorized persons.
e) a.b.c.d.
Refer :( Chapter 3/ Page 1)
5. The stole can be cleaned using:(1)
a) Solution of 1 part acid free detergent to 99 parts lukewarm water.
b) Mek or Toluene.
c) Water.
Refer :( Chapter 5/ Page 1)
6. The stoles are to be replaced if damage to the welded seams:(1) (2)
a) Correct.
b) Incorrect.
Refer :( Chapter 8/ Page 1/ 8.2.1.3 )
7. Test procedure: Slowly inflate the stole to a pressure of: (2) (3)
a) 80 cm.wg.
b) 90 cm.wg.
c) 100 cm.wg.
Refer :( Chapter 7/ Page 2/ 7.3.4 )
Page: 2
EMERGENCY EQUIPMENT Issue date: 10.8.2020
QUESTION BANK
Rev: 01

8. Leave the stole to settle for a period of first time:(2) (3)


a) 05 minute.
b) 10 minute.
c) 15 minute.
Refer : ( Chapter 7/ Page 2/ 7.3.5 )
9. The difference between the initial pressure figure & the final
adjusted figure shall not be greater than: (2) (3)
a) 05 mm.wg.
b) 10 mm.wg.
c) 15 mm.wg.
Refer :( Chapter 7/ Page 3/ 7.3.13 )
10. Required to test the inflatable stole: (1)
a) Nomal air.
b) Oil free air compressor.
c) N2.
Refer :( Chapter 7/ Page 1/ 7.1.1.1 )
11. For each degree Celsius RISE in temperature over the test period,
shall be SUBTRACTED from the final pressure reading is: (2) (3)
a) 30 mm.wg.
b) 38 mm.wg.
c) 42mm.wg.
Refer :( Chapter 7/ Page 1/ 7.2.4 )
12.For each degree Celsius FALL in temperature over the test period,
shall be ADDED from the final pressure reading is: (2) (3)
a) 25 mm.wg.
b) 35 mm.wg.
c) 38 mm.wg.
Refer :( Chapter 7/ Page 1/ 7.2.5 )
13.The stole is inflated with ? ? ? disposable cylinder: (1)
a) Heli.
b) CO2.
c) O2
Refer :( Chapter 2/ Page 4/ 2.13.1)
Page: 3
EMERGENCY EQUIPMENT Issue date: 10.8.2020
QUESTION BANK
Rev: 01

14.Shall be replaced with a MC Murdo LJ1 battery when batteries that


have:(1)
a) Expired.
b) Defective.
c) a & b.
Refer :( Chapter 2/ Page 6/ 2.14.4.4)
15.Replace CO2 cylinder when:(1) (2)
a) Corrosion, dent, condition of threads & legibility of stamped details.
b) Damaged or suspect.
c) Outside the weight tolerance.
d) a & b & c.
Refer :( Chapter 6/ Page 4/ 6.4)
16.Replace any pouch which is:(1) (2)
a) Damaged or defective.
b) Expired.
Refer :( Chapter 6/ Page 5/ 6.7.13)
17.During the test period, the test shall be declared invalid and repeated.
When the variation in temperature exceed:(2) (3)
a) 2 Degrees Celsius.
b) 3 Degrees Celsius.
c) 4 Degrees Celsius.
Refer :( Chapter 7/ Page 1/ 7.2.6)
18.Stole are to be replaced if:(2) (3)
a) Holes or tears greater than 15 mm in diameter length.
b) Holes or tears within 30 mm of a seam, valve stem or oral inflate tube.
c) Damage to the welded seams. Areas around the valve stem or oral
inflate tube. More than one patch to be applied to each panel of the
stole.
d) a & b & c
Refer :( Chapter 8/ Page 1/ 8.2)
19. Attach the chrome cap nut to the valves stem torque loading to: (2)
(3)
a) 20 lb/in.f.
b) 30 lb/in.f.
Page: 4
EMERGENCY EQUIPMENT Issue date: 10.8.2020
QUESTION BANK
Rev: 01

c) 40 lb/in.f.
Refer :( Chapter 9/ Page 3/ 9.24)
20.Attach the cylinder into the inflation mechanism, torque loading to:
(2) (3)
a) 30 lb/in.f.
b) 40 lb/in.f.
c) 45 lb/in.f.
Refer : ( Chapter 9/Page 3/ 9.33)