You are on page 1of 51

QF-PIM-03

POWER GRID COMPANY OF BANGLADESH LTD.


PROGRESS REPORT ON TRANSMISSION LINE CONSTRUCTION

Name of the work: 400kV Payra-Gopalgonj Transmission Line Project


Name of the Consultant:
Name of the Contractor: GS Engineering & Construction Corp., Korea
Contract No. & date: PGCB/400kV/PAT-GOP/TL, 24.05.2017
Completion Date: 13.05.2019

Total Weightage Work Completed as on (Weightage):


Sl. No. Description
Weightage Weightage
Qty. Unit Qty. Unit
(%) (%)

Survey including submission


1 169 km 5% 162.05 km 4.79%
of plan and profile, soil test.

Design, approval and tower


2 8 No 5% 5 No 3.13%
test.

3 Foundation Pile. 483 Lot 27% 310 Lot 17.33%

4 Pile Cap. 483 Lot 10% 105 Lot 2.17%

5 Supply. 483 Lot 30% 91 Lot 5.65%

6 Tower Erection. 483 Lot 10% 64 Lot 1.33%

7 Stringing. 483 km 8% km 0.00%

Route clearance, Testing and


8 169 km 5% km 0.00%
Commissioning.

Total Work 100% 34.40%

Work Remaining 65.6%


QUALITY POWER GRID COMPANY OF BANGLADESH
MANAGEMENT QUALITY FORMS
TITLE : PROGRESS REPORT ON TRANSMISSION LINE CONSTRUCTION
SYSTEM
Temperature 31.7°C REPORTING DATE : 14.08.2018
Relative Humudity 99% Weather Condition: Thunderstorm

NAME OF THE PROJECT Aminbazar-Gopalganj 400kV Double Circuit Transmission Line


CONTRACTOR SEPCO1-MIL JV
CONTRACT NO. PGCB/ADB/3522/400KV/TL/AGTL
DATE OF CONTRACT 23rd December, 2018
COMPLETION TIME 720 days
COMPLETION DATE 13 May, 2019
ROUTE LENGTH 400kV (160km) + 132kV (9km)
TOTAL NOS. OF TOWER 214

Contract Value Certified Disbursed


USD EURO USD EURO USD EURO
FINANCE STATUS 111,862,792.00 5,005,482.00 11,363,365.90 500,548.20 10,477,024.27 463007.09
BDT BDT BDT
4,855,496,035.00 727,916,136 624,844,535

PROGRESS STATUS AS ON
Route Map Approved : 74.625 km Profile Drawing Approved : 74.625 km
PROGRESS SUMMARY TOWER WORK COMPLETED: 47 Towers Balance: 167 Towers
UPDATED PILE COMPLETED: 262

PARTICULARS TYPE QUANTITY COMPLETED BALANCE


4DLT 134 Err:508 Err:508
4D1T 19 Err:508 Err:508
4D25T 35 46 -11
PILE WORK
4D45T 16 22 -6
4DT6 10 4 6
TOTAL 214 Err:508 Err:508

PARTICULARS TYPE QUANTITY COMPLETED BALANCE


4DLT 326 105 221
4D1T 14 0 14
4D25T 62 0 62
4D45T 29 0 29
PILE CAP WORK 4DT6 10 0 10
4DR 8 0 8
4DAX 8 0 8
132kV 26 0 26
TOTAL 483 105 378

T1/3 T27/4 T58A


T8 T30A/1
T11B T32A
T20/2 T36
Piling T21A T20
On-Going (20) T24 T55
T24A
T24A/1 T56D
T25/5 T56D/2
T26/4 T57A/5
T2/2 T11B/3 T35/1 T46B

Status T2/3 T14A T35B/1 T51

T4A/6 T16/3 T36A/3 T56B/1


Pile Cap T6A/5 T16/5 T36A/7 T58/3
On-Going (32) T8/1 T28B/3 T37 T58A/4
T8/2 T28B/7 T38/1
T8A T33 T42/1
T11A T33A/2 T44
T11B/1 T35/1 T44A

Mobilization/Pile
T1/1, T20, T22, T30A/2, T32/1, T54/1, T56A/1, T56/2, 57A/4
(9)
#Route Alignment #Detail Survey
Plan til 74.625 km Plan till December 74.625 km
Submitt74.625 km Submitted 74.625 km
Approve74.625 km Approved by GOPA 74.625 km
Approved by PGCB 74.625 km
#Detail Status

Tower AP Tower ID Tower Type Raise Chimney Soil Category


No

1 Terminal Tower TT1 4DT6 Ext. 9 3

2 AP-38 T38 4D25 Ext. 9 2 2

3 T38/1 4D1 Ext. 30 2 3

4 T38/2 4DL Ext. 6 3

5 T38/3 4DL Ext. 4.5 3

6 T38/4 4DL Ext. 4.5 3

7 T38/5 4DL Ext. 3 3

8 AP-39 T39 4D25 Ext. 3 2

9 T39/1 4DL Ext. 3 2

10 T39/2 4DL Ext. 3 2

11 T39/3 4DL Ext. 3 3

12 T39/4 4DL Ext. 3 3

13 T39/5 4DL Ext. STD 3

14 T39/6 4DL Ext. STD 3

15 AP-40 T40 4D25 Ext. STD 2

16 T40/1 4DL Ext. 4.5 4

17 T40/2 4DL Ext. 4.5 4

18 T40/3 4DL Ext. 6 3

19 T40/4 4DL Ext. 9 4

20 T40/5 4DL Ext. 9 4

21 T40/6 4DL Ext. 3 4


22 T40/7 4DL Ext. 6 3

23 AP-40A T40A 4D25 Ext. 9 4

24 T40A/1 4DL Ext. STD 3

25 T40A/2 4DL Ext. STD 2

26 T40A/3 4DL Ext. STD 3

27 AP-41 T41 4D25 Ext. 3 4

28 T41/1 4DL Ext. 6 3

29 T41/2 4DL Ext. 6 3

30 T41/3 4DL Ext. 6 4

31 AP-41A T41A 4D25 Ext. 6 4

32 T41A/1 4DL Ext. STD 3

33 T41A/2 4DL Ext. STD 2

34 AP-42 T42 4D25 Ext. 6 3

35 T42/1 4DL Ext. 9 2

36 T42/2 4DL Ext. 6 4

37 AP-43 T43 4D25 Ext. 6 4

38 T43/1 4DL Ext. 9 4

39 AP-43A T43A 4D45 Ext. 9 3

40 AP-44 T44 4D25 Ext. 9 2 3

41 T44/1 4D1 Ext. 30 3.2 3

42 T44/2 4D1 Ext. 40 3.2 3

43 T44/3 4D1 Ext. 9 2.45 3

44 AP-44A T44A 4D25 Ext. 3 4

45 T44A/1 4DL Ext. 6 3

46 T44A/2 4DL Ext. 3 3

47 AP-45 T45 4D25 Ext. 3 4

48 T45/1 4DL Ext. 4.5 2

49 T45/2 4DL Ext. 6 3

50 AP-45A T45A 4D45 Ext. 3 4


51 T45A/1 4DL Ext. 9 3

52 T45A/2 4DL Ext. 9 3

53 AP-45B T45B 4D25 Ext. 9 3

54 T45B/1 4DL Ext. 9 4

55 AP-46 T46 4DT6 Ext. STD 3

56 T46/1 4DL Ext. STD 3

57 T46/2 4DL Ext. STD 2

58 T46/3 T46A 4D45 Ext. STD 3

59 AP-46A T46A/1 4DL Ext. 3 3

60 T46A/2 4DL Ext. 4.5 3

61 T46A/2 T46A/3 4DL Ext. STD 3

62 AP-47 T47 4D25 Ext. STD 4

63 T47/1 4DL Ext. STD 4

64 AP-47A T47A 4DT6 Ext. 3 4

65 T47A/1 4DL Ext. 6 3

66 T47A/2 4DL Ext. 6 3

67 T47A/3 4DL Ext. 6 4

68 AP-47B T47B 4D25 Ext. 9 3

69 T47B/1 4DL Ext. 9 3

70 T47B/2 4DL Ext. 6 3

71 T47B/3 4DL Ext. 9 3

72 AP-48 T48 4D25 Ext. STD 3

73 T48/1 4DL Ext. 3 3

74 T48/2 4DL Ext. STD 2

75 AP-48A T48A 4D45 Ext. STD 3

76 AP-48B T48B 4D25 Ext. 1.5 4

77 T48B/1 4DL Ext. 4.5 3

78 AP-48C T48C 4D25 Ext. 3 3

79 T48C/1 4DL Ext. 4.5 3

80 T48C/2 4DL Ext. STD 2


81 AP-49 T49 4D45 Ext. STD 3

82 T49/1 4DL Ext. STD 4

83 T49/2 4DL Ext. STD 4

84 AP-49A T49A 4D25 Ext. 4.5 3

85 AP-49B T49B 4D45 Ext. 6 2

86 AP-50 T50 4D25 Ext. STD 3

87 AP-50A T50A 4D25 Ext. STD 4

88 T50A/1 4DL Ext. 3 3

89 T50A/2 4DL Ext. 3 4

90 T50A/3 4DL Ext. 3 2

91 AP-50B T50B 4D25 Ext. 1.5 3

92 T50B/1 4DL Ext. STD 3

93 AP-51 T51 4D25 Ext. 9 4

94 T51/1 4D1 Ext. 12 4

RC T52 4DAX

RC T53 4DAX
95 AP-54 T54 4DT6 Ext. 9 1 4

96 AP-55 T55 4DT6 Ext. STD 4

97 T55/1 4DL Ext. 6 3

98 T55/2 4DL Ext. STD 1 2

99 AP-56 T56 4D45 Ext. 1.5 1 4

100 T56/1 4DL Ext. 9 1 2

101 T56/2 4DL Ext. 9 1 3

102 T56/3 4DL Ext. 9 1 2

103 AP-57 T57 4D25 Ext. 6 1 3

104 T57/1 4DL Ext. STD 1 2

105 T57/2 4DL Ext. 3 1 3

106 T57/3 4DL Ext. 3 1 3

107 T57/4 4DL Ext. 1.5 1 3

108 AP-58 T58 4D25 Ext. STD 1 3


109 T58/1 4DL Ext. STD 1 3

110 T58/2 4DL Ext. 6 1 4

111 T58/3 4DL Ext. 4.5 1 3

112 T58/4 4DL Ext. 4.5 1 3

113 T58/5 4DL Ext. 1.5 1 3

114 T58/6 4DL Ext. 6 1 3

115 AP-59 T59 4D45 Ext. 3 1 4

116 T59/1 4DL Ext. 4.5 1 2

117 T59/2 4DL Ext. 3 1 2

118 T59/3 4DL Ext. STD 1 3

119 T59/4 4DL Ext. 4.5 1 3

120 T59/5 4DL Ext. 9 1 3

121 AP-60 T60 4D45 Ext. STD 1 4

122 T60/1 4DL Ext. 1.5 1 3

123 T60/2 4D1 Ext. 30 2

124 T60/3 4D1 Ext. 30 2

125 T60/4 4DL Ext. 1.5 2

126 AP-61 T61 4D25 Ext. 4.5 1 4

127 T61/1 4DL Ext. STD 2 3

128 T61/2 4DL Ext. STD 2 3

129 T61/3 4D25 Ext. STD 2 3

130 T61/4 4D1 Ext. 25 2 3

131 T61/5 4D1 Ext. 25 2 2

132 AP-62 T62 4D25 Ext. 3 2 4

133 T62/1 4DL Ext. STD 1 3

134 T62/2 4DL Ext. STD 1 3

135 T62/3 4DL Ext. STD 1 3

136 T62/4 4DL Ext. 4.5 1 3

137 T62/5 4DL Ext. 6 1 3

138 T62/6 4DL Ext. 4.5 1 3


139 T62/7 4DL Ext. 4.5 1 3

140 T62/8 4DL Ext. 4.5 1 3

141 T62/9 4DL Ext. 1.5 1 3

142 AP-63 T63 4D45 Ext. STD 4

143 T63/1 4DL Ext. 3 1 3

144 T63/2 4DL Ext. 4.5 1 3

145 T63/3 4DL Ext. 6 1 3

146 T63/4 4DL Ext. 6 1 3

147 T63/5 4DL Ext. 6 1 3

148 T63/6 4DL Ext. 6 1 3

149 AP-64 T64 4D25 Ext. 1.5 1 4

150 T64/1 4DL Ext. 3 1 2

151 T64/2 4DL Ext. STD 3

152 T64/3 4DL Ext. STD 4

153 AP-65 T65 4D25 Ext. STD 4

154 T65/1 4DL Ext. 1.5 1 3

155 T65/2 4DL Ext. 3 1 3

156 T65/3 4DL Ext. 3 2

157 AP-66 T66 4D45 Ext. 9 1 4

158 T66/1 4DL Ext. 9 1 3

159 T66/2 4DL Ext. 4.5 2 3

160 T66/3 4DL Ext. 9 1 3

161 T66/4 4D1 Ext. 40 1 2

162 AP-67 T67 4D25 Ext. 9 1 3

163 T67/1 4D1 Ext. 25 3.2 3

164 T67/2 4D1 Ext. 20 2

165 T67/3 4DL Ext. 9 4

166 T67/4 4DL Ext. 6 3

167 T67/5 4DL Ext. 6 2

168 T67/6 4DL Ext. 6 2


169 T67/7 4DL Ext. 6 2

170 T67/8 4DL Ext. 9 2

171 T67/9 4DL Ext. 6 3

172 T67/10 4DL Ext. 6 3

173 AP-68 T68 4D25 Ext. STD 4

174 T68/1 4D1 Ext. 15 3

175 T68/2 4D1 Ext. 15 4

176 T68/3 4DL Ext. 4.5 3

177 AP-69 T69 4D25 Ext. STD 3

178 T69/1 4DL Ext. 6 4

179 AP-70 T70 4DT6 Ext. STD 1 4

180 T70/1 4DL Ext. STD 1 2

181 T70/2 4DL Ext. 6 4

182 T70/3 4DL Ext. 4.5 4

183 T70/4 4DL Ext. 1.5 4

184 AP-71 T71 4D45 Ext. 3 2 4

185 T71/1 4D1 Ext. 40 4

186 T71/2 4D1 Ext. 25 2 2

187 T71/3 4DL Ext. 9 2 2

188 AP-72 T72 4D45 Ext. 4.5 3

189 T72/1 4DL Ext. 9 2

190 AP-73 T73 4D25 Ext. 3 4

191 T73/1 4DL Ext. 4.5 2

192 AP-74 T74 4D45 Ext. STD 4

193 T74/1 4DL Ext. 4.5 4

194 T74/2 4DL Ext. 4.5 4

195 T74/3 4DL Ext. 4.5 3

196 T74/4 4DL Ext. 4.5 4

197 T74/5 4DL Ext. 6 4

198 T74/6 4DL Ext. 4.5 3


199 T74/7 4DL Ext. 9 4

200 AP-75 T75 4D25 Ext. 6 4

201 T75/1 4DL Ext. STD 3

202 T75/2 4DL Ext. STD 3

203 AP-76 T76 4D25 Ext. 4.5 3

204 T76/1 4D1 Ext. 25 4

205 AP-77 T77 4D45 Ext. 9 3

T77/1 4DL Ext. 9 3

206 T77/2 4DL Ext. 9 2 3

207 T77A 4DT6 Ext. 9 2 3

208 T77A/1 4D1 Ext. 15 4

209 AP-78 T77B 4D45 Ext. 9 2 3

210 T78 4DT6 Ext. 9 2 3

211 AP-79 T78/1 4D1 Ext. 30 3.2 3

212 AP-80 T79 4DT6 Ext. 9 2 4

213 Terminal Tower TT2 4DT6 Ext. 9 2 4

T142 4D25 Ext. 4.5 2 3

T143 4DT6 Ext. 9 2 4

Total
T46/1

T46/2

T46/3 4DL
T61/5 Piling 924,000.00 Sheikh Builders
Pile Cap 1,408,340.00 Zarin
Material 4,086,817.24

Equipment 55,750.00
Piling

Total Pile Nos. Income Subcon Bill Payment Status

20 7,454,780.26 4,503,508.00 Paid_7th


20 5,792,922.73 3,320,767.00 Paid_8th
16 5,292,853.58 3,623,662.00 Paid_6th
16 2,117,709.49 1,983,088.00 Paid_5th

16 2,117,709.49 1,892,240.00 Paid_1st

16 2,117,709.49 2,016,140.00 Paid_2nd


16 2,117,709.49 1,983,088.00 Paid_5th
20 2,759,417.56 3,132,069.00 Paid_4th

16 1,634,980.29 1,656,680.00 Paid_3rd

16 1,634,980.29 1,799,600.00 Paid_2nd


16 2,117,709.49 1,911,642.00 Paid_4th

16 2,117,709.49 1,892,240.00 Paid_1st

16 2,117,709.49 1,944,760.00 Paid_2nd


16 2,117,709.49 1,944,760.00 Paid_2nd

20 2,759,417.56 2,762,695.00 Paid_3rd


16 2,980,096.95 439,952.00 Paid_4th

16 2,980,096.95 492,710.40 Paid_1st

16 2,117,709.49 510,400.00 Paid_2nd


16 2,980,096.95 556,358.40 Paid_1st
16 2,980,096.95 507,546.00 Paid_1st

16 2,980,096.95 435,157.00 Paid_3rd


16 2,117,709.49 460,460.00 Paid_2nd

32 6,208,184.35 5,557,600.00 Paid_3rd

16 2,117,709.49 1,804,494.00 Paid_4th


16 1,634,980.29 1,799,600.00 Paid_3rd
16 2,117,709.49 411,264.00 Paid_2nd

32 6,208,184.35 950,956.00 Paid_5th

16 2,117,709.49 389,808.00 Paid_1st


16 2,117,709.49 382,286.48 Paid_2nd
16 2,980,096.95 542,239.00 Paid_3rd

32 6,208,184.35 999,472.00 Paid_7th

16 2,117,709.49 453,020.00 Paid_3rd


16 1,634,980.29 355,850.00 Paid_4th

20 4,582,800.71 622,429.33 Paid_9th


16 1,634,980.29 435,750.00 Paid_8th

16 2,980,096.95 542,239.00 Paid_1st

32 6,208,184.35 835,170.00 Paid_4th


16 2,980,096.95 485,764.00 Paid_6th

20 6,134,780.26 517,912.00 Paid_4th

20 4,912,800.88 12,317,650.00 Paid_13th (0.5) +15th (0.5)


20 4,458,884.80 11,410,150.00 Paid_10th (0.5) + 11th (0.5)
20 4,458,884.80 13,135,600.00 Paid_4th (0.5) + 5th (0.5)

20 4,458,884.80 11,029,375.00 Paid_8th (0.5)+ 9th (0.5)

32 6,208,184.35 1,001,038.00 Paid_10th

16 2,117,709.49 400,590.48 Paid_1st

16 2,117,709.49 424,200.00 Paid_9th

32 6,208,184.35 967,560.00 Paid_2nd

16 1,634,980.29 408,060.80 Paid_3rd


16 2,117,709.49 437,400.00 Paid_7th

32 7,476,869.10 1,120,830.00 Paid_2nd


16 2,117,709.49 442,156.00 Paid_1st

16 2,117,709.49 493,000.00 Paid_9th

20 4,582,800.71 646,230.00 Paid_1st


16 2,980,096.95 531,150.00 Paid_4th
20 7,454,780.26 531,150.00 Paid_5th

16 2,117,709.49 2,340,431.00 Paid_1st/Paid_3rd

16 1,634,980.29 414,666.67 Paid_2nd/12th


16 6,134,780.26 614,365.00 Paid_15th
20 2,117,709.49 442,900.00 Paid_14th

16 2,117,709.49 444,733.00 Paid_13th

16 2,117,709.49 457,600.00 Paid_1st


32 6,208,184.35 898,040.00 Paid_3rd

16 2,980,096.95 511,160.00 Paid_2nd


20 7,938,869.10 1,151,578.67 Paid_14th

16 2,117,709.49 385,337.00 Paid_1st

16 2,117,709.49 352,000.00 Paid_2nd


16 2,980,096.95 488,556.00 Paid_3rd

20 4,582,800.71 538,248.00 Paid_7th

16 2,117,709.49 388,666.67 Paid_6th


16 2,117,709.49 457,600.00 Paid_2nd
16 2,117,709.49 424,127.00 Paid_5th

20 4,582,800.71 614,754.00 Paid_5th

16 2,117,709.49 352,147.00 Paid_3rd


16 1,634,980.29 340,633.33 Paid_3rd
20 6,134,780.26 505,093.33 Paid_4th
32 6,208,184.35 980,964.00 Paid_5th

16 2,117,709.49 388,384.00 Paid_2nd

20 4,582,800.71 625,339.00 Paid_1st


16 2,117,709.49 466,400.00 Paid_1st
16 1,634,980.29 413,600.00 Paid_1st
20 6,134,780.26 534,853.33 Paid_5th

16 2,980,096.95 518,517.33 Paid_9th

16 2,980,096.95 644,800.00 Paid_


20 4,582,800.71 657,020.00 Paid_1st
20 2,173,012.41 645,381.00 Paid_4th

20 4,582,800.71 619,420.00 Paid_3rd

32 6,208,184.35 1,012,960.00 Paid_4th


16 2,117,709.49 382,400.00 Paid_7th
16 2,980,096.95 3,168,308.00 Paid_3rd

16 1,634,980.29 1,835,350.00 Paid_2nd

20 4,582,800.71 3,498,015.00 Paid_1st


16 2,117,709.49 1,873,380.00 Paid_2nd

32 6,208,184.35 5,530,600.00 Paid_2nd


20 6,873,909.31 4,518,608.00 Paid_1st

20 6,392,472.44 1,385,593.75 Paid_7th

20 7,938,869.10 1,146,041.34 Paid_9th (2)/Paid_1st

16 2,117,709.49 2,024,920.00 Paid_1st


16 2,123,831.78 537,480.00 Paid_2nd
20 8,372,472.44 1,043,966.17 Paid_8th (8)

16 2,123,831.78 381,300.00 Paid_8th

16 2,738,560.99 413,200.00 Paid_11th


16 2,123,831.78 417,013.00 Paid_12th
20 4,579,483.03 666,471.00 Paid_6th
16 2,123,831.78 372,866.67 Paid_13th

16 2,738,560.99 543,460.00 Paid_3rd

16 2,738,560.99 392,813.33 Paid_8th


16 2,738,560.99 423,699.47 Paid_5th
20 4,579,483.03 4,066,222.00 Paid_4th
16 2,738,560.99 2,104,332.00 Paid_5th

16 2,848,647.37 501,240.00 Paid_11th

16 2,738,560.99 2,143,636.00 Paid_6th


16 2,738,560.99 2,182,888.00 Paid_7th
16 2,738,560.99 529,604.00 Paid_2nd

16 2,738,560.99 549,320.00 Paid_2nd

20 8,372,472.44 1,311,520.63 Paid_4th


16 2,123,831.78 Paid_1st
16 2,123,831.78 547,460.00 Paid_4th

16 2,738,560.99 Paid_1st

16 2,738,560.99 399,637.33 Paid_2nd


16 2,738,560.99 549,312.00 Paid_3rd

20 8,372,472.44 1,178,438.75 Paid_5th


16 2,738,560.99 529,604.00 Paid_3rd

20 2,117,382.40 731,375.63 Paid_6th

20 2,117,382.40 613,526.67 Paid_4th


16 1,634,980.29 Paid_1st

20 6,223,793.05 1,020,426.67 Paid_5th

16 2,767,113.87 2,027,492.00 Paid_1st


16 2,767,113.87 2,065,080.00 Paid_1st
20 4,174,586.51 4,400,330.00 Paid_4th/Paid_3rd

20 5,292,853.58 3,747,932.00 Paid_1st/Paid_3rd

20 2,916,853.58 1,893,705.60 Paid_8th


20 6,478,896.52 6,015,674.00 Paid_10th
16 2,738,560.99 2,143,636.00 Paid_12th
16 2,738,560.99 2,022,916.00 Paid_17th

16 2,738,560.99 2,022,916.00 Paid_16th

16 2,738,560.99 2,065,080.00 Paid_11th


16 2,738,560.99 2,091,372.00 Paid_6th
16 2,738,560.99 2,090,868.00 Paid_5th
16 2,738,560.99 2,101,971.20 Paid_2nd

16 2,738,560.99 2,062,292.80 Paid_2nd

16 2,738,560.99 2,065,080.00 Paid_1st


20 7,476,869.10 6,999,320.00 Paid_1st
16 2,738,560.99 1,840,238.00 Paid_4th

16 2,738,560.99 1,911,642.00 Paid_8th

16 2,738,560.99 1,875,940.00
16 2,738,560.99 1,837,710.00 Paid_2nd
16 2,738,560.99 1,944,760.00 Paid_1st

16 2,738,560.99 1,947,386.00 Paid_4th

20 6,223,793.05 5,465,933.00 Paid_9th


16 2,123,831.78 1,802,268.00 Paid_9th

16 2,117,709.49 1,873,380.00 Paid_2nd


16 2,980,096.95 3,168,308.00 Paid_4th

20 6,208,184.35 5,562,644.00

16 2,738,560.99 1,911,642.00 Paid_9th


16 2,738,560.99 1,875,940.00 Paid_4th

16 1,634,980.29 1,730,444.00 Paid_6th

20 8,372,472.44 6,264,110.00 Paid_9th


16 2,738,560.99 1,944,760.00 Paid_3rd
16 2,767,113.87 441,770.67 Paid_3rd

16 2,738,560.99 1,947,386.00 Paid_5th

20 2,109,877.66 1,838,054.00 Paid_5th


20 4,579,483.03 3,695,055.00 Paid_4th
20 4,458,884.80 6,670,790.00 Paid_9th (16 piles)
20 2,117,382.40 2,987,312.80 Paid_8th

16 2,980,096.95 3,165,070.00 Paid_2nd

16 2,117,709.49 1,837,710.00 Paid_2nd


16 1,634,980.29 1,763,890.00 Paid_2nd
16 1,634,980.29 1,766,230.00 Paid_1st
16 1,634,980.29 1,801,974.00 Paid_12th

16 1,634,980.29 1,799,600.00 Paid_3rd

16 2,117,709.49 1,873,380.00 Paid_2nd


16 2,117,709.49 1,873,380.00 Paid_1st
20 6,208,184.35 5,563,610.00 Paid_4th

20 6,365,362.67 3,245,174.00 Paid_8th

20 6,873,909.31 4,518,608.00 Paid_7th


16 2,117,709.49 1,840,238.00 Paid_1st
20 4,582,800.71 3,685,689.00 Paid_5th

16 2,980,096.95 3,168,308.00 Paid_6th

20 6,392,472.44 6,175,295.00 Paid_10th


16 2,123,831.78 1,766,482.00 Paid_4th

16 2,980,096.95 3,168,308.00 Paid_5th


16 2,980,096.95 3,168,308.00 Paid_7th

16 2,980,096.95 3,168,308.00 Paid_4th

20 8,141,831.55 6,061,973.40 Paid_8th


20 6,873,909.31 4,862,059.60 Paid_8th

20 2,916,853.58 3,500,561.00 Paid_1st

16 2,185,384.66 2,056,621.00 Paid_3rd


20 6,134,780.26 4,483,116.00 Paid_24th
16 1,634,980.29 1,766,230.00 Paid_14th

20 6,208,184.35 5,563,610.00 Paid_8th

16 1,634,980.29 1,766,230.00 Paid_6th


20 7,476,869.10 6,361,060.00 Paid_17th
16 2,980,096.95 3,167,765.91 Paid_4th
16 2,980,096.95 3,167,765.91 Paid_3rd

16 2,117,709.49 1,945,945.40 Paid_2nd

16 2,980,096.95 3,167,746.00 Paid_1st


16 2,980,096.95 3,163,016.00 Paid_1st
16 2,117,709.49 2,054,689.00 Paid_5th
16 2,980,096.95 3,168,308.00 Paid_7th

20 6,208,184.35 5,563,610.00 Paid_2nd

16 2,117,709.49 2,018,832.00 Paid_3rd


16 2,117,709.49 1,947,386.00 Paid_4th
20 4,582,800.71 3,624,712.00 Paid_9th

20 6,873,909.31 4,764,126.00 Paid_13th

20 6,134,780.26 4,483,116.00 Paid_18th


16 2,117,709.49 2,304,099.00 Paid_29th
16 2,767,113.87 2,485,494.00 Paid_32nd

16 3,367,775.09 5,873,470.00 Paid_31st

16 6,873,909.31 4,998,766.00 Paid_25th


20 7,657,775.09 5,433,823.00 Paid_26th

20 3,367,775.09 5,873,470.00 Paid_30th


20 5,292,853.58 4,601,896.00 Paid_4th

20 6,161,831.55 8,356,412.00

20 6,161,831.55 7,155,672.00 Paid_6th


1,981,356.53 5,134,138.00

1,394,951.39 7,035,782.00 Paid_6th

771,217,058.02 483,520,758.90

16 676,000.00 Paid_1st

16 629,145.00 Paid_2nd

16 381,590.00 Paid_2nd
6,474,907.24 Re construction cost

Total Inst

Paint Piling Cost Pile Cap Cost Material Cost


483,520,758.90 265,798,948.80
1,436,000.00 483,520,758.90 265,798,948.80
749,319,707.70
Sub-con PIT Status Subcon

MRE-BBC Paid_6th DTC


MRE-BBC
MRE-BBC Paid_11th DTC
MRE-BBC Paid_2nd DTC

MRE-BBC Paid_1st DTC

MRE-BBC Paid_1st DTC


MRE-BBC Paid_2nd DTC
MRE-BBC Paid_2nd DTC

MRE-BBC Paid_1st DTC

MRE-BBC Paid_1st DTC


MRE-BBC Paid_2nd DTC

MRE-BBC Paid_1st DTC

MRE-BBC Paid_1st DTC


MRE-BBC Paid_1st DTC

MRE-BBC Paid_2nd DTC


Easy Paid_1st DTC

ABS Paid_1st DTC

Easy Paid_1st DTC


ABS Paid_1st DTC
ABS Paid_1st DTC

Easy Paid_1st DTC


ABS Paid_1st DTC

MRE-BBC Paid_2nd DTC

MRE-BBC Paid_2nd DTC


MRE-BBC Paid_1st DTC
JA Paid_1st DTC

Easy Paid_2nd DTC

JA
JA
JA

Easy

JA Paid_1st DTC
Easy Paid_1st DTC

Easy Paid_3rd DTC


Sajal Paid_2nd DTC

Business Link Paid_1st DTC

Sajal
Sajal

Sajal Paid_3rd & 4th DTC

MRE-BBC Paid_15th DTC


MRE-BBC Paid_12th DTC
GECL

GECL Paid_13th DTC

Sajal Paid_2nd DTC

New National Builders Paid_2nd DTC

Easy Paid_13th DTC

New National Builders Paid_3rd DTC

New National Builders


Easy

Machill Paid_5th
Machill Paid_3rd DTC

Sajal Paid_2nd DTC

Machill Paid_6th DTC


New National Builders Paid_6th DTC
New National Builders Paid_6th DTC

LR/FU (P+C) Paid_13th DTC

Easy
Sajal Paid_6th DTC
Sajal

Sajal

LR
LR Paid_3rd DTC

LR Paid_2nd DTC
Easy Paid_6th DTC

Starlink Paid (replaced with 40/1) DTC

Sajal Paid_2nd DTC


Sajal Paid_3rd DTC

Sajal Paid_6th DTC

Easy Paid_3rd DTC


Sajal Paid_5th
Sajal Paid_5th

Sajal Paid_4th DTC

Easy Paid_5th
Easy Paid_3rd DTC
Easy Paid_3rd DTC
Easy Paid_6th DTC

Sheikh Paid_6th DTC

Sheikh Paid_5th
Easy Paid_2nd DTC
Easy Paid_2nd DTC
Easy Paid_6th DTC

Easy

Easy
Sheikh Paid_5th
Sheikh Paid_6th DTC

Sheikh Paid_6th DTC

Allah'r Dan Paid_5th


Easy Paid_6th DTC
Al-Arafat Paid_2nd DTC

Al-Arafat Paid_1st DTC

Al-Arafat Paid_1st DTC


Al-Arafat Paid_1st DTC

Al-Arafat Paid_1st DTC


FU (P+C) Paid_12th DTC

Mahbub

Mahbub (2)/Habib (34) Paid_13th DTC

Mahbub Paid_2nd DTC


Mahbub Paid_2nd DTC
Mahbub (8)/Easy(24) Paid_10th DTC

Easy Paid_10th DTC

Sajal Paid_13th DTC


Sajal Paid_13th DTC
Shield
Easy

Mahbub Paid_15th DTC

Easy
Allahr Dan
Tany Paid_12th DTC
Tany Paid_13th DTC

Easy Paid_13th DTC

Tany Paid_14th DTC


Tany Paid_14th DTC
Mahbub

Mahbub Paid_10th DTC

Mahbub
Mahbub Paid_2nd DTC
Mahbub Paid_2nd DTC

Mahbub Paid_2nd DTC

Habib Paid_14th DTC


Mahbub Paid_2nd DTC

Mahbub
Mahbub Paid_2nd DTC

Mahbub

Machill
Mahbub Paid_2nd DTC

Machill Paid_10th DTC

Alomgir Paid_12th DTC


Alomgir Paid_12th DTC
Machill/Alomgir Paid_10th DTC

Mysha/Habib

Tany Paid_14th DTC


GECL Paid_14th DTC
GECL Paid_15th DTC
GECL Paid_15th DTC

GECL Paid_15th DTC

GECL Paid_14th DTC


Sheikh Ent. Paid_15th DTC
Sheikh Ent. Paid_15th DTC
TKD Paid_15th DTC

TKD Paid_15th DTC

TKD Paid_14th DTC


TKD Paid_14th DTC
RSE Paid_14th DTC

RSE Paid_14th DTC

RSE
RSE Paid_13th DTC
RSE Paid_13th DTC

RSE Paid_13th DTC

RSE Paid_11th DTC


RSE Paid_11th DTC

RSE Paid_13th DTC


RSE Paid_13th DTC

RSE Paid_14th DTC

RSE Paid_12th DTC


RSE Paid_13th DTC

RSE Paid_13th DTC

RSE Paid_11th DTC


RSE Paid_13th DTC
Mac Hill Paid_13th DTC

Ontel (Simplex) Paid_12th DTC

Ontel (Simplex) Paid_12th DTC


Ontel Paid_11th DTC
Ontel (Simplex)
Ontel (Simplex)

Ontel Paid_13th DTC

Ontel Paid_13th DTC


Ontel Paid_13th DTC
Ontel Paid_13th DTC
Naif Paid_13th DTC

Naif Paid_2nd DTC

Naif Paid_12th DTC


Naif Paid_11th DTC
Naif Paid_2nd DTC

RSE

Naif
Ontel Paid_2nd DTC
Naif Paid_2nd DTC

Naif Paid_2nd DTC

Naif Paid_11th DTC


RSE Paid_11th DTC

RSE Paid_10th DTC


RSE Paid_2nd DTC

RSE

RSE
RSE

Sheikh Ent Paid_10th DTC

Sheikh Ent Paid_14th DTC


Star Link Paid_11th DTC
Star Link

Star Link Paid_5th DTC

Star Link
Star Link Paid_10th DTC
Global Paid_10th DTC
Global Paid_10th DTC

Global

Global Paid_3rd DTC


Star Link Paid_3rd DTC
Star Link Paid_3rd DTC
Star Link

Star Link Paid_3rd DTC

Star Link Paid_3rd DTC


Star Link Paid_3rd DTC
Star Link

Star Link

Star Link Paid_10th DTC


Star Link Paid_13th DTC
Star Link Paid_13th DTC

Star Link Paid_13th DTC

Star Link Paid_11th DTC


Star Link Paid_11th DTC

Star Link Paid_13th DTC


FU (P+C) Paid_13th DTC

Star Link

FU (P+C) Paid_14th DTC


GECL

FU (P+C) Paid_14th DTC

LR

Sajal

Sajal

Total Installation Cost

Materials Adjustment Erection Cost Stringing Cost


74,130,887.50 19,592,684.77 5,000,000.00
69,809,140.44 106543840
Pile Cap

Income Subcon Bill Payment Status Sub-con Erection


Status

4,969,853.50 2,354,511.50 Paid_9th MRE-BBC


3,861,948.48 1,252,888.00 Paid_12th MRE-BBC
3,528,569.05 1,252,888.00 Paid_12th MRE-BBC
1,411,806.33 648,325.50 Paid_6th MRE-BBC

1,411,806.33 661,442.50 Paid_4th MRE-BBC

1,411,806.33 661,442.50 Paid_4th MRE-BBC


1,411,806.33 648,325.50 Paid_6th MRE-BBC
1,839,611.70 1,082,572.00 Paid_12th MRE-BBC

1,089,986.86 462,713.00 Paid_5th MRE-BBC

1,089,986.86 462,713.00 Paid_5th MRE-BBC


1,411,806.33 648,325.50 Paid_6th MRE-BBC

1,411,806.33 661,442.50 Paid_4th MRE-BBC

1,411,806.33 648,325.50 Paid_6th MRE-BBC


1,411,806.33 648,325.50 Paid_5th MRE-BBC

1,839,611.70 1,082,572.00 Paid_14th MRE-BBC


1,986,731.30 1,020,333.00 Paid_1st FU

1,986,731.30 1,020,333.00 Paid_1st FU

1,411,806.33 744,332.50 Paid_1st FU


1,986,731.30 1,020,333.00 Paid_3rd FU
1,986,731.30 1,020,333.00 Paid_3rd FU

1,986,731.30 1,020,333.00 Paid_2nd FU


1,411,806.33 744,332.50 Paid_1st FU

4,138,789.57 1,833,816.00 Paid_6th MRE-BBC

1,411,806.33 648,325.50 Paid_5th MRE-BBC


1,089,986.86 462,713.00 Paid_5th MRE-BBC
1,411,806.33 744,332.50 Paid_3rd FU

4,138,789.57 2,109,478.00 Paid_3rd FU

1,411,806.33 744,332.50 Paid_3rd FU


1,411,806.33 744,332.50 Paid_7th FU
1,986,731.30 1,020,333.00 Paid_8th FU

4,138,789.57 2,109,478.00 Paid_8th FU

1,411,806.33 744,332.50 Paid_1st FU


1,089,986.86 531,008.00 Paid_1st FU

3,055,200.48 1,221,162.80 Paid_6th GECL


1,089,986.86 531,008.00 Paid_2nd FU

1,986,731.30 1,020,333.00 Paid_2nd FU

4,138,789.57 2,107,646.00 Paid_6th FU


1,986,731.30 1,020,333.00 Paid_1st FU

4,089,853.50 1,956,016.50 Paid_3rd GECL

3,275,200.58 4,522,599.50 MRE-BBC


2,972,589.86 4,638,564.50 Paid_16th MRE-BBC
2,972,589.86 5,114,238.50 Paid_15th GECL

2,972,589.86 4,321,696.50 GECL

4,138,789.57 2,109,478.00 Paid_1st GECL

1,411,806.33 743,236.90 Paid_13th GECL

1,411,806.33 743,236.90 Paid_14th GECL

4,138,789.57 2,107,625.20 Paid_7th GECL

1,089,986.86 530,791.00 Paid_25th Zarin


1,411,806.33 744,228.50 Paid_24th Zarin

4,984,579.40 2,675,895.00 Paid_19th Zarin


1,411,806.33 744,332.50 Paid_2nd GECL

1,411,806.33 744,228.50 Paid_20th Zarin

3,055,200.48 1,222,715.00 Paid_16th Zarin


1,986,731.30 1,020,333.00 Paid_7th FU
4,969,853.50 2,661,429.50 Paid_6th FU

1,411,806.33 690,177.50 Paid_5th FU (P+C)

1,089,986.86 530,061.50 Paid_4th FU


4,089,853.50 1,954,634.50 Paid_4th FU
1,411,806.33 744,332.50 Paid_8th FU

1,411,806.33 744,228.50 Paid_21st Zarin

1,411,806.33 744,146.00 Paid_12th Zarin


4,138,789.57 2,109,478.00 Paid_7th Zarin

1,986,731.30 249,345.00 Paid_1st Zarin


5,292,579.40 2,624,468.00 Paid_17th Zarin

1,411,806.33 744,228.50 Paid_3rd Zarin

1,411,806.33 181,755.00 Paid_1st Zarin


1,986,731.30 249,345.00 Paid_1st Zarin

3,055,200.48 1,222,715.00 Paid_22nd Zarin

1,411,806.33 744,229.00 Paid_4th Zarin


1,411,806.33 744,228.50 Paid_6th Zarin
1,411,806.33 744,229.00 Paid_5th Zarin

3,055,200.48 1,222,715.00 Paid_10th Zarin

1,411,806.33 744,146.00 Paid_13th Zarin


1,089,986.86 531,040.00 Paid_2nd Easy
4,089,853.50 1,948,125.00 Paid_3rd Easy
4,138,789.57 2,109,348.00 Paid_11th Zarin

1,411,806.33 743,148.50 Paid_6th Easy

3,055,200.48 1,220,746.80 Paid_5th Easy


1,411,806.33 743,148.50 Paid_4th Easy
1,089,986.86 531,008.00 Paid_1st Easy
4,089,853.50 1,954,655.30 Paid_7th Easy

1,986,731.30 1,020,333.00 Paid_23rd Zarin

1,986,731.30 1,020,265.40 Paid_18th Zarin


3,055,200.48 1,222,715.00 Paid_8th Zarin
1,448,674.94 1,542,778.00 Paid_9th Zarin

3,055,200.48 1,222,715.00 Paid_15th Zarin

4,138,789.57 2,109,478.00 Paid_2nd Zarin


1,411,806.33 744,146.00 Paid_14th Zarin
1,986,731.30 888,510.00 Paid_4th Al-Arafat

1,089,986.86 462,713.00 Paid_3rd Al-Arafat

3,055,200.48 1,063,812.00 Paid_4th Al-Arafat


1,411,806.33 648,325.50 Paid_3rd Al-Arafat

4,138,789.57 1,831,975.00 Paid_5th Al-Arafat


4,582,606.21 1,857,484.50 Paid_2nd FU (P+C)

4,261,648.30 2,716,983.50 Paid_2nd Tany

5,292,579.40 2,624,388.00 Paid_7th Tany

1,411,806.33 744,332.50 Paid_1st Tany


1,415,887.85 580,669.00 Paid_1st Tany
5,581,648.30 2,914,873.80 Paid_4th Tany

1,415,887.85 579,619.20 Paid_2nd Innovatio

1,825,707.32 793,480.30 Paid_1st Innovatio


1,415,887.85 793,303.50 Paid_3rd Innovatio
3,052,988.69 1,320,381.00 Paid_3rd Tany
1,415,887.85 600,454.00 Zarin

1,825,707.32 793,303.50

1,825,707.32 793,303.50
1,825,707.32 792,178.00
3,052,988.69 1,320,381.00 Paid_7th Tany
1,825,707.32 792,181.50 Paid_8th Tany

1,899,098.25 1,068,880.00 Paid_4th Innovatio

1,825,707.32 792,178.00 Paid_8th Tany


1,825,707.32 792,178.00 Paid_8th Tany
1,825,707.32 794,201.50

1,825,707.32 794,253.50 Paid_7th Tany

5,581,648.30 2,915,399.00 Paid_6th Tany


1,415,887.85 575,629.00 Paid_4th Tany
1,415,887.85 794,133.90 Paid_3rd Tany

1,825,707.32 792,448.00 Paid_1st Envitek

1,825,707.32 793,090.80
1,825,707.32 792,448.00 Paid_1st Envitek

5,581,648.30 2,914,099.00 Paid_28th Zarin


1,825,707.32 794,253.50 Paid_7th Tany

1,411,588.26 1,225,031.50 Paid_2nd Tany

1,411,588.26 1,221,581.40 Paid_5th Tany


1,089,986.86 534,456.50 Paid_2nd Tany

4,149,195.36 2,205,806.00 Paid_5th Tany

1,844,742.58 794,253.50 Paid_2nd Alomgir


1,844,742.58 794,253.50 Paid_2nd Alomgir
2,783,057.67 1,412,656.30

3,528,569.05 1,641,941.20 Zarin

1,944,569.05 1,419,612.20 Zarin


4,319,264.35 2,206,628.00 Paid_19th GECL
1,825,707.32 792,750.50
1,825,707.32 792,750.50

1,825,707.32 792,750.50

1,825,707.32 793,114.50 Paid_18th GECL


1,825,707.32 789,721.50
1,825,707.32 789,721.50 Paid_7th Sheikh Ent.
1,825,707.32 793,194.30

1,825,707.32 793,194.30

1,825,707.32 793,194.30
4,984,579.40 2,674,306.70
1,825,707.32 794,253.50 Paid_28th Zarin

1,825,707.32 794,144.30 Paid_27th Zarin

1,825,707.32 704,153.50
1,825,707.32 794,149.50 Paid_26th Zarin
1,825,707.32 794,149.50 Paid_26th Zarin

1,825,707.32 794,097.50 Paid_26th Zarin

4,149,195.36 1,954,782.00
1,415,887.85 514,869.00

1,411,806.33 660,442.50
1,986,731.30 905,133.00

4,138,789.57 2,101,266.70 Zarin

1,825,707.32 704,153.50
1,825,707.32 704,153.50

1,089,986.86 471,368.00

5,581,648.30 2,578,519.00
1,825,707.32 704,153.50
1,844,742.58 843,060.50 Paid_27th Zarin
Ontel
1,825,707.32 690,177.50 Paid_6th
(Simplex)
Ontel
1,406,585.11 504,403.00 Paid_6th (Simplex)
3,052,988.69 1,144,904.00 Paid_8th Ontel
(Simplex)
2,972,589.86 4,601,623.50
1,411,588.26 1,057,168.10

1,986,731.30 887,323.80
Ontel
1,411,806.33 647,165.50 Paid_8th (Simplex)
1,089,986.86 461,643.00 Paid_8th Ontel
(Simplex)
1,089,986.86 461,643.00 Paid_8th Ontel
(Simplex)
1,089,986.86 470,421.00 Paid_15th Naif

1,089,986.86 459,673.00 Paid_11th Naif

1,411,806.33 659,450.50 Paid_16th Naif


1,411,806.33 652,844.00 Paid_14th Naif
4,138,789.57 1,860,562.50 Paid_13th Naif

4,243,575.12 1,079,128.00 RSE

4,582,606.21 1,894,551.50
1,411,806.33 647,375.50 Paid_3rd Ontel
3,055,200.48 1,063,812.00 Paid_8th Naif

1,986,731.30 887,677.00 Paid_9th Naif

4,261,648.30 2,407,342.50
1,415,887.85 514,869.00

1,986,731.30 903,993.00 RSE


1,986,731.30 903,993.00 RSE

1,986,731.30 903,993.00 RSE

5,427,887.70 2,622,043.00
4,582,606.21 2,422,799.50

1,944,569.05 1,255,803.00 Paid_2nd Sheikh Ent

1,456,923.11 558,347.00 Paid_4th Sheikh Ent


4,089,853.50 1,727,362.50 Paid_28th Star Link
1,089,986.86 471,059.20 Paid_20th Star Link

4,138,789.57 1,865,890.00 Paid_12th Star Link

1,089,986.86 470,761.00 Paid_22nd Star Link


4,984,579.40 2,366,217.50
1,986,731.30 903,951.00
1,986,731.30 903,951.00 Paid_7th Global

1,411,806.33 659,282.50 Paid_6th Global

1,986,731.30 903,951.00 Paid_5th Global


1,986,731.30 903,951.00 Paid_11th Star Link
1,411,806.33 659,408.50 Paid_10th Star Link
1,986,731.30 903,951.00 Paid_15th Star Link

4,138,789.57 1,867,181.60 Paid_21st Star Link

1,411,806.33 659,408.50 Paid_16th Star Link


1,411,806.33 660,232.50 Paid_27th Star Link
3,055,200.48 1,082,631.00 Paid_23rd Star Link

4,582,606.21 2,138,487.50 Paid_19th

4,089,853.50 1,729,574.50
1,411,806.33 659,231.10
1,844,742.58 746,284.50

2,245,183.39 2,575,835.00

4,582,606.21 1,889,384.50 Paid_33rd Star Link


5,105,183.39 1,816,454.50

2,245,183.39 2,574,315.00
3,528,569.05 1,538,549.00

4,107,887.70 2,819,246.50

4,107,887.70 2,817,622.50 Paid_7th FU (P+C)


1,320,904.36 1,417,605.00

929,967.60 2,817,622.50 Paid_8th FU (P+C)

514,144,705.35 265,798,948.80

Total
699,781,504.97
927,108,688.14
Erection

Income Subcon Bill Payment Status Completion Date Sub-con

1,912,701.16
1,775,390.05
1,959,624.35
1,579,990.04 222,950.00 Paid_5th Shahjalal

1,566,818.92 248,475.00 Paid_5th Shahjalal

1,566,818.92 215,314.91 Paid_6th Shahjalal


1,556,579.43 205,912.59 Paid_2nd Tany
1,711,106.47

1,556,579.43 205,920.00 Paid_1st Tany

1,556,579.43 205,920.00 Paid_1st Tany


1,556,579.43 205,912.59 Paid_2nd Tany

1,556,579.43 205,912.59 Paid_2nd Tany

1,538,819.65 193,570.00 Paid_1st Tany


1,538,819.65 193,552.78 Paid_2nd Tany

1,683,107.20
1,566,818.92 215,345.00 Paid_1st Tany

1,566,818.92 215,345.00 Paid_1st Tany

1,579,990.04 222,950.00 Paid_1st Tany


1,598,089.72 247,260.00 Paid_1st Tany
1,598,089.72 247,260.00 Paid_1st Tany

1,556,579.43 205,920.00 Paid_5th Shahjalal


1,579,990.04 222,950.00 Paid_5th Shahjalal

1,775,390.05

1,538,819.65 193,552.78 Paid_6th Shahjalal


1,538,819.65 193,552.78 Paid_1st Poweraid
1,538,819.65 193,552.78 Paid_7th Shahjalal

1,711,106.47

1,579,990.04 222,918.35 Paid_6th Shahjalal


1,579,990.04 222,918.35 Paid_6th Shahjalal
1,579,990.04 222,918.35 Paid_7th Shahjalal

1,747,008.40

1,538,819.65 193,570.00 Paid_4th Shahjalal


1,538,819.65 193,570.00 Paid_4th Shahjalal

1,747,008.40
1,598,089.72 247,260.00 Paid_4th Shahjalal

1,579,990.04 222,950.00 Paid_5th Shahjalal

1,747,008.40
1,598,089.72 247,260.00 Paid_4th Shahjalal

1,843,225.60 460,070.00 Paid_1st Shahjalal

1,775,390.05
1,959,624.35
2,092,227.84

1,722,884.00

1,711,106.47

1,579,990.04 222,917.50 Paid_9th Shahjalal

1,556,579.43 205,907.00 Paid_9th Shahjalal

1,711,106.47

1,566,818.92 215,312.50 Paid_9th Shahjalal


1,579,990.04 222,917.50 Paid_9th Shahjalal

1,766,790.58 394,355.00 Paid_8th Shahjalal


1,598,089.72 247,286.00 Paid_9th Shahjalal

1,598,089.72 247,286.00 Paid_9th Shahjalal

1,775,390.05
1,598,089.72
1,791,356.86

1,538,819.65

1,538,819.65 192,744.50 Paid_3rd Shahjalal


1,732,885.56 365,879.67 Paid_3rd Shahjalal
1,556,579.43 205,912.59 Paid_7th Shahjalal

1,566,818.92

1,538,819.65 193,570.00 Paid_2nd Tamim


1,683,107.20

1,538,819.65 193,570.00 Paid_1st Tamim


1,843,616.48

1,579,990.04 222,918.35 Paid_7th Shahjalal

1,579,990.04 222,950.00 Paid_5th Shahjalal


1,579,990.04 222,918.35 Paid_6th Shahjalal

1,775,390.05

1,598,089.72 247,260.00 Paid_4th Shahjalal


1,579,990.04 222,918.35 Paid_6th Shahjalal
1,598,089.72 247,903.50 Paid_3rd Shahjalal

1,683,107.20

1,556,579.43 205,920.00 Paid_4th Shahjalal


1,538,819.65 192,744.50 Paid_3rd Shahjalal
1,732,885.56 365,879.67 Paid_2nd Shahjalal
1,696,830.67

1,566,818.92 215,345.00 Paid_5th Shahjalal

1,711,106.47
1,566,818.92 215,345.00 Paid_5th Shahjalal
1,538,819.65 193,570.00 Paid_4th Shahjalal
1,732,885.56 365,879.67 Paid_8th Shahjalal

1,538,819.65

1,538,819.65
1,723,767.74
1,808,683.26 428,337.00 Paid_3rd Shahjalal

1,683,107.20

1,683,107.20
1,556,579.43 205,912.59 Paid_7th Shahjalal
1,556,579.43

1,556,579.43

1,696,830.67
1,538,819.65

1,775,390.05
1,761,335.19

1,912,701.16

1,791,356.86

1,579,990.04 222,950.00 Paid_1st Tany


1,538,819.65 193,570.00 Paid_1st Tany
1,741,383.06 378,566.24 Paid_3rd Tany

1,598,089.72 247,286.00 Paid_1st Innovatio

1,598,089.72 247,286.00 Paid_1st Innovatio


1,598,089.72 247,286.00 Paid_1st Innovatio
1,747,008.40
1,538,819.65

1,556,579.43

1,556,579.43
1,546,934.77
1,683,107.20
1,538,819.65 193,550.50 Paid_4th Tany

1,579,990.04

1,566,818.92
1,566,818.92
1,546,934.77

1,579,990.04

1,766,790.58 395,811.00 Paid_4th Tany


1,566,818.92
1,556,579.43

1,538,819.65 193,550.50 Paid_4th Tany

1,566,818.92
1,598,089.72 247,286.00 Paid_4th Tany

1,732,885.56
1,546,934.77

1,959,624.35

1,959,624.35
1,546,934.77 197,990.00 Paid_1st Tany

1,723,767.74

1,538,819.65
1,538,819.65
1,683,107.20

1,909,956.46

1,909,956.46
1,711,106.47
1,538,819.65
1,538,819.65

1,538,819.65

1,566,818.92
1,579,990.04
1,566,818.92
1,566,818.92

1,566,818.92

1,546,934.77
1,732,885.56
1,556,579.43

1,566,818.92

1,579,990.04
1,579,990.04
1,579,990.04

1,579,990.04

1,696,830.67
1,556,579.43

1,538,819.65
1,538,819.65

1,683,107.20

1,546,934.77
1,556,579.43

1,556,579.43

1,843,225.60
1,598,089.72
1,566,818.92

1,598,089.72

2,092,227.84
1,775,390.05
1,909,956.46
1,871,377.81

1,598,089.72

1,579,990.04
1,579,990.04
1,579,990.04
1,579,990.04

1,598,089.72

1,579,990.04
1,579,990.04
1,683,107.20

1,787,762.41

1,787,762.41
1,566,818.92
1,683,107.20

1,579,990.04

1,791,356.86
1,538,819.65

1,579,990.04 222,917.50 Paid_9th Shahjalal


1,566,818.92 215,312.50 Paid_9th Shahjalal

1,546,934.77 198,009.63 Paid_8th Shahjalal

1,766,790.58 460,070.00 Paid_9th Shahjalal


2,092,227.84

1,909,956.46

1,598,089.72
1,779,791.76 415,090.00 Paid_8th Shahjalal
1,598,089.72 247,286.00 Paid_9th Shahjalal

1,711,106.47

1,566,818.92
1,732,885.56
1,566,818.92
1,566,818.92

1,566,818.92

1,566,818.92
1,579,990.04
1,566,818.92
1,598,089.72 247,290.03 Paid_8th Shahjalal

1,747,008.40

1,538,819.65 193,552.78 Paid_7th Shahjalal


1,538,819.65
1,723,767.74

1,909,956.46

1,843,225.60
1,598,089.72
1,598,089.72

1,912,701.16

1,787,762.41
1,843,225.60

1,912,701.16
1,959,624.35

1,912,701.16

1,912,701.16
478,621.69

579,690.95

354,592,617.93 19,592,684.77

Dismantle+Erection 1,450,000.00
Stringing

Payment Status Stringing Completion Date Sub-con Sub-con Remarks


(Pulling)

You might also like