010 Appendix E1 - Form of Manpower List of BM-1 Project
010 Appendix E1 - Form of Manpower List of BM-1 Project
MANPOWER LIST
Contractor:
Note:
- The Contractor shall enter above the particulars of the managerial and supervisory staff whom he intends to utilize full time on this project
- During construction, if any additional direct workers are required to meet the construction schedule, the Contractor shall mobilize and execute te work without any
additional cost to RAPI.
- Mobilization of equipment and manpower shall be started after the Contractor receives Letter of Intent, and shall be completed within one month.