You are on page 1of 1

Blast Ref: 07022022 A 330 From Model: 07022022 A 330.

MO6
Quarry.6 Profile Shothole No: 15 Model Created: 07-02-2022
Page No. 1.15

Plan 3D View PROFILE DATA BURDEN MASTER Blasting Spec/Charging Sheet

Pt Depth Burden Depth Burden Target Actual


1
2 0.1 3.1- 0.4 3.4-
4 0.7 3.1- 0.8 3.4-
6 1.2 4.1- 1.2 4.0-
8 2.1 4.2 1.6 3.9-
10 2.6 4.4 2.0 4.1-
12 3.5 4.5 2.4 4.2-
14 4.1 4.9 2.8 4.4 2
15 16 4.8 5.2+ 3.2 4.5
18 5.7 5.1 3.6 4.5
20 6.3 5.3+
22 7.1 5.7+ 4.0 4.6
24 8.0 5.8+ 4.4 4.9
26 8.6 6.2+ 4.8 5.1
28 9.1 6.7+ 5.2 5.1 3
30 9.4 14.4+ 5.6 5.0
32 9.4 13.4+ 6.0 4.9
34 9.4 7.2+ 6.4 5.0
36 9.4 14.7+ 6.8 5.3+
38 9.4 7.9+ 7.2 5.5+
40 9.4 14.9+ 7.6 5.7+
42 9.4 9.5+ 8.0 5.7+ 4
44 9.4 8.7+ 8.4 6.1+
46 9.4 15.1+ 8.8 6.4+
48 9.4 15.6+ 9.2 7.0+

6m Grid 6

Profile Collar to Surveyed Floor: 10.2


Client: SR
Collar to Proposed Floor: 8.4
Location: Q3
7
Shothole Number: 15
East: 403425.8
North: 2814288.1
Height: 339.8
8
Azimuth: 245.0
Drill Angle: 10.0
Hole Depth: (Not) 9.4
2 Sub Drill: 1.0
4 Shothole Offset: 0.0 9
6
8 Lateral: 0.0
10 Vert Face Height: 10.6
12 Area to Proposed Floor: 46.4
14
16 Planned Burden: 4.7
18 Burden Tolerance: 10.0%
20 Proposed Bench: 331.5
22 Stemming: 4.00
24
26
28
BM Settings Surveyed 10.2
Proposed Floor 331.50 34 32 30
36
38 44 42 40
46 Search Width: 4.0
Seperation: H:0.4 V:0.4 Hole Dia.
48
Surveyed Floor 329.70
Burden to Report: 3.7 Delay
Notes Hole Diameter : 0.15 Min 4.1 @ 1.2 Min 3.9 @ 1.6 Remarks
Charge Depth
Base Charge
Column Charge
Plotted: 22/02/2022 at 8:29:

1.0m Grid 3D BM Data


Designer: Faiyaz Signature: Shot Firer
Manager

You might also like