Professional Documents
Culture Documents
Comments Compliance Note CR 31
Comments Compliance Note CR 31
Comment on sheet No. LUS-CP31-VEL-DWG-AR-00024 (General Drawing updated (Refer Revised Drawing No. LUS-CP31-VEL-DWG-AR-
2 Notes): DOOR SIZE TO BE CHANGED AS PER DOOR WINDOW 00024 REV-1)
SCHEDULE
Comment on sheet No. LUS-CP31-VEL-DWG-AR-00024 (Proposed Bore Drawing updated (Refer Revised Drawing No. LUS-CP31-VEL-DWG-AR-
3 hole location): TEXT TO BE CHANGED AS SCALPING POUNDER FILL 00024 REV-1)
DRESSING WITH 19mm CRUSHED STONE 150mm THICK
Comment on sheet No. LUS-CP31-VEL-DWG-AR-00027 (Column and Drawing updated as per Architectural required level (Refer Revised
4 Foundation Layout): IN SCHEDULE OF MATERIAL FINISHES ESTERNAL Drawing No. LUS-CP31-VEL-DWG-AR-00027 REV-1)
FINISHES DETAILS TO BE ADDED