Professional Documents
Culture Documents
09 - Nonlinear Behaviour T
09 - Nonlinear Behaviour T
Concrete Structures I
Class 9/26: Nonlinear behaviour of concrete structures
Eduardo S. Júlio
2019/2020 0/29
Concrete Structures I
2. between (concrete) cracking and (steel) yielding, Mcr < M < My
2019/2020 1/29
Concrete Structures I
Next, for vertical loads only, it is analysed how and when the nonlinear
behaviour of structural concrete can/should be taken into account in design,
namely in the definition of the distribution of internal forces.
2019/2020 2/29
Concrete Structures I
1m
2019/2020 3/29
Concrete Structures I
sobrecarga
2019/2020 4/29
Concrete Structures I
µ
To which correspond the following bending moment diagrams:
2019/2020 5/29
REDISTRIBUIÇÃO DE ESFORÇOS
Concrete Structures I
felástica
A
nestecano colocou a menor armadura no meio e assim
Ou sepa
houve uma diminuição doseu momento e coloca te um pouco de ar adm vão
This corresponds to a redistribution (from the support to the span) of 20%, que
which is acceptable (code requirements needing to be checked). Cera
a um ligeiroaumento dosmomentos nas
laterais de forma a equilibrar
Deve se assegurar que a seção em A permite a rotação
2019/2020 7/29
Concrete Structures I
Li Li+1 D
DMF
MEL
eoetgi.fi
ssefaro4a sS oa
O
MELR = δ MEL
Distribuição elástica
equilibrada nosprageafajire
auto
self-balanced !
ΔM = MEL - δ MEL = MEL(1 - δ) − autoequilibrado
2019/2020
verificar que8 é aceitável 8/29
Concrete Structures I
2019/2020 9/29
Concrete Structures I
2019/2020 10/29
Concrete Structures I
2019/2020 11/29
A REDISTRIBUIÇÃO DEPENDEDA PosiçãoDALN
Concrete Structures I
1.0
e
0ft
hybrid
fear
0.208 0.448 xu/d !
2019/2020 12/29
posição da
CN
Concrete Structures I
MEL
(-) (-)
(+)
ΔM
look = 10 MELR
(-) (-)
The interruption in the span where the live load is not considered needs
special attention. This loading situation usually implies that the
reinforcement cannot be interrupted at ¼ of the span needing to be
extended a little more.
2019/2020 15/29
Concrete Structures I
um üÊ 4
1.0
2019/2020 16/29
pior
te
FE.IE
ir
p
µ.PH
Mr
p
Concrete Structures I
2019/2020 17/29
Concrete Structures I
2019/2020 18/29
Concrete Structures I
2019/2020 19/29
Concrete Structures I
2019/2020 20/29
Concrete Structures I
em cedência
c
Rotação G fiz do
2019/2020 21/29
Concrete Structures I
2019/2020 22/29
Concrete Structures I
2019/2020 23/29
Concrete Structures I
2019/2020 24/29
Concrete Structures I
2019/2020 25/29
Concrete Structures I
pRd = ?
L L
DMF -
MRd
(-)
(+)
+
2 MRd
pRd L /8 !
2019/2020 26/29
koo z
Concrete Structures I
x x
Rai e não BY
2019/2020 27/29
Concrete Structures I
2019/2020 28/29
Concrete Structures I
2019/2020 29/29