Loading of Transformer - Site Checklist
Loading of Transformer - Site Checklist
Date of Loading
Names of
Loading Engineer
Additional people
Dismanted by (Please tick) SAEW at site
Others(Please
mention who
Loading of (Please tick) dismantled
Main Job the job)
Accessories
MAKE Serial No
Width of the
Height of Transformer
transformer
Documents being sent with
transformer(Please tick the
document name and add if any
additional docs are being sent) DC E-Way bill Gatepass
Any other
MOM At Site documents
Shared to (Name of
person in
Photos Taken/Not taken office/Factory)
QTY
SL.NO DESCRIPTION AVAILABLITY REMARKS
1 HV. BUSHING
a)porcelain parts
b)metal parts
c)clamp
d)shoes
2 LV Bushing
a) porcelain parts
b)metal parts
c)clamp
d)shoes
3 HV Neutral BUSHING
a)porcelain parts
b)metal parts
c)clamp
d)shoes
4 LV Neutral Bushing
a) porcelain parts
b)metal parts
c)clamp
d)shoes
5 Main Tank
Breather -Pipeline
Equalizing Pipeline
LV Turret
HV Turret
CT is present in LV Turret
CT is present in HV turret
Bucholz Relay
15 mm Valves
20 mm Valves
25 mm Valves
50 mm Valves
80 mm Valves
Butterfly valves
Cable gland
Cables
Support Insulator
Earth Flat
Ladder
6 Conservator
MOG
Conservator to main tank
connection pipe
Conservator tank with oil gauge
glass
Conservator valve
7 Radiators
Radiator valves(Butterfly gate)
Radiators stiffeners
8 Cooling fan
Cooling Fan Guards(Fan fixing
frame)
10 OSR
OSR Pipeline
11 OLTC
Breather OLTC
OLTC PRV
OLTC valve
12 DmBox
Dmbox handle
HV
LV
14 OIL pump
WTI
OTI
Contactors
Photo
16 RTCC Panel
Photo
17 Nitrogen cylinder