Professional Documents
Culture Documents
NO : MOZ-TCP-03-4
ATTACHMENTS **
RECEIVERS ITEM NO. OF * TOTAL P.O.I NOTES
NO. COPIES TYPE SHTS.
NO. ***
ITEM
DOCUMENT NO. REV. DATE OF STAGE DOC. TITLE REMARK
NO.
SHTS.
GROUNDING SYSTEM
1 TCP-EA-SHG-000-2-01-A A 95.03.30 1 R Schematic Diagram
GROUNDING SYSTEM
2 TCP-EA-ARD-000-2-01-B B 96.03.20 1 R Overal Layout
GROUNDING SYSTEM
3 TCP-EA-ARD-211-2-01-B B 95.10.18 1 R Arrangement Drawing
211-Mixture Crushing & Conveying
GROUNDING SYSTEM
4 TCP-EA-ARD-232-2-01-A A 95.03.30 1 R Arrangement Drawing
232-Gypsum Crushing
GROUNDING SYSTEM
5 TCP-EA-ARD-291-2-01-A A 95.03.30 1 R Arrangement Drawing
291-Raw Material Pre-blending
GROUNDING SYSTEM
6 TCP-EA-ARD-331-2-01-A A 95.03.30 1 R Arrangement Drawing
331-Raw Mill Feed System
GROUNDING SYSTEM
7 TCP-EA-ARD-361-2-01-B B 96.03.30 1 R Arrangement Drawing
361-Raw Mill,421-Debusting of RM/Kiln
GROUNDING SYSTEM
8 TCP-EA-ARD-361-2-02-B B 95.10.18 1 R Ground Grid System
361-Raw Mill,421-Debusting of RM/Kiln
GROUNDING SYSTEM
9 TCP-EA-ARD-391-2-01-A A 95.03.30 1 R Arrangement Drawing
391-Raw Meal Homogenizing&Kiln Feeding
GROUNDING SYSTEM
10 TCP-EA-ARD-451-2-01-B B 96.03.03 1 R Arrangement Drawing
451-Preheater,461-Rotary Kiln
GROUNDING SYSTEM
11 TCP-EA-ARD-451-2-02-C C 96.03.03 1 R Ground Grid System
451-Preheater,461-Rotary Kiln
GROUNDING SYSTEM
12 TCP-EA-ARD-471-2-01-B B 96.03.03 1 R Arrangement Drawing
471-Clinker Cooler,423-Cooler Dedusting
GROUNDING SYSTEM
13 TCP-EA-ARD-471-2-02-C C 95.10.18 1 R Ground Grid System
471-Clinker Cooler,423-Cooler Dedusting
GROUNDING SYSTEM
14 TCP-EA-ARD-491-2-01-A A 95.03.30 1 R Arrangement Drawing
491-Clinker Transport and Storage
GROUNDING SYSTEM
15 TCP-EA-ARD-531-2-01-A A 95.03.30 1 R Arrangement Drawing
531-Cement Mill Feed System
GROUNDING SYSTEM
16 TCP-EA-ARD-561-2-01-B B 95.04.24 1 R Arrangement Drawing
561,562-Cement Grinding
GROUNDING SYSTEM
17 TCP-EA-ARD-561-2-02-C C 95.10.18 1 R Ground Grid System
561,562-Cement Grinding
GROUNDING SYSTEM
18 TCP-EA-ARD-591-2-01-B B 95.04.24 1 R Arrangement Drawing
591,592-Cement Storage&Bulk Loading
GROUNDING SYSTEM
19 TCP-EA-ARD-641-2-01-C C 95.10.18 1 R Arrangement Drawing
641,642-Cement Packing&Truck Loading
GROUNDING SYSTEM
20 TCP-EA-ARD-L12-2-01-C C 96.03.20 1 R Arrangement Drawing
L12-HFO Tank
GROUNDING SYSTEM
21 TCP-EA-ARD-801-2-01-0 0 96.03.06 1 I Arrangement Drawing
801-Central Control Building
GROUNDING SYSTEM
22 TCP-EA-ARD-811-2-01-0 0 96.03.20 1 I Arrangement Drawing
811 - Main Power Station
Page 1 of 2
TRANS. NO : MOZ-TCP-03-4
ATTACHMENTS **
RECEIVERS ITEM NO. OF * TOTAL P.O.I NOTES
NO. COPIES TYPE SHTS.
GROUNDING SYSTEM
23 TCP-EA-AED-000-2-01-0 0 93.11.15 1 I INSTALLATION DETAILS
GROUNDING ROD
GROUNDING SYSTEM
24 TCP-EA-AED-000-2-02-0 0 93.11.15 1 I INSTALLATION DETAILS
POTENTIAL EQUALIZATION BUS (PEB)
GROUNDING SYSTEM
25 TCP-EA-AED-000-2-03-0 0 93.11.15 1 I INSTALLATION DETAILS
TRENCH
GROUNDING SYSTEM
26 TCP-EA-AED-000-2-04-0 0 93.11.15 1 I INSTALLATION DETAILS
BRANCH WIRE CONNECTION
GROUNDING SYSTEM
27 TCP-EA-AED-000-2-05-0 0 93.11.15 1 I INSTALLATION DETAILS
CABLE LADDER/TRAY
GROUNDING SYSTEM
28 TCP-EA-AED-000-2-06-0 0 93.11.15 1 I INSTALLATION DETAILS
VERTICAL DRUM,TOWER,TANK
GROUNDING SYSTEM
29 TCP-EA-AED-000-2-07-0 0 93.11.15 1 I INSTALLATION DETAILS
DUCTS
GROUNDING SYSTEM
30 TCP-EA-AED-000-2-08-0 0 93.11.15 1 I INSTALLATION DETAILS
GATE, FENCE
GROUNDING SYSTEM
31 TCP-EA-AED-000-2-09-0 0 93.11.15 1 I INSTALLATION DETAILS
PIPE RACK
GROUNDING SYSTEM
32 TCP-EA-AED-000-2-10-0 0 93.11.15 1 I INSTALLATION DETAILS
EARTHING LUG
GROUNDING SYSTEM
33 TCP-EA-AED-000-2-11-0 0 93.11.15 1 I INSTALLATION DETAILS
STUB-UP CONDUIT PIPE
GROUNDING SYSTEM
34 TCP-EA-AED-000-2-12-0 0 93.11.15 1 I INSTALLATION DETAILS
CONDUIT SUPPORT
LIGHTNING PROTECTION
35 TCP-EA-AED-000-2-13-A A 95.03.30 1 R INSTALLATION DETAILS
LIGHTNING ARRESTER
LIGHTNING PROTECTION
36 TCP-EA-ARD-000-2-02-C C 96.03.20 1 R Lightning Arrester
Overal Layout
Page 2 of 2