PART 7 CONSTRUCTION MANAGEMENT, PRACTICES AND SAFETY

SECTION 1 CONSTRUCTION MANAGEMENT

Construction Project Life Cycle Construction Project Management Functions


Sequence of Project Components
Planning Tools
Resource Planning Quality Control and Assurance Health and Safety Assurance Communication
Time Cost Trade Off
Drawing Compliance Sub-Contractor Coordination Variation Orders

Construction Management

Cost Management

Pre-construction Construction and building Owner occupancy


Health and
Safety Management

Human Resource
Quality Management
Management

Design Procurement Commissioning Commissioning Scope Management


(including getting bids) Project Closeout Integration and
Communication Procurement
Management Management Sustainability Management

Organizational Structure Risk Management


Owner/Client or his Representative

Time Management
Project Manager

Document Control Change Order Programming

Consultants Construction Agencies


Payment Application Progress Review Meetings Specification Compliance

Electrical
Quantity Services Other Civil Other
Design /Mechanical
Survey consultants Works Services
Works

Construction Timeline in Weeks Stages of a Construction Project

End of warranty period

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Handover
Prepare Initial Selections (Style of House, Size, Exterior Material and Roofing)
Excavate Site Installation
Prepare Detailed Selections (Kitchen, Tiles, Floors, Appliances, etc.) completed
Install Footings/Foundations/Silent Flooring System
Cure Foundation Materials
on-site Warranty
Carpentry Rough Frame
Plumbing, Electrical, HVAC, Roofing Design approved
Insulate Commissio
ning
Hang Drywall Contract signed/
Install Ornamental Iron project transferred
Tile Floor Installation
Instal Hardwood Floors Binding quotation
Installation of Cabinets approved Production
Instal Stairs
Landscape Project start
Set Millwork approved Design
Paint Walls/Ceilings
Finish Hardwood Floors
Contract M
Lay Carpet anagemen
t
Final Clean
Final Inspection Quotation
Final Close

SECTION 2 CONSTRUCTION PLANNING & SITE MANAGEMENT SECTION 3 CONSTRUCTION PRACTICES

Construction Control and Practices Temporary Works


Pollution and Transport Sharing of NMV with footpaths
Busy Localities truction Ph
recons ase Corrosive Atmospheric
P Conditions
ource Planni
Local Condition Res ng
Hilly Regions Formwork
Efficiency by location analysation Pedestrian friendly access
tion

Tower Cranes
Ide

Adverse Weather
Alloca

ntific

Constructability Falsework
Conditions CONSTRUCTION
ation

Aspects
PHASE
Implementation Disaster Prone Scaffolding
g
lin

Es
ti
du

m
Sch
e ati
on Road intersection designing

Road cross section planning


Organizational Site Construction Strategy
Structure Management and Sequence Road work zone Standardization

Urban Roads/ City Roads Planning and Construction

Manoeuvrability of vehicles

Manual handling
Storage, Stacking and Handling Practices
Warning signs
and red lights

Dry conditions
Protections against
atmospheric agencies
Protections against fire

Segregations of material Planning and storage layout


Mechanical handling Stacking of different materials

KANCHAN SINGH, SAMRIDHI, YASHI GARG