You are on page 1of 21

MANUFACTURING DATA REPORT

(MDR)

PROJECT : ROAD TANKER 32 T

PROJECT NO. : 17.09.116

ITEM : ROAD TANKER 32 T NO. 15

QUANTITY : 1 Unit
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

MANUFACTURING DATA REPORT

CUSTOMER : PT. HANDAL GUNA SARANA


END USER : PT. TIRTA INVESTAMA
CONTRACTOR : PT. FICO INDO REKAYASA
PROJECT : ROAD TANKER 32 T
PROJECT NO. : 17.09.116
ITEM : ROAD TANKER 31 T No. 15
TYPE : ROAD TANKER 32 T
QUANTITY : 1 UNIT
SIZE/ CAPACITY : 32.000 L
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

No Table of Content Manufacturing Data Report


1 Preliminary Drawing
2 Approval Drawing
3 As Built Drawing
4 Quality Plan
5 Inspection Test and Plan (I.T.P)
6 Welding Procedure Specification (W.P.S)
7 Welder Certificate
8 Welding Map
9 Material Traceability
10 Borescope Inspection
11 Liquid Penetrant Testing
12 Roughness Testing
13 Liquid Level Calibration
14 Passivation
15 Passivity Testing
16 Installation Qualification
17 Conformity
18 Final Inspection
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

1. Preliminary Drawing
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

2. Approval Drawing
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

3. As-Built Drawing
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

4. Quality Plan
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

5. Inspection and Test Plan (ITP)


MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

6. Welding Procedure Specification (WPS)


MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

7. Welder Certificate
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

8. Welding Map
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

9. Material Traceability
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

10. Borescope Inspection


MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

11. Liquid Penetrant Testing


MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

12. Roughness Testing


MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

13. Liquid Level Calibration


MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

14. Passivation
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

15. Passivity Testing


MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

16. Installation Qualification


MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

17. Conformity
MANUFACTURING DATA REPORT (MDR)
Document No. : 17.09.116-03
Date of Issued : 24 December 2017
Rev. No . : 00
Date of Rev. :-

18. Final Inspection

You might also like