You are on page 1of 1

Xerox

Installation Instructions USSG Innovators

Product(s): 4110F Date April 2008 Page: 1


Title: 4110 CZ Folder Leaf Spring kit Kit part # 655N00303

Instructions #: N/A Tag/MOD #: N/A Classification code: R

Purpose 1. Disconnect
This kit provides 4 folder leaf springs to increase solenoid P/J
pinch roll tension to minimize folder jams.

Kit Contents
Item Description Qty
1 Leaf springs 4

Procedure:
__ 1. Switch off the power and disconnect the
power cord. 2. Remove pivot screw

__ 2. Remove chute assembly (PL 17.149 item 16).


Figure 1 Remove chute assembly
a. Unplug nip solenoid. Figure 1.
b. Remove pivot screw. Figure 1.
c. Take out chute, use caution not to
damage mylar guide.
__ 3. Install the four leaf springs, one on top of
each of the pinch rolls to increase tension.
(One leaf spring per pinch roll).
a. Remove pinch roll mounting screws.
b. Mount leaf spring on top of pinch roll
using existing screw. Place the right
angle of the leaf spring over the top of the
chute and centered on the pinch roll
Mount the leaf springs with right angle over
spring. Install all 4 leaf springs. Figures 2
top of chute and leaf is flush with pinch roll
and 3.
__ 4. Reinstall the chute assembly.
Figure 2 Install Leaf springs
__ 5. Reconnect the power cord, turn on machine
and check for proper operation.

Figure 3 Leaf springs installed

You might also like