You are on page 1of 3

Disaster Response Plan

Assessment By : Rashadur Rahman ( Manager ECRM) Date : 26, April -2019

Hazard type: Natural


Emergency What could be Duty & Responsible
How to response
Situation happen Responsibilities person

-Go to the higher ground and avoid


-Flood covers land areas subjected to flooding
-Compliance
-Destroy houses and -Do not attempt to work across flowing
-Make the place secure Manager
buildings and carry soil streams or drive through flooded
-Electrical safety -Maintenance
Flood away from valuable land roadways
-Medical safety Manager
-Flood can also -Turn off electrical collection and take
-Chemical safety -Store Manager
contaminate drinking away goods to be affected
-Medical Officer
water and cause diseases -Collect and keep dry foods, water
purifying tablets,

-Check for injuries


-Check water, gas and
-Shaking hazard; can -For indoor: sit down, cover and hold electricity weir -First aid in
cause injury & death Stay inside until shaking stops and it is -Stay out of damaged charge/officer
-Collapse of structures safe to go outside buildings Maintenance
and the construction: Can -Stay outdoors until the shaking stops -Be careful around Officer
Earthquake cause injury and death -Stay away from building, street lamp broken glass and debris
-Fire hazards: can cause post, utility wires -Be careful of -Firefighting
physical damage through -If trapped under debris, stay calm and chimneys (they may team FSCD
burning and inhalation take preventive measures fall down) Officer
-Stay away from
damaged areas

Head Office:- House # 97, Road # 11/A, Dhanmondi R/A, Dhaka-1209, Bangladesh Page -1 of 3
Phone: 8191809, 58157345. Fax- 880-2-8112868, E-mail: pakiza@bdcom.com
Factory: Panchdona, Narsingdi, Bangladesh.
Hazard type: Man-made
-Evacuate the area
immediately after
-Observe visually the source are of
spillage occurs
spillage
-Inform concern -Supervisor of
-Evacuate the area through emergency
persons the area
exit
-Could cause health, seek assistance ECR, -First aid team
-Put physical barrier for further release
Chemical physical and Maintenance -ECR
-Review MSDS (Name, approximate
environmental hazard department -Chemical
Spillage -Could serious injured-/
quantity, hazards, flammability,
-Utilize all available Responsible
toxicity, corrosiveness) to control of
(accidents) death to human life
released chemicals
tools and equipment's -Production
-Could caught fire to control spillage department
-Arrange proper PPE/ equipment and
-Take immediate action -Maintenance
spill control tool kit
-Dispose following department
-Collect and store spilled chemical
guidelines, through
-Dispose as per proper guidelines
ETP or waste storage
area
-Releasing heat: Can
cause physical damage -Person who see
-Activate fire alarm
through burning -Activate fire alarm the fire
-Evacuate floors
-Generating smoke: Can -Evacuate floors -Duty Officer
Fire damage human life -Inform Fire Service and Civil Defense
-Inform Fire Service
-Section
Hazard and Civil Defense
through inhalation -Head count Supervisor
-Head count
-Depletion of oxygen: -Control fire -Firefighting
-Control fire
Can damage human life team FSCD team
through lack of oxygen

Page -2 of 3
Head Office:- House # 97, Road # 11/A, Dhanmondi R/A, Dhaka-1209, Bangladesh
Phone: 8191809, 58157345. Fax- 880-2-8112868, E-mail: pakiza@bdcom.com
Factory: Panchdona, Narsingdi, Bangladesh.
On duty
Maintenance
-Stop the gas release sources
Officer
Gas -Evaluate the risk -Stop release source
-Human Effects -On duty
-Evacuate release area -Evacuate area
Release -Fire hazards Compliance
-Do not use any flammable item/ -Check for injuries
Officer
material
-First aid
member
-Suicide attacks -Should be aware or own surrounding
-Rocket and mortar and watch for additional attacks
attacks -Listen by PA system for directions -Communication -Admin Manager
Terrorist -Vehicle based attacks and travel information and instructions through PA system First aid
Attack -Aircraft attacks and from officials -Check for injuries members
hijacking -If the attack occurs near anyone,
-Conventional fire arms check for injuries and provide first aid
-Identify the demand
-Cause identification
Worker -Strike -Identify the external involvedness -HR Manager
and negotiation
-Layoff -Call PC meeting -Secretary PC
Unrest -Arrange PC meeting
-Violent disputes -If require call law enforcement -Admin Manager
-External negotiation
agencies
-Liaison with local
political & law
-Understand / observe overall situation
Political -Hartal agencies -HR Manager
Make employee aware on the situation
-Arrange management -Secretary PC
Unrest Identify the threads of running day to
-Barricade meeting -Admin Manager
day work
-Dispatch information
to the employee

Head Office:- House # 97, Road # 11/A, Dhanmondi R/A, Dhaka-1209, Bangladesh Page -3 of 3
Phone: 8191809, 58157345. Fax- 880-2-8112868, E-mail: pakiza@bdcom.com
Factory: Panchdona, Narsingdi, Bangladesh.

You might also like