SMC MANUFACTURING (VIETNAM) 3RD FACTORY – PHASE 2 PROJECT

SAFETY & HEALTH HAZARD LOG

TITLE: JOB SAFETY ANALYSIS DOC NO./ REVISION REV

Lot B2 and Lot B4, Road D2, Long Duc IP, An Phuoc Mr. Vu Manh Hieu (SHE)
PROCESS/ LOCATION: Commune, Long Thanh District, Dong Nai Province, PREPARED BY:
Vietnam. Signature: Date:

Mr. Tran Bao An (SM) Mr. Nguyen Hung Chien


REVIEW BY: APPROVED BY (PM)
Signature: Date: Signature: Date:

JOB SAFETY ANALYSIS FOR EXCAVATION, LEAN CONCRETE, FORMWORK, REBAR & CASTING WORK
3E
No Work Activity Hazards Preventive measures
Person In charge
P.P.E to be worn at all times.
Site to be kept tidy/free from obstructions where possible Supervisor
Not to wear Personal Protection Equipment (PPE)
General Site PPE are replaced if lost, workout or damaged
1
Activities. The safety supervisor proceed to a PPE check during the tool box meeting
Identify and provide as many certified fire extinguisher as needed in offices, Supervisor
Fire
changing rooms, store, cranes, bentonite plant, hot works areas.
Surveyor have to pay attention to the working area Supervisor
2 Setting out Slip, Hit by truck
Speed limit under 5km/h, Traffic controller
-Falling in trench from height not exceeding 2m -The operator to control the rotating rate to not be fast
-Hit the worker / Foreman / Supervisor during -Install warning sign board and barrier, provide good access
excavating, rotating -Always ensure the protection is in place and cooling water is acting
-Break of circular saw blades -Erect a barrier around the area
-Burn by the engine -Pay high attention and never any maintenance if still hot
-Slip / Fall during walk along the trench or enter to the - Install warning tape, warning sign board and barrier
trench - Do not store any surcharge or material near the trench
Foundation Supervisor
3 -Falling in trench from height not exceeding 2m - Install sufficient water pump and monitor the trench stability
excavation
-Trench collapses - Install warning tape, warning sign board and barrier
-Trench flooding - Worker have to pay attention when walking on trench
-Stepping / Falling on the driven piles rebar - Signal man directly instruct the crane operator
-Strike by hanging formwork - Using rigger wire to control the hanging formwork
-Hit during removal/demolition of obstacles found in - Stay far from backhoe and wear all PPE
the trench - Install bariers around the area, no access allowed
-Environment of working area is not tidy - Collect the soil and put in the located area, keep it tidy
4 Formwork -Hit the worker / Foreman / Supervisor during -Install warning tape, warning sign board and barrier Supervisor
installation moving, rotating - Signal man directly instruct the crane operator

Page 1/3
-Slip / Fall during walk alone the trench or enter to - Install warning tape, warning sign board and barrier.
the trench Using temporary platform crossing the trench
- Strike by hanging formwork - Signal man directly instruct the crane operator
- Working in confine space - Using rigger wire to control the hanging formwork
- Dazzled the eyes by welding light and fall - Worker have to pay attention when working in confine space
- Electric shocking by step on leaking electric cable - Not look into the welding light
- Stepping on the welding rod - Cleaning the work area and keep it tidy

Rebar - Wear the suitable gloves Supervisor


5 -Cutting themselves by rebar, wire
installation
-Hit the worker / Foreman / Supervisor during moving -Safety officer / Signal man directly instruct the driver
- Falling in trench - Install warning tape, warning sign board and barrier Supervisor
6 Concreting
- Getting caustic due to alkali in concrete - Wear the suitable gloves
- Concrete splashes to eyes - Wear the suitable goggles
-Barricade the swinging area
-Displaying warning signs
-Check the access road
-Swinging of the backhoe during casting of concrete
Backhoe -Provision of signalman to monitor backhoe movements and concrete truck Supervisor
7 - Traffic accident in congested working area
Operation movement
- Hit the worker / Foreman / Supervisor
-The operator to control the rotating rate to not be fast
- Signal man directly instruct the operator
- Install warning tape, warning sign board and barrier
-Slip / Fall during walk alone the trench or enter to -Install warning tape, warning sign board and barrier.
Formwork Supervisor
8 the trench -Using temporary platform crossing the trench
removal
- Strike by hanging formwork
-The operator to control the rotating rate to not be fast
- Signal man directly instruct the operator
-Hit the worker / Foreman / Supervisor
- Install warning tape, warning sign board and barrier Supervisor
9 Backfilling -Slip / Fall during walk alone the trench or enter to
- Install warning tape, warning sign board and barrier. Using temporary platform
the trench
crossing the trench
-
-Bad lighting of the working area and accesses -Provide as many spotlights as needed to guaranty a good visibility of any working
Working at Supervisor
10 areas and accesses
night
-No electric lines on ground
-Hand tools to be inspected and certified/stamped, tested monthly
-Prior to moving any material by hand review platform where movement is intended
-Any activity with electrical materials involved
to take place to ensure stable ground
Working in Wet - Tripping, falling on the platform due to loose stones Supervisor
11 - Make available water proof ponchos and rubber safety boots for the personnel
Weather washed by rain on the platform
- Make easy the evacuation of waste water from the working platform to the
perimetral drain
- Provision of electric pumps to remove any stagnant water
12 Unload Overload Ensure the load of truck with materials height. Supervisor

Page 2/3
Arrange signal man/ watchmen
Barricade must be provide .
materials on Vehicle impact
Briefing for workers how to arrange/ stack safely.
site collision
Check with Suppliers & transportation company.
Pedestrians
Inform limit speed for all vehicle.

Use of hand Provide all necessary PPE (gloves, safety


tools (Suction shoes, safety helmets, ) for labor and must be worn at all working times. Supervisor
13 Personal injury.
cap, hammer, .) Provided hand tools in safe condition.
Damaged/defective tools to be taken out of use immediately.
M/C inspection by competence persons.
Check all electric connection point.
Only operated by nominated competent personnel
All cables to be fitted with enclosed sockets.
Use of Power
Tools (Drills, Fall of drill, cutter (blades) Supervisor
15 Barrication.
Cutters).. Personal injuries, electrocution, shock, burns, fire
All equipment must be guarded and used in compliance with manufacturer’s
instructions.
Use plug/ socket according with requirement (IP65).
Operatives must visually inspect all cables and sockets for damage at all times.
Cables must not be routed across traffic routes.
Given verbal instructions to maintain and/or clean/tidy up individual workplaces
Trip & fall hazards
during and after competition work times.
Respiratory hazards.
Housekeeping Tools/equipment to be clean/ stored in designated area. Supervisor
16 Hygiene inadequacy.
Wet/damp sweeping techniques to be used for general cleaning of competition area
Stagnant fluid.
to control dust.
Waste management.

Page 3/3