KALIMANTAN

WEST KALIMANTAN

KALSELTENG TIMRA
POWER GENERATION PLANNING IN KALIMANTAN
PLT EBT Base 3.6% PLTU 19.6%

Other NRE 16,4%

PLTGU 18.3%
PLTU
PLTGU
PLTA/PLTM PLTA/PLTM 42.1%
Other NRE
PLT EBT Base

Additional generating capacity in 2021-2030 is 2.8 GW or an average additional capacity


of 280 MW per year, and PLT Hydro will dominate the type of power plant to be built

Coal PLTU : 550 MW or 19.6 %


PLTGU : 513 MW or 18,3%
PLT Hydro : 1.18 GW or 42,1%
PLT EBT Base : 100 MW 3.6%
other NRE : 459 MW or 16.4 % (PLTS: 303,7 MW) (PLTB: 70 MW) (PLTBm: 85.7 MW)
National strategic project in the equatorial system
National strategic project in Kalselteng Timra
(Kalimantan)

o Project FTP-2 power plant project: PLTG/MG Bangkanai 140 MW


o FTP-1 power project: PLTU Trench Baru 2x50 MW and PLTU Kura-Kura o PLTU Kalselteng 2 (2x100 MW) and PLTU MT Kalselteng -3 (2x100 MW) )
designed with co-firing 30%
2 x 27.5 MW which function to supply electricity needs for the base
o PLTG/MG/GU/MGU Kalsel 200 MW, Central Kalimantan 100 MW, PLTG
load of the West Kalimantan system Kaltim Peaker -2 (100 MW), PLTGU Kaltim add on Blok 2 (80 MW),
PLTGU Kaltim -1 100 MW
o Follower generator: PLTG/GU Kalbar/Pontianak which will supply
o PLTA Tabang 90 MW, PLTA Kelai 55 MW, Sesayap 90 MW, by utilizing the
electricity directly to the load center in Pontianak potential of the Kayan River,
o PLTA East Kalimantan has a spread of 800 MW for the development of
o PLTU Kalbar-1
the new state capital (IKN) based on EBT

in North Kalimantan, there is potential for hydropower up to 9 GW, development of hydropower will be made on a
demand basis. If the PLTA in North Kalimantan is developed by the private sector, then the risk of demand
uncertainty can result in losses for PLN as an off-taker. then the buy-sell option with a take-and-pay scheme is the
right option so that the burden and risk of demand uncertainty is not borne by PLN.
WEST KALIMANTAN

SOUTH KALIMANTAN
150 kV Khatulistiwa interconnection system

Isolated systems Average demand growth 7,9 %


150 kV interconnection system

In anticipation of a short-term power shortage, a 3x100 MW


Average demand growth 8,4
Pontianak mobile power plant (MPP) has been built and it can be Isolated systems
%
relocated if the power from the generator on the equator system is
sufficient. PLTU Parit Buaya FTP-2 2x50 MW contributes to
MIDDLE KALIMANTAN

EAST KALIMANTAN

150 kV Khatulistiwa interconnection system

Isolated systems Average demand growth 10,2 %

Electrical Energy Power Exchange with Sarawak (Malaysia)


o PLN purchases electricity from Sarawak through a 275 kV interconnection transmission
with a contract power of 110 MW until 2021, this contract can be extended with a 150 kV Khatulistiwa interconnection system
power exchange scheme if the two systems are over-supplied at different times so that
they can fill each other's supply shortages.
o the certainty and timeliness of operation of PLTG/GU 3x100 MW Pontianak Peaker on Isolated systems 20 kV Average demand growth 7,1 %
the equator system is very crucial
o For an isolated 20 kV system which is currently still supplied from PLTD BBM, the power
in this system is still experiencing limitations due to the almost no addition of new
generator capacity, while the load there continues to grow rapidly.
THE ZONING PLAN AND STAGES OF THE NEW STATE CAPITAL
IN NORTH PENAJAM PASER, EAST KALIMANTAN

o Palace o Cultural Park


o Offices of State institutions (Executive, o Botanical garden
2021-2024 Legislative, Judiciary)

o Housing ASN/TNI/POLRI o University, cience and techno o MICE/ Convention center


o Diplomatic compound park o Sport center, museum
2025-2029 o Educational and health o High tech and clean industries o Shopping mall
facilities o R&D Center o Military bas

2030-2045 o National park o Metropolitan


o Orangutan conservation o Development area related to the surrounding
o Cluster residential non-ASN provincial area

The plan to move the national capital has been announced by the president in 2019. The government targets the master plan for the construction
of a new capital city to be completed by the end of 2020. The estimated need for IKN is 800 MW, currently the electricity load is 15.89 MVA, the
current electricity demand is supplied from the Petung 90 MVA substation. the needs of this IKN will be supplied from the Kalseltengtimra system.
NORTH KALIMANTAN The electric power system in the border area

2 districts in North Kalimantan which are directly


adjacent to Sabah, Malaysia: Nunukan Regency and
Malinau Regency, most of the population in these two
areas still do not enjoy PLN electricity, some others still
use private generators and communal PV mini-grid from
the local government.

One of the factors due to the unavailability of road


access that allows for the construction of an electricity
Isolated systems 20 kV distribution network.

Average demand growth 8 %