NOTES

B3
GENERAL NOTES
This drawing is protected under the
copyright Act and cannot be reproduced
in part or in whole whole without
200 authors consent.
20mm solar

Terrazzo finished
bronze Tinted All dimensions are to be checked on
glass site, written dimensions rules over

1
scaled dimensions. Any discrepancy in
treads and risers.
150mm loading slab ribbed
to approval. Reinforcement +3600
mezzanine
floor
the dimensions is to be reported to the
layout to S.E's details. Architect before work commences.

T=300mm R=
mezanin
e floor + 3600 Mashrabiya

23R x 157 450mm deep r.c beam to Stair opening to All dimensions are in MM unless

UP
specified.
150mm
S.E.'s details schedule

22G x 311 All construction Work is to comply with

B4 B4
60mm thk 1000mm the latest K.B.S standard codes of
hardwood profiled practice, local authority by-laws and fire
60mm thk handrail with 30x6 metal
1000mm regulations.
section flat core-rail
hardwood profiled
handrail with this darwing is to be read in conjuction
30x12 thick
30x6 metal with specifications and all other relevant
carborendum non-slip
section flat core- drawings.
strips to approval.
rail
8 P.V denotes permanent ventilation and
Mashrabiya Stair opening
must be provided above all windows
to schedule 30x12 thick
carborendum non-slip and doors where indicated or shown.
strips to approval.
ground
9 +- 0
floor
Water meter to be 300mm above
ground ground level.
-
floor 0 + 150mm loading slab ribbed 150mm loading slab ribbed
10 to approval. Reinforcement to approval. Reinforcement All walls under 200mm thick to
layout to S.E's details. layout to S.E's details. reinforced with hoop iron after every
alternating course.

Damper proof course to be provided

Section B3-B3 1:50 Section B4-B4 1:50


SERVICE
11 under all external walls at grade. D.P.C
5,050

to be a minimum of 150mm obove


ground level.

LIFT
12 Depth of foundation is to be determined
on site to S.E approval.

All vegetable soil to be removed from


13 under slab and all paved surfaces.
200mm thick masonry wall with
12mm thick plaster finished as All soils under slab and around external
per schedule.. foundation to be treated for termite

Polished terrazzo control.


14
150x20mm Quarry tile skirting Provide 1 row of 600*600*50mm

15 floor finish on stair from an approved supplier jointed


and pointed in cement mortar on
precast conc. paving slabs around the
building unless otherwise shown.

landing
prepared backing to approval.
1000 Gauge damp-proof All reinforcement work to Structural
membrane laid to approval. Engineers details.
16 8m m thick non slip ceramic floor tiles on
Drain pipes passing under tarmac,
32mm thick 1:2 (cement:sand)
driveways and buildings to be encased
1,800 screed laid to approval.
in 150mm thick concrete surround.
300x300mm non-slip heavy duty
30x12 thick concrete tiles patterned to All sanitary works to the satisfaction of
DOWN

approval. the mechanical engineer.

carborendum non-slip 100mm thick r.c pedestrian walk


'Umbrella' fire
All roads, storm water drainage and foul
sewerage to civil engineers drawings.

600
sloped to drain.
strips to approval. extinguishing sprinkler
system. Pipe sizes to All electrical works to the entire
M.E's detail. satisfaction of the Electrical engineer.
17

18

19

20

21

22

23

'Pyroc' sprayed ceiling


REVISIONS
200

finish on the underside


to approval.
300mm deep hardcore well DATE DESCRIPTION
compacted to approval.
B3

50x50mm two coat

60mm thk 1000mm Mastic asphalt angle


fillet.

high timber finish


hand rail

Main Stair Plan 1:20 300mm thick reinforced


ribbed structural floor slab.
Reinforcement details to
RETAINED EARTH S.E's details.
- 3600
BASEMENT 1 FLOORLEVEL

6 200 6
'Umbrella' fire
extinguishing sprinkler
system. Pipe sizes to
M.E's detail.
CLIENT NAME
150mm thick masonry protective
Finish as per schedule Finish as per schedule MOWASCO
walling finished w ith 12mm thick
plaster and 3-coats water-proofing
R.C beam to.ES
's detail r.c beam to.ES
's detail paint to approval.
50 12

50 25 12

31

12mm thick plaster on protective


25x33mm z section steel PROJECT DESCRIPTION
75x50mm camphor wood casement sash framing masonry walling finished with 3 coats
10

casement sash framing of water-proof paint to approval.


12 230 50 120 12
25

MIXED USE
25

6mm peripheral fogged


6mm peripheral fogged clear glass in glass putty
clear glass in glass putty
as per schedule
.
as per schedule
. DEVELOPMENT AT CBD
5 6
MOMBASA
6 105 12 25 52
1500mm high 150x150 12mm Thick plaster finished with 3-
6 200 6
18mm thick stainless steel coats of water proof paint to
212 angle protection approval STUDENT NAME
section painted to approval 3-coats 20mm thick mastic
12mm thk finish as
per schedule asphalt tanking applied to rough 400x600mm R.C column with a KENNETH KIPKOSGEY
concrete face to approval. 1500mm high iron angle
25x33mm z section steel
casement sash framing pr otection. KIPKEU
Outer jamb finish to detail
30mm thick cement/sand grout.
6

Ex125x25mm thick camphor 250x80mm bevelled precast 150mm thick r.c loading slab
window board painted concrete Sill to
' SE s. detail ribbed to approval. Reinforcement PROJECT STAGE
to approval
. 200mm thick r .c w alling
to S.E's details. layout to S.E's details.
WORKING DRAWINGS
115

Masonry walling
20mm quadrant timber bead
20

400

Cement
/ sand jointing
. - 6600
BASEMENT 2 FLOORLEVEL
20

Wall finish as per schedule


. 50x50mm mastic angle 50mm thick protective
50

fillet . screed. SCALE:


40

7 10 AS SHOWN
10 6 105 95 12 15 10x10mm drip mould
.
6mm clear glass in glass
60

400mm thk Masonry walling


; putty as per schedule
. REG NO:
See plan
.
BARC/074J/2017
18 18 3-coats of 30mm thick
6

15 5 12 150 324 150 75mm thick coarse horizontal Mastic asphalt


DATE:
clinker blinding. applied over concrete base to
Window Sill.line
600
approval.

DRAWING NUMBER :

Window Detail 1:5 Column Detail 1:10 Basement Section 1:25