You are on page 1of 1

B3

200

1
Terrazzo finished treads and risers. T=300mm R=150mm
23R x 157

UP
22G x 311 mezzanine
Mashrabiya Stair opening to schedule +3600
floor

B4 B4
Mashrabiya Stair
8
opening to schedule

LIFT/STAIR LOBBY
9
20mm solar bronze

ff non slip ceramic tiles


Tinted glass
10

11 60mm thk 1000mm

SERVICE hardwood profiled


handrail with 30x6 metal
5,049

section flat core-rail

LIFT
12

13
30x12 thick carborendum non-
slip strips to approval.
14

15

16

30x12 thick carborendum non-slip strips to approval.

DOWN
-0 ground
+
floor

Polished terrazzo floor finish on stair landing


17

18

19

20

21

22

23
150mm loading slab ribbed to approval.
Reinforcement layout to S.E's details.
200

B3

Main staircase section (B3-B3) scale 1:50


60mm thk 1000mm high timber finish hand rail

Main staircase Part plan scale 1:50

150mm loading slab ribbed to approval. 212


Reinforcement layout to S.E's details.
6 200 6
mezanine
floor3600+

Finish as per schedule Finish as per schedule


450mm deep r.c beam to S.E.'s details
R.C beam to S .E's detail r.c beam to S .E's detail

5025 12

31
25x33mm z section steel

10
75x50mm camphor wood casement sash framing
casement sash framing

25
12 230 50 120 12
6mm peripheral fogged
6mm peripheral fogged clear glass in glass putty
clear glass in glass putty as per schedule .
as per schedule .

6 105 12 25 52 5 6
6 200 6
60mm thk 1000mm 212
hardwood profiled
handrail with 30x6 metal
section flat core-rail

12mm thk finish as


per schedule

25x33mm z section steel


Outer jamb finish to detail casement sash framing

Mashrabiya Stair opening to schedule 30x12 thick carborendum non-

6
slip strips to approval. mm thick camphor
250x80mm bevelled precast
window board painted
concrete Sill to SE 's detail .
.

115
Masonry walling

20
mm quadrant timber bead Cement / sand jointing .

20
Wall finish as per schedule .

50
40
7 10
ground - 10 6 105 95 12 15 10x10mm drip mould .
0+

60
floor mm thk Masonry walling ;
6mm clear glass in glass
putty as per schedule .
150mm loading slab ribbed to approval.
Reinforcement layout to S.E's details.

6
15 5 12
Window Sill line.

Main staircase section (B4-B4) scale 1:50 Window jamb detail scale 1:5

REVISIONS

GENERAL CONSTRUCTION STRUCTURAL MECHANICAL Project Title : Proposed Mixed Urban Development in Mombasa CBD Drawing Title : Details
All dimensiones are in mm unless otherwise All slabs at ground level to be poured over over 1000gauge All black cotton soils to be removed from below all buildings All plumbing and drainage to comply with relevant local authority, spesifications. S.V.P denotes soil vent pipe to be provided Client : MOWASCO
spesified.Drawing are not to be scaled,only figured polythene sheeting on 50mm thick stone dust on hardcore. and paved surfaces. Building to be clear of blackcotton soil to at any head of the drainage system. Drains pass beneath buildings and pathways to be encased with 150mm concrete Drawing Number : Barc/022j/Mud 1
dimensioned to be used.The contractor must check and All soils under slabs and all around external foundations to be distance of more than 500mm outside the edge of the sorround. The storm drain pipes to comply with B.S 556 specification. All underground foul and waste drain pipes shall be Drawing by : RONKO TITUS SALONIK (BARC/022J/2016)
verify all dimensions before the commencements of any treated for termites control. surface.For all R.C works refer to structural engineers details. UPVC to comply with B.S 55. All inspection chamber and covers and framing shall be cast iron.Minimum slope in the drain
Depth of foundations to be determined on site to S.E's approval. pipes to be 1 in 100. No chases will be allowed for pipes. Sleeves will be allowed with written approval of structual Checked by:
work.
CIVIL All walls to be reinforced with loop iron at every alternate enginee.No cutting of concrete without express approval of the Architect or Structural Engineer. All testing of pipes must be Date :
All soils on cut out embarkments to be stabilised and the course. All adjustments R.C work and masonry wall to be tied complete before plastering.All mechanical work must be co-ordinated with electrical and any conflict must be claimed
slope not to exceed the natural angle repose. with loop iron at every alternate course. before works began P.V denotes permanent ventilation no date descriptions
GSPublisherVersion 0.1.100.100

You might also like