Evaluat ion of t he shear st rengt h of four pile cap using st rut and t ie model (ST M)
Dr.At t aullah Shah
Strut-and-Tie
Model for Deep
Beam Design
A practical exercise using Appendix A of the 2002 ACI Building Code
Σ( Fy) = 428 k – F12 ( sin α1) = 0 implies F12 = 637 k ( 2830 kN) w s ( 1-2) = w 14( c o s α1) + lb1( sin α1) = ( 12 in.) ( 0.741) +
( 16 in.) ( 0.672)
Σ( Fx ) = F14 – F12 ( c o s α1) = 0 implies F14 = 472 k ( 2100 kN) = 8.89 in. + 10.8 in. = 19.7 in. ( 500 mm)
Figure 3 gives the geo metry o f No de 1. Bec ause No w c hec k the strut c apac ity
different effec tive c o mpressive strengths will b e used in
No de 1 and Strut 1-2, and b ec ause the strut’s stress φ Fns( 1-2) = φƒcuw s( 1-2) b w = ( 0.75) ( 2.55 ksi) ( 19.7 in.) ( 20 in.)
must b e c hec ked o n a plane perpendic ular to its axis, = 754 k ( 3360 kN) > 637 k ( 2830 kN) ( o .k.)
the geo metry o f the no d e is a little c o mp lic ated .
Figure 3 sho ws the pro c edure to c alc ulate the width o f Based o n the analysis o f No de 1, assume that the
Strut 1-2. height o f No de 2, whic h is a c o mpressio n-c o mpressio n-
The effec tive c o mpressive strength fo r a no de is c o mpressio n ( CCC) no de and thus, βn = 1.0, will be equal
defined as to 10 in. ( 250 mm) . Then, fo r a sec o nd trial, assume that
dv = 60 in. – (12 in. + 10 in.)/2 = 49 in. (1240 mm). Reevaluating
ƒcu = ( 0.85) βn ƒ′c the truss with this value leads to
No de 1 is a c o mpressio n-c o mpressio n-tensio n ( CCT) α1 = 44.6 degrees; F12 = 609 k ( 2710 kN) ;
no de, so βn = 0.8. Thus, the effec tive c o mpressive and F14 = 434 k ( 1930 kN) .
strength fo r No de 1 at no minal c o nditio ns is
Bec ause the fo rc es in Strut 1-2 and Tie 1-4 are lo wer
ƒcu( 1) = ( 0.85) βn ƒ′c = ( 0.85) ( 0.80) ( 4.0 ksi) = than in the first trial, there is no need to make further
2.72 ksi ( 18.7 MPa) c hec ks at No de 1.
Use this no minal strength and φ = 0.75 to c hec k stress Step 2: Check maximum shear force
at the base o f the no de permitted in a deep beam
Co de Sec tio n 11.8.3 defines an upper limit fo r the shear
fo rc e permitted in a deep beam. With the c entro id o f
Tie 1-4 established, the effec tive flexural depth o f the
beam d is h – ( w 14/ 2) = 54 in. (1370 mm). Thus, the c hec k
ƒ( base) = 1.34 ksi ( 9.2 MPa) < φ( 2.72 ksi) = o f Co de Sec tio n 11.8.3 requires
2.04 ksi ( 14.1 MPa) ( o .k.)
Vu ≤ φVn ( max) = φ( 10) √ƒ′c b w d =
Also , find the width o f Tie 1-4, whic h defines the ( 0.75) ( 10) √4000 psi ( 20 in.) ( 54 in.)
height o f No de 1
Vu = 428 k ( 1900 kN) ≤ φVn ( max) = 512 k ( 2280 kN) ( o .k.)
No w, use the geo metry o f No de 1 sho wn in Fig. 3 to Chec k stress o n vertic al fac e o f left part o f No de 2
Fig . 4 : Ge o me try, fo rce s , and dime ns io ns fo r the le ft part o f No de 2 (1 in. = 2 5.4 mm,
1 k = 4 .45 kN)
Step 6: Evaluate right side of Node 2 Fig . 7: Be am s e ctio n s ho wing the ho rizo ntal s te e l to s atis fy the
s kin re info rce me nt re quire me nt (1 in. = 25.4 mm)
Fo r c o nsistenc y, the ac ting c o mpressive stress o n the
interio r vertic al fac e o f No de 2 must
be the same fo r bo th the left side
and right side o f the no de ( Fig. 8) . In
Step 3, the ac ting c o mpressive stress
o n the vertic al fac e was c alc ulated to
be 2.17 ksi ( 15.0 MPa) . To c larify
vec to r equilibrium fo r this part o f
No de 2, the ho rizo ntal fo rc e ac ting
o n the interio r vertic al fac e is sho wn
Fig . 8 : Ge o me try, fo rce s , and dime ns io ns fo r the rig ht part o f No de 2 . Fo r co ns is te ncy,
as two c o mpo nents. Strut 2-3 will the co mpre s s ive s tre s s o n the ve rtical face s o f No de 2 mus t be e qual (1 in. = 2 5.4 mm,
behave like the c o mpressio n zo ne in 1 k = 4 .45 kN)
w 24 = 5 in. ( c o s α2) + 6.7 in. ( sin α2) = 3.58 in. + 4.66 in. =
8.24 in. ( 210 mm)
Thus,
The fo rc e transfer at the level o f the lo ngitud inal To pro vide the req uired area o f reinfo rc ement at
steel is 217 kips ( 965 kN) , so the minimum height o f No de 5, assume eight b ars fro m the b o tto m two layers
the No d e w14 is o f No . 8 b ars will b e fully anc ho red at No de 5 ( c enter
b ar in lo west layer will no t b e ho o ked) . Thus
φFns(3-5) = φƒcu(3-5) w 35 b w = (0.75)(2.55 ksi)(17.6 in.)(20 in.) = MI, 2002, 443 pp.
7. Reinec k, K.-H., ed., Example s fo r the De sign o f Structural
673 k ( 3000 kN) > 304 k ( 1350 kN) ( o .k.)
Co ncre te with Strut-and-Tie Mo de ls, SP-208, Americ an Co nc rete
Institute, Farmingto n Hills, MI, 2002, 242 pp.
Step 12: Check straight anchorage of No. 8
8. Fanella, D., and Rabbat, B., “No tes o n ACI 318-02 Building Co de
bars from Node 4 to Node 5
Requirements fo r Struc tural Co nc rete,” Po rtland Cement Asso c ia-
Assume the top layer of bars and the middle bar in the
tio n, 2002, Sko kie, IL.
bottom row are developed as straight bars from Node 4 to
9. Aguilar, G.; Matamo ro s, A.; Parra-Mo ntesino s, G.; Ramirez, J.;
Node 5 (Fig. 2). The available anchorage to the center of
and Wight, J. K., “Experimental Evaluatio n o f Design Pro c edures fo r
support at Node 5 is at least 50.2 in. (1280 mm). The required
Shear Strength o f Deep Reinfo rc ed Co nc rete Beams,” ACI Structural
development length from Section 12.2.2 of the Code is
Jo urnal, V. 99, No . 4, July-Aug. 2002, pp. 539-548.
Rec eived and reviewed under Institute pub lic atio n po lic ies.