Partner Quantity Transhipment Point Damage Type

Alpha Digital 1 DD Front door scratch

Gurukrupa 1 RAJ Back side base damage


Improvement Proposal
Images
Root cause identified Corrective actions Schedule

1. Fix issue before


Box condition OK, materials dispatch or change
dispatched from WH after PDI
material.
and patner done the PDI on
2.When loading the
unloading time found screech on
door. shipment then check
properly.

1. Fix issue before


dispatch or change
Box condition OK, partner done
material.
the PDI at unloading time found
2.When loading the
base damage. Handling issue.
shipment then check
properly.
Implementation & Communication
Counter Measure Action Items When Inform Consult

Material check at every


checkpoint is discussed Reassesment / Training /
Dispatch Team
and training given to Supervision for loader
whole team.

Material check at every


checkpoint is discussed Reassesment / Training /
Dispatch Team
and training given to Supervision for loader
whole team.
Status

Ongoing

Ongoing