JOB HAZARD ANALYSIS FORM

Preventive Maintenance of Manual Roll Up Doors September 7, 2022


Galvashutters and Trading Corp. PNB Building Ayala Helper(s)/Laborer(s)
September 7, 2022 – December 7, 2022 Edward E. Rabutin Generbert Taytayon, Aubrey Badajos, Elmer
Lasay, Ariel Duarte
Special/Primary Hazards: Break Hazards
Personal Protective Equipment Required: Safety Gloves, Safety Glasses, Safety Shoes, Vest, Safety Harness
Item Detail of Activity Equipment and Tools Risk Involvement Preventive Measures Responsible Severity
Used Person(s)
1 Correct Door Alignment and  Ladder/Scaffolding  Fall  Proper Use of Scaffolding Leadman 3
level  Levelling Tools  Safety Harness
2 Replacement of Damage  Welding Machine  Eye and  Wearing of gloves and safety 3
Slats and End Locks  Cutting Tools Skin Burn goggles and long sleeves
 Extension Cord  Cuts  Use grinder guard 3
 Other small tools  Tripping  Physically and mentally fit
from workers 3
extension  Use fire blanket and provide
cord fire extinguisher
 Fire 3
3 Cleaning of Roll Up Slats  Pressure washer  Wet and  Physically and mentally fit 2
and scaffolding slippery workers
floor  Provide enough lighting
 Physical 2
Injury
4 Painting works  Spray Paint  Fire  Keep paint away from welding 2
 Inhalation and cutting works
of Paint  Wear Proper Face Mask 2
 Paint spills  Spray paint carefully if spills 2
on floor are unavoidable use
newspapers to cover affected
area

Prepared by:
______________________________
Edward E. Rabutin
General Manager