SCOPE OF WORK: DEPARTMENT: Prepared by: Checked by:

PAINTING CONSTRUCTION Maria Jessa Mae Diaz Maria China Andallo


Safety Officer Project In Charge

NATIONAL BUILDERS AND SERVICES


OFFICE: UNIT A. LOT 13 4M'S APARTMENT, MARTILYO ST., BRGY. SAN
ROQUE, MARIKINA CITY
E-MAIL: lrljr@yahoo.com. nbsconstruction_2015@yahoo.com
TEL: 639-3327 CEL NO.: 09164715808/09204600032

JOB HAZARD ANALYSIS


TASK DESCRIPTION POTENTIAL HAZARD CONTROL MEASURE

1. . Set up equipment and  Collisions between  Wear reflective safety vests and
supplies. workers and wall. boots.

 Mark area with wet paint signs,


men and equipment working signs.

2. Paint Application  Back or shoulder injury  Use correct manual handling


when lifting paint tins. techniques.
 Possible injury if lever  Read material safety data sheets &
slips while opening paint manufactures recommendations
tins. prior to opening cans.
 Inhale fumes.
 Correct training in use of P.P.E
 Skin damage or
equipment to be provided.
contamination.
 Eye damage from  Ensure work area is clear.
splashing paint.
 Use P.P.E equipment such as
 Trips over materials when protective clothing such as overalls
brushing or rolling on paint or long sleeves.

3. Using a mobile scaffold or  Falling from heights while  Ensure Mobile Scaffolds or ladders
ladders to complete the task setting up or using mobile is properly erected.
access equipment.
 Correct training in the use of
portable ladders & working from
heights.
4. Housekeeping/Waste  Skin irritation and dust  proper handling, storage and
Disposal exposure housekeeping

 Dispose all unwanted/excess


materials at designated disposal
area.