Rehabilitation Program for Existing Bakaru I Hydro Electric Power Plant
Scenario A: Proposed Short Term Rehabilitation Measures Incl. Options
Purpose Total Civil Work & Equipment Reservoir Cleaning Maintain and restore volume of Amphibious Excavator reservoir because of sedimentation Maintain and restore volume of Excavation and Dredging reservoir because of Sedimentation Services sedimentation Reforestation and installation Prevent sedimentation rate and of “turap bambu” 2 Kilometers restore nature condition from reservoir Access Road Current condition of the access road has many damaged area, Restoration of Access Road by restoring the access road From Pao to Bakaru HEPP will make mobilization for bakaru 2 construction become easier Total Electrical Equipment Emergency Generator Cable Installation of Power For back-up system of EG House Emergency Generator Retrofit automatic system of EG Replacement Control System of (current condition EG doesn’t Automatic Start-Up Emergency start automatically when Generator station service transformer losing voltage or current) Flow Prediction to Reservoir River and Open Channel Non- for accurate inflow prediction Contact Area-Velocity Flowmeter Replacement of all battery For accurate inflow prediction systems and communications for telemetry Communication Amplify GSM signal in Bakaru GSM Signal Booster area for communication DC & UPS for Communication For back-up power supply in System (Power House, Dam emergency condition that still Control Centre and Residence) need communication KWH Meter Procurement of retrofit for Bakaru 1 still use analog KWh Generators KWh Meter (AMR),, meter, suggest changing to Station Services KWh Meter digital and automatic meter reading, and add 2 installation in High voltage side of main (AMR), and installation for transformer (150 kV) to Transformers KWh Meter (2 measure produced KWh from sets, 1 for each unit) transformer HV and monitor transformer’s losses in real time
Scenario B: Proposed Long Term Rehabilitation Measures Incl. Options
Total Electrical Equipment Elevator The existing elevator condition Procurement and installation of sometimes get stucked and the new elevator door can’t close Generator Equipment Slipring condition is worn-out Slipring because of lifetime operation General maintenance, Carbon brushes are worn-out procurement of spare parts because lifetimr operation (carbon brush, etc.) Sometimes there are sedimentation deposit in radiator’s piping and make the temperature at generator winding increasing. We need to flush and purge the piping by Procurement motorized valve opening and closing the inlet for flushing radiator and outlet valve of radiator manually with human power. Because this process is risky and takes time, we suggest to modify the valve using motorized valve This part often leak because of abrasion from sedimentation and makes the cooling water comes out from piping and Oil cooler for thrust/upper one mixed with oil in thrust/upper set oil basin and need to stop operating for long time to fix the leakage so we hope to have spare oil cooler for backup Total Mechanical Equipment Turbines Existing runner always got Two new runner with coating abrasion because of for abrasive sediment sedimentation though it was protection coated and we need spare to reduce maintenance time Guide Vane Existing guide vanes always got Two sets Guide vane and abrasion because of coating work for abrasive sedimentation though it was sediment protection coated and we need spare to reduce maintenance time Two sets Guide vane bushing This part needed to change for head cover annually because of abration Two sets Guide Vane “U” This part needed to change Packing annually because of abration Two sets of Guide Vane This part needed to change in Assembling Parts major overhaul Main Inlet Valve General maintenance, procurement of spare parts - 2 sets of V-Type Packing - 2 sets of by-pass elbow This part often leaks due to - 2 sets of by-pass gasket operation lifetime and abration flanges (penstock side and by- pass side) - Etc. Other Auxiliary Plant Systems This pump sometimes got failure because often operate Two sets of Drainage Pump due to leakage of water in turbine pit This pump sometimes got failure because often operate One set of Jetpump due to leakage of water in turbine pit Total Civil Work & Equipment Reservoir Procurement and construction Prevent sedimentation rate to of SABO DAM reservoir