You are on page 1of 9

OVER TIME & NIGHT SHIFT ACTIVITY

Date: 19 11 2022

MP Shift 1
No Area SPV
19.00 - 22.00
1 Production

2 Septian 30

Can Making, sugar,


motor cycle park

Filling Packing &


3
Alcove

4 Tomi 35

Energy - Micro Lab -


Pipe rack - chemical
waste - RAW Milk
Lab and Reception

5
Main
Office,GH,Mushola,je
mbatan, Car Park
6 Infrastructure Ferry 21

7 PT TPP
8 PT SML

PT TANDON
9
(Plumbing)

PT TANDON (Fire
10
Fighter)

11 PT ARMINDO Tedy 10

12 Finishing Production

Finishing Filling
13
Packing

14 Kristalisasi

WWTP + PT
15
Abimanyu
16 PT Kharisma

17 PT Fico(Tetra Pak)

18 PT IKM
19 Bor Pile Pagar

20 PT Gaja
21 PT.CHC

Crystalisasi
22
(Finishing)

23 External

24 RMS Toto 80

25 SUGAR (Finishing)

26 MDC Candra 24

27 PT.GTA
28 PT.Susilo Jaya P

29 PT.Tritunggal Prima

Total Manpower 200


Required SHE On site 4
% of Overtime 16%
& NIGHT SHIFT ACTIVITY 25

Total
Pasang Morning
HB, plester Shift Worker: 1233 SHE 32
dinding, pasang
scaffolding, acian Approved
MP Shift 2 dinding, clearance by
Jobdesk Remarks
dak, expose dak Beca/FFI
22.00 - Ended dan dindinh, cat, Yes/No
pasang rangka
partisi. Pembesian
slab, Tb, Pc, colom
wall. Formwork
slab, Tb, Pc, kolom
wall. Pasang dan
bongkar perancah, Supervisor &
N/A Yes
hollow, plywood. SHE standby,
Urug siku dan LMRA,
pemadatan Pencahayaan
Perapian,COR Min 100 Lux,
Tutup tangga main Lakukan
office 7m3 Housekeeping

Energy: pasang
scaffold, plester
aci, repair skimcoat
scissor lift.
Microlab: pasang
bata HCB, cor
kolom praktis.
Chemical waste:
N/A pasang bekisting Yes
pedestal, repair Supervisor &
rebar pedestal. SHE standby,
RAW Milk Lab and LMRA,
Reception: pasang Pencahayaan
batako, galian Min 100 Lux,
manual, instal Lakukan
rebar Housekeeping
Pembesian rigid
parkiran,pengecora Supervisor &
8 n rigid,gelar plastik SHE standby, Yes
cor,pengelasan LMRA,
dhowel. Pencahayaan
Min 100 Lux,
Lakukan
Housekeeping

Supervisor &
N/A SHE standby, Yes
LMRA,
LT GF AS Pencahayaan
05-12/UA-UB Min 100 Lux,
Production-piping Lakukan
fire alarm Housekeeping
Pasang bekisting
(batako+formwork
). Pasang besi. Lakukan TBM,
Pasang siku Blood Pressure
galvanis/relat. check, Fatique
Pasang tenda. check, Tools and
Pasang equipment
perancah,pengecor inspection (Life
an slab dinding Line, APD check
10 dock at 12-13/ra- etc), Supervisor Yes
rc vol 28m3. & SHE standby,
pengecoran slab LMRA,
mezzanine vol.10 Pencahayaan
m3, PC+TB AS16- Min 100 Lux,
17 vol.10m3, LC Lakukan
vol.12m3 Housekeeping
Lakukan TBM,
Blood Pressure
check, Fatique
check, Tools and
equipment
inspection (Life
Line, APD check Yes with
12 etc), Supervisor note at red
Pasang batako, & SHE standby, mark
pengecoran LMRA,
dinding+lc (bisa Pencahayaan
dimulai jika join Min 100 Lux,
inspectionsudah Lakukan
approved) Housekeeping
30
1
2%
Required SHE On site

Spv 43