The document outlines the manpower allocation for various construction teams (A through H) working on bridge projects from February 8th to March 5th. It details the team members, their roles, the scope of their work, work locations, start and end dates, and equipment used. Multiple teams will be working simultaneously on erecting pipes and hollows, scaffolding, fabrication, painting, and other tasks at both new and existing bridge locations.
The document outlines the manpower allocation for various construction teams (A through H) working on bridge projects from February 8th to March 5th. It details the team members, their roles, the scope of their work, work locations, start and end dates, and equipment used. Multiple teams will be working simultaneously on erecting pipes and hollows, scaffolding, fabrication, painting, and other tasks at both new and existing bridge locations.
The document outlines the manpower allocation for various construction teams (A through H) working on bridge projects from February 8th to March 5th. It details the team members, their roles, the scope of their work, work locations, start and end dates, and equipment used. Multiple teams will be working simultaneously on erecting pipes and hollows, scaffolding, fabrication, painting, and other tasks at both new and existing bridge locations.
SHIFT NO TEAM A SCOPE OF WORK LOKASI START END TOOL
1 PARULIAN ERECTOR SEMENTARA PASANG 2 EDI SUPARDI ERECTOR HOLLOW JEMBATAN BARU, 3 SAKUR HELPER CUTTING TORCH PASANG BASE PLATE QTY 56 4 ABDULHADI HELPER TMC 9T-1 SET 5 DADI OPERATOR TMC JEMBATAN TRAFO LAS SIANG 18 Feb 2022 5 Mar 2022 6 WELDER TAMBAHAN BARU EXISTING 7 WELDER TAMBAHAN BARU ERECTION PIPA 8" QTY 13 8 UNIT
SHIFT NO TEAM B SCOPE OF WORK LOKASI START END TOOL
1 RAHMAT ERECTOR 2 RIZKI ERECTOR CRANE 50T XCMG 3 TAMING HELPER GENSET 4 SARIP HELPER ERECTION PIPA 16" TRAFO LAS SIANG JEMBATAN BARU 8 Feb 2022 25 Feb 2022 5 TONI WELDER PRECASH 6 ROKIB WELDER 7 AWALUDIN OPERATOR CRANE 50 8 SANUSI OPERATOR MANLIFT SHIFT NO TEAM C SCOPE OF WORK LOKASI START END TOOL 1 DIDI SUPARDI ERECTOR TAMBAHAN BARU 2 MASTAKA ERECTOR TAMBAHAN BARU CUTTING TORCH 3 SUHAERI HELPER PASANG HOLLOW TMC 9T-2 SIANG JEMBATAN BARU 8 Feb 2022 25 Feb 2022 4 SUGANDA HELPER JEMBATAN BARU TRAFO LAS 5 UDIN OPERATOR TMC 6 WELDER TAMBAHAN BARU SHIFT NO TEAM D SCOPE OF WORK LOKASI START END TOOL 1 SAHRUDIN ERECTOR TAMBAHAN BARU 2 HOTIBUL UMAM HELPER CUTTING TORCH 3 SUBADA HELPER TAMBAHAN BARU PASANG HOLLOW CRANE 25T OOMLION SIANG JEMBATAN BARU 8 Feb 2022 25 Feb 2022 4 YADI OPERATOR CRANE 25 JEMBATAN BARU TRAFO LAS 5 6 SHIFT NO TEAM E SCOPE OF WORK LOKASI START END TOOL 1 NURDIN SUPERVISOR 2 REJO ERECTOR GENSET 3 HAMDAN HELPER TRAFO LAS 4 SARMAN WELDER ERECTION PIPA 16" MALAM 5 SURYANI WELDER JEMBATAN BARU 8 Feb 2022 25 Feb 2022 PRECASH 6 FATONI WELDER 7 DEDI IRAWAN WELDER 8 ALVIN OPERATOR CRANE 50 9 RAHMAN OPERATOR MANLIFT SHIFT NO TEAM F SCOPE OF WORK LOKASI START END TOOL 1 MUKLIS ERECTOR 2 NANO ERECTOR CRANE 25T OOMLION MALAM 3 NAWIRI HELPER ERECTION HOLLOW JEMBATAN BARU 8 Feb 2022 25 Feb 2022 TRAFO LAS 4 SUDIRMAN HELPER 5 PARLAHIAN OPERATOR CRANE 25 SHIFT NO TEAM G SCOPE OF WORK LOKASI START END TOOL 1 MISROYANI SCAFOLDER 2 MISRI SCAFOLDER JEMBATAN BARU / SIANG 3 DEDI SUPENDI HELPER SCAFOLDER SCAFOLDING 8 Feb 2022 25 Feb 2022 LAMA 4 SUDIRMAN HELPER SCAFOLDER
SHIFT NO TEAM H SCOPE OF WORK LOKASI START END TOOL
1 YADI FITTER WORKSHOP 2 SUHELI FITTER WORKSHOP SIANG 3 HASBULLAH WELDER WORKSHOP FABRIKASI HOLLOW ACP JEMBATAN BARU 8 Feb 2022 19 Feb 2022 GENSET TRAFO LAS
SHIFT NO TEAM F SCOPE OF WORK LOKASI START END TOOL
1 M. NUR HELPER SIANG PAINTING TOUCH UP JEMBATAN BARU 8 Feb 2022 25 Feb 2022 MAINLIFT 2 EPI HELPER
1 MARSA DRIVER 2 SURYADI GUDANG 3 IDRUS ELECTRICAL 4 LAEL SAFETY MAN MALAM