CARIBBEAN MILITARY

TECHNICAL TRAINING INSTITUTE


External exam
Unit titles and codes:
MEMINS0162B: Cut, fit and install trunking systems
MEMINS0172B: Prepare and install basic cable trays
MEMINS0062A: Terminate and connect specialist cables
MEMCOR0012C: Plan a complete activity
MEMINS0262A: Install distribution panels, metering sockets, terminal mains and meter
Earthing systems
EEMINS0022A: Perform basic testing and inspection on electrical installations
Candidate Name: ___________________________
Skill Area: Electrical Installation Level 2
Time Allotted: 2 hrs

GENERAL INSTRUCTIONS:

1. Answer all questions.


2. Do not mark on the question paper
3. Direct all questions to the invigilator(s)

1. Label the parts on the diagram indicated by the number 1-5 below:

1.____________________________, 2.____________________________

3.____________________________, 4._____________________________

5.___________________________ (5 marks)

2. Identify the components for the external SWA gland below. (7 marks)

1.)___________________________

2.) __________________________

3.)___________________________

4.) __________________________

5.)___________________________

6.)__________________________

7.)__________________________
3(a) Distinguish between specialist and data cables. (4 marks)

________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
_______________________________________________________________________

(b) Give two examples of each and their applications. (4 marks)

________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________

4 What does the acronym XLPE means? (1 mark)

________________________________________________________________________

5.(a) What does the acronym MIMS means? (1 mark)

________________________________________________________________________

(b) State two (2) advantages and disadvantages each for the M.I.M.S cable. (4 marks)

________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________

6.List four (4) support methods used with Cable trays. (4 marks)

________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________

7. Final inspection are undertaken to ensure the installation of SWA systems and terminal
main conform to requirements. Write three ways that inspections should be carried out.
(3 marks)
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________

10. What size circuit breaker and PVC wire is appropriate to protect the following circuits?

(6 marks)

(i) 220V, 6.8A Motor_____________________________

(ii) 220V, 1400rpm, 15.8A Air compressor motor__________________________

(iii) 220V, 40A, Water Heater__________________________

11. Mr. Osborne is applying for a teaching position at the JDF TTI, Kingston 5. On Monday
20 June 2017 he was summon for an interview. During the interview the Director asked Mr.
Osborne the following questions:

(i) Explain what an electrical Trunking is. (2


marks)

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

(ii) State the main function(s) of the trunking system. (2 marks)

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

12. When carrying out an insulation resistance test on an installation, the electrician should
check between live conductors and earth. State the readings that he/she should obtain
according to the JS21 for the installation to be deemed satisfactory. (3 marks)

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

13. If you are a GEI inspector and you are assigned to carry out inspection on a new
installation, outline five (5) inspection checks that you would carry out to ensure that
installation is certified in accordance to the JS316. (5 marks)

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

14. Which measuring instrument is used for testing of insulation resistance? (2 marks)

______________________________________________________________________________
______________________________________________________________________________

15. Based on the JS21, earthing for any installation is important. Give Two (2) reasons to
support this statement.
(2 marks)

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
________________________________________________

16. The safe and effective utilization of electricity in people’s premises require that certain
condition must be fulfilled. State the (6) six criteria that must be met for fulfilling the
requirements of safe and effective utilization of electricity in people’s premises.
(6 marks)

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
__________________

Total marks:
PRACTICAL

Group: Electrical Installation Level 2

Candidate’s Name: _____________________ Date: _

Candidate’s Number: ________________________________________________________

Unit titles and codes:


MEMINS0162B: Cut, fit and install trunking systems
MEMINS0172B: Prepare and install basic cable trays
MEMINS0062A: Terminate and connect specialist cables
MEMCOR0012C: Plan a complete activity
MEMINS0262A: Install distribution panels metering sockets, terminal mains and meter
Earthing systems
EEMINS0022A: Perform basic testing and inspection on electrical installations
Instructions:
1. Read the task carefully before attempting.
2. Direct all queries to the instructor.
3. Students are required to be attired in the correct P.P.E (gloves, coverall, safety glass)
4. Students are responsible for all materials issued to them.

Scenario:
You are required by operators of JDF TTI to carry out a thorough check on the electrical
installation facilities for the welding and fabrication workshop to ensure that it is in keeping with
the location standard. If any problem is identifying, you will be required to carry out the
necessary troubleshooting technique to locate and rectify the fault.

You are required to do the following;


A. Earth continuity test
B. Verification of Polarity test
C. Insulation resistance test
D. Earth ground resistance test
MARK SCHEME

Criteria 0 1 2 3 4 5
Use of appropriate PPE
Selection of appropriate tools/equipment
Appropriate use of tools/equipment
Test
Earth continuity test
Verification of Polarity Test
Insulation Resistance Test
Earth ground Resistance Test
TOTAL MARKS (40)

TOTAL: ____________________________

RATING: __________________________

Rating Scale Score (%)

5. Can perform the task with initiative and adaptability to problem situations. 80 - 100
4. Can perform the task satisfactorily without assistance and/or supervision. 70 - 79
3. Can perform the task but requires periodic assistance and/or supervision. 60 - 69
2. Can perform limited parts of the tasks satisfactorily requires considerable
assistance. 50 - 59
1. Has not demonstrated sufficient evidence on which judgment can be made 49 - 0

Feedback to Trainee:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________