Professional Documents
Culture Documents
Expenses
Maintenance and Other Operationg Expenses
Other Maintenance and Operating Expenses
5029999002 Other Maintenance and Operating Expenses
Other Maintenance and Operating Expenses N/A -
- - - 1 293,476.00
Sub Total
Grand Total
293,476.00
293,476.00
293,476.00
PROJECT PROCU
Expenses
Maintenance and Other Operationg Expenses
Other Maintenance and Operating Expenses
5029999002 Other Maintenance and Operating Expenses
Other Maintenance and Operating Expenses N/A -
-Improvement of Business Center lot
-Multi-Purpose 5 Layer/4-Layer Steel Rack-Metal
pcs
Powder Coated Shelf Can be Layered
-3 Lamps Vintage Pendant Lights Modern Chandelier
Loft Ceiling Pendant Lamp Retro Hanging Lamp,
Height: 144 cm. Length: 50cm, Width: 15cm, Color: unit
Black, Lmaterial: Metal, Number of Lamps: 3, Base
Type: E27
Other Maintenance and Operating Expenses N/A -
- - -
- 1 225,948.72
- 5 5,500.00
- 6 3,000.00
- - - 1 22,027.28
Sub Total
Grand Total
Reminders:
Grand Total
18,000.00
22,027.28
293,476.00
293,476.00
PROJECT PROCURE
Expenses
Maintenance and Other Operating Expenses
General Services
5021203000 Security Services
Procurement of Security Services N/A ✔
Capital Outlays
Property, Plant and Equipment Outlay
5060404000 Building and Other Structures Outlay
Establishment of 10 modular classrooms N/A
Installation/connection of Primary Electrical lines of N/A ✔
10 modular classrooms
Construction of new Cagas Gym N/A ✔
Installation/connection of Primary Electrical lines of N/A ✔
new Cagas gym
Installation of solar powered perimeter lights N/A ✔
Construction for Proposed Fencing (Approximate N/A
length 249.9 meters)
Construction for Proposed Fencing- Kapoc N/A ✔
5060405000 Machinery and Equipment Outlay
Procurement, Delivery, and Installation of Outdoor
LED Wall for Davao del Sur State College N/A ✔
✔ ✔ ✔ 1000000 1.00
Sub Total
1 2,186,768.00
Sub Total
✔ ✔ 1 6,200,000.00
✔ ✔ ✔ 1 300,000.00
✔ ✔ ✔ 1 6,000,000.00
✔ ✔ ✔ 1 300,000.00
✔ ✔ ✔ 1 412,000.00
✔ ✔ 1 697,954.18
✔ 1 3,400,000.00
Sub Total
✔ 1 2,850,000.00
Sub Total
✔ ✔ ✔ 1 307,880.08
Sub Total
Grand Total
1,000,000.00
1,000,000.00
2,186,768.00
2,186,768.00
6,200,000.00
300,000.00
6,000,000.00
300,000.00
412,000.00
697,954.18
3,400,000.00
17,309,954.18
2,850,000.00
2,850,000.00
307,880.08
307,880.08
23,654,602.26
PROJECT P
Expenses
Maintenance and Other Operating Expenses
General Services
5021203000 Security Services
Capital Outlays
Property, Plant and Equipment Outlay
5060404000 Building and Other Structures Outlay
Establishment of 10 modular classrooms N/A
Installation/connection of Primary Electrical lines of N/A ✔
10 modular classrooms
Installation of solar powered perimeter lights N/A ✔
Construction for Proposed Fencing (Approximate N/A
length 249.9 meters)
Construction for Proposed Fencing- Kapoc N/A ✔
Geotechnical Investigation Report for the Subsurface
N/A
Soil Exploration for the Kapoc, Matanao Campus
Supply , Delivery and Installation of Doors for
N/A
Gen.Ed
Supply and Delivery of 5 Units Tarpaulin Display
N/A
Board with Metal Frame
✔ ✔ ✔ 1000000 1.00
Sub Total
1 2,186,768.00
✔ 1 43,070.00
✔ 1 100,700.00
✔ ✔ 15 4,350.00
✔ ✔ 156 450.00
Sub Total
✔ ✔ 1 6,200,000.00
✔ ✔ ✔ 1 300,000.00
✔ ✔ ✔ 1 651,000.00
✔ ✔ 1 835,600.00
✔ 1 4,686,550.00
✔ 1 200,000.00
✔ 8 14,950.00
✔ 1 21,500.00
Sub Total
✔ 1 2,850,000.00
✔ 1 60,000.00
✔ 1 650,000.00
Sub Total
✔ ✔ ✔ 1 307,880.08
✔ 1 48,000.00
✔ 1 28,000.00
✔ 2 20,000.00
✔ ✔ ✔ 1 3,190,484.18
Sub Total
Grand Total
2,186,768.00 4,686,550.00
43,070.00
100,700.00
65,250.00
70,200.00
2,465,988.00
61.52
45.05
106.57
6,200,000.00
300,000.00
651,000.00
835,600.00
4,686,550.00
200,000.00
119,600.00
21,500.00
13,014,250.00
2,850,000.00
60,000.00
650,000.00
3,560,000.00
307,880.08
48,000.00
28,000.00
40,000.00
3,190,484.18
3,614,364.26
23,654,602.26 3,190,484.18
137,584.30 835,600.00
1,286,504.95 4,686,550.00
1,424,089.25
1,424,195.82
-
ANNEX "B"
PROJECT PROCUREMENT MANAGEMENT PLAN (PPPMP)
Year: 2022
Year: 2022
Expenses 33
Maintenance and Other Operating Expenses
Traveling Expenses
5020101000 Traveling Expenses- Local
Expenses for Official Travels in F.Y. 2022 N/A ✔ ✔ ✔ ✔ 0 20,000.00 20,000.00
Sub Total 20,000.00
Training and Scholarship Expenses
5020201000 Training Expenses 30000
Expenses for Official Trainings in F.Y. 2022 N/A ✔ ✔ ✔ ✔ 0 30,000.00 30,000.00
30000 30,000.00
Communication Expenses
Prepaid Load Cards, P300 40 12000 12,000.00