Professional Documents
Culture Documents
To,
Engineer - Structure
Subject: Transfer from Bridge 60 (Sawalkot, Reasi) to Dugha Project (Tata’s Portal 1).
As per the management directives, your services will be transferred temporary from Bridge 60 Sawalkot
to Dugha Project (Tata’s Portal 1) with effect from 13th August 2022.
All the other terms and conditions mentioned in your appointment letter will remain same. Any changes
Ravi
Manager – HR