Improving refugees and host communities access to WASH within and around the UM

sangour camp in White Nile State Sudan -Lot I- Rehabilitation of the network
· Annex 6- Technical Design of Water distribution point and soak-away pit
Issue for Tender location UM sangour Camp Date : 16/10/2022
160
100
Joanna Itzel Becerra Ibarra head of delegation SpRC ................................
14
80
Edgar Leitao Barata WASH delegate SpRC ................................
El-basher Mohamed
30
WASH officer
6
2" inch PVC vent pipe
2" inch ball valve
SRCS ................................
reinforcement slab with
manhole cover for maintaining 2" galvanized steel pipe
WDP = water distribution point
and cleaning end cap
30
All dimensions in cm
160 20
10 37 25 40
120 20 drainage channel
5
15 10
porous soil
8 45
30
Taps must be evaluated at late stage
2" PVC pipe sub base
50
5
Only for new construction apply the design
sand
149.8411
5 to 10 gravel
Backfill with sub base according to the condition of the
surroundings area of the water distribution point
10 to 20 gravel existing soil at the camp existing soil at the camp
porous soil , could be sand
The structural should be from bricks (5*10*20)cm size with
WDP front view WDP side view mortar cement bounding
270 supply 2" galvanized steel pipe
230
edge to control location
190
32
structural
of jerkin
10
sub base
4

30 80 160
2" inch PVC drainage pipe
2" inch PVC vent pipe
reinforcement slab
127
10 with manhole cover
167
20 25
existing clay soils
for maintaining and
cleaning
WDP top view 5 to 10 gravel
sand
WDP 3D view
10 to 20 gravel