Amount
Ref Description Unit Quantity Rate
SAR
DAYWORK SCHEDULE
• Establishment charges;
• Housing costs;
• Subsistence allowances;
• Food allowances;
• Medical treatment;
Total - SAR
Carried to Collection
Client: INJAZ Development Co.
Project: Al Marina Development PAGE
PACKAGE 1 DW / 2
NUMBER
Bill of Quantities DAYWORK SCHEDULE
Infrastructure Construction
Amount
Ref Description Unit Quantity Rate
SAR
Total - SAR N.A.
Carried to Collection
• Overtime;
• Incentive bonuses;
• Executive superintendence;
• Time keeping;
Amount
Ref Description Unit Quantity Rate
SAR
Amount
Ref Description Unit Quantity Rate
SAR
Amount
Ref Description Unit Quantity Rate
SAR
Amount
Ref Description Unit Quantity Rate
Total - SAR SAR
Carried to Collection
Client: INJAZ Development Co.
Project: Al Marina Development PAGE
PACKAGE 1 DW / 7
NUMBER
Bill of Quantities DAYWORK SCHEDULE
Infrastructure Construction
Amount
Ref Description Unit Quantity Rate
SAR
C Mild steel plain bar reinforcement to BS 4449 sizes 12mm to Kg Rate Only
32 mm dia.
D Cold worked high tensile square twisted bar reinforcement Kg Rate Only
to BS 4461
Total - SAR
Carried to Collection
Client: INJAZ Development Co.
Project: Al Marina Development PAGE
PACKAGE 1 DW / 8
NUMBER
Bill of Quantities DAYWORK SCHEDULE
Infrastructure Construction
Amount
Ref Description Unit Quantity Rate
SAR
Total - SAR N.A.
Carried to Collection
A Excavators
Hydraulic excavator back hoe......…….. hp hr Rate Only
Digger and loader ....................................… hp hr Rate Only
B Tractors
Tractor, including dozer attachments …….hp hr Rate Only
C Loaders
Wheel-loader .................................................hp hr Rate Only
D Graders
Grader ...............................................hp hr Rate Only
Client: INJAZ Development Co.
Project: Al Marina Development PAGE
PACKAGE 1 DW / 9
NUMBER
Bill of Quantities DAYWORK SCHEDULE
Infrastructure Construction
Amount
Ref Description Unit Quantity Rate
SAR
Amount
Ref Description Unit Quantity Rate
SAR
A Trenchers
Trencher hr Rate Only
D Cranes
Mobile crane lift capacity 30 t or greater hr Rate Only
E Dump Trucks
Dump trucks 14m³ body hr Rate Only
Dump trucks 9 m³ body hr Rate Only
Dumper, capacity 1 m³ hr Rate Only
G Pumps
Portable pump, capacity 2" hr Rate Only
Submersible pump 20 kW hr Rate Only
Dewatering pump day Rate Only
Dewatering pump week Rate Only
H Generators
Generator set, size 35 kVA hr Rate Only
J Concreting plant
Concrete batching plant, wet capacity 25 m³ hr Rate Only
Concrete poker vibrator hr Rate Only
Total - SAR
Carried to Collection
Client: INJAZ Development Co.
Project: Al Marina Development PAGE
PACKAGE 1 DW / 11
NUMBER
Bill of Quantities DAYWORK SCHEDULE
Infrastructure Construction
Amount
Ref Description Unit Quantity Rate
SAR
Total - SAR N.A.
Carried to Collection
Client: INJAZ Development Co.
Project: Al Marina Development PAGE
PACKAGE 1 DW / 12
NUMBER
Bill of Quantities DAYWORK SCHEDULE
Infrastructure Construction
Amount
Ref Description Unit Quantity Rate
SAR
A Road vehicles
Tipper lorry, capacity 20 t
Light pick up 1 t capacity hr Rate Only
Water bowser, capacity ...................... litres hr Rate Only
F Concrete mixer, closed drum with hopper, any type of drive, hr Rate Only
fuel, all consumable stores and spares, capacity 10/7
G Dumper, fuel, all consumable stores and spares, capacity 3 hr Rate Only
ton tipper
H Motor lorry, fuel, all consumable stores and spares, hr Rate Only
capacity 3 ton tipper
J Wheel loader Cat 986 (or equivalent) including operator hr Rate Only
K Back hoe Cat 225 (or equivalent) including operator hr Rate Only
L Back hoe Cat 235 (or equivalent) including operator hr Rate Only
P Tractor and low bed trailer (or equivalent) including operator hr Rate Only
Amount
Ref Description Unit Quantity Rate
Total - SAR SAR
Carried to Collection
The item for overhead and profit percentage uplift shall apply
to all Variations authorised by the Engineer.
Amount
Ref Description Unit Quantity Rate
SAR
Amount
Ref Description
SAR
DAYWORK
J WATERPROOFING
SCHEDULE
COLLECTION
Page DW / 1 N.A.
Page DW / 2 N.A.
Page DW / 3 N.A.
Page DW / 4 N.A.
Page DW / 5 N.A.
Page DW / 6 N.A.
Page DW / 7 N.A.
Page DW / 8 N.A.
Page DW / 9 N.A.
Total - SAR
Carried to Grand Summary
Client: INJAZ Development Co.
Project: Al Marina Development PAGE
SECTION C
NUMBER
Bill of Quantities DAYWORK SCHEDULE
DW / S
Infrastructure Construction
Amount
Ref Description
SAR
Total - SAR N.A.
Carried to Grand Summary