You are on page 1of 3

SECTION E

PACKAGE 1 - GRAND SUMMARY


Client: INJAZ Development Co.
Project: Al Marina Development PAGE
PACKAGE 1
NUMBER
Bill of Quantities GRAND SUMMARY
GS / 1
Infrastructure Construction

Amount
Ref Description
SAR

GRAND SUMMARY

General Item From Page A / S

Roads From Page RD / S

Street Lighting From Page SL / S

Medium Voltage Electrical Network From Page MV / S

Low Voltage Electrical Network From Page LV / S

Storm Drainage From Page SD / S

Potable Water and Fire Fighting From Page PWFF / S

Sewerage From Page SW / S

Irrigation From Page IRR / S

Site Grading Works (Provisionnal) From Page e/1

Telecommunication (Provisionnal) From Page TL / S

Sub-total

Adjustment Item

Addition / Deduction in adjustment of the total of the Bill of Quantities which shall be deemed to
apply uniformly to all rates in the Bill of Quantities for the purpose of Valuations and Variations.

Total - SAR
Carried to Form of Tender
Client: INJAZ Development Co.
Project: Al Marina Development PAGE
PACKAGE 1
NUMBER
Bill of Quantities GRAND SUMMARY
GS / 1
Infrastructure Construction

Amount
Ref Description
SAR
Total - SAR
Carried to Form of Tender

You might also like