TECHNICAL QUERY
Client M/s. Tata Projects Limited (TPL)
Owner M/s. Indian Oil Corporation Ltd (IOCL)
Job Description Structure Steel supply, fabrication & erection at MS Block and Octamax unit-IOCL, Vadodara Project
Sr. Document Section no. / Bidder Queries Reply by M/s. TPL Remarks
Description as per Tender
No No./Name Clause No.
Supply, fabrication, painting (Surface preparation & primer only for fire
proofed steel) and erection of Structural Steel of grade E250BR/B0
(MB, MC, L & Plates), E350BR (Plates), S275JR / S275J0 / S355J0
(UB,UC) and Yst310 (Tubular) conforming to IS2062 or BS EN10025
or IS1161 as per approved drawings, specifications and as directed by
Engineer-in-charge.
Please mention the particular system no
Rate shall include high strength hot galvanized structural connections
(1.1,1.2,1.3,1.4) from table TABLE -01
bolts and nuts (not counted in weight) of 8.8 and / or 10.9 grade
1 Screenshot of Table-
BOQ D1 conforming to IS:3757 and IS4000 (Hexagonal nuts shall conform to System 1.3
Also 3 coats of primer required in sys 1.2 (ie; 01 given below
IS6623 and washers shall coform to IS6649)
FP-6, FP-3A & FP-1). Please confirm if all 3
- Painting shall be as per Tb 1 of specification 077154C-000-JSD-
coats to be considered as primer.
2300-001
- Structural steel includes trusses, purlins, girts, louvres, brackets,
sagrods, columns bracings,floor beams, girders, section built up out of
more than one rolled section or rolled section and plates, lifting beams,
monorails, connection plates, stairs (without treads), etc complete as
specified and directed by Engineer-in-charge.
4 Scope Labour induction, medical fitness and class room training expenses Please explain what are the components to be Class Room Training not required for the said
1.18
Matrix (around 2 weeks), Police verification certificate considered in class room training job. Contractor to deploy skilled personnel.
Area barricading will be done on the part of
5 Scope Area barricading (Hard barrication & Caution tape to be provided by
2.3 Please mention size of hard barrication. scope of job all around with a hieight of 1.5 M
Matrix Subcontractor in working area)
scaffold posts.
Specific Equipments like suitable cranes, Manlifters, scissor lifts etc for
structural works including Mobilization and demobilization.(Sub-
6 Scope Please confirm if new generation hydra like F- New Generation Farana less than 5 year old
6.2 Contractor's scope of work)
Matrix 15 can be allowed can be used in the said job
Hydra Crane not allowed for works
2900 MT - Pipe Racks
7 Tentative break up of structures 800-1000 MT - Technology Structures (
Equipment Support)
Balance Shed
Fabrication Drawing and Connection Design -
8 Scope on drawings validation in Tekla model - Vendor's Scope
( TPL will provide GAD and Connection
Details)
Structure Proportion Qty. Type of Section
(%)
UC, UB, Channel,
Light (< 30 kg) 15
NPB, Angle
UC, UB, NPB,
Medium ( 30 kg to 60 kg) 25
Channel, Angle
9 Bifurgation of structures WPB,UC, UB,
Heavy (> 60 kg) 57
Connection plates
Plate Section 1 Plate
Built up using Rolled
Built up 2 Sections (I Section,
Channel & Angles)
Ladder
Miscellaneous 5% of Total Main Steel
,Handrail ,Hollow
Paint and Surface preparation details -
10 DFT/ Paint System to be followed for Fire
Proof and No-Fire Proof :
ii