You are on page 1of 13

Development of ‘Bundelkhand Expressway’ (Package-III) from Kaohari (Dist. Mahoba) to Baroli Kharka (Dist.

Hamirpur) (Km 100+000 to Km 149+000) in the State of Uttar Pradesh on Engineering, Procurement, Construction
("EPC") basis.

EPC : Ashoka Buildcon Ltd., (100+000 to 149+000)


Client : Uttar Pradesh Expressway Industrial Development Authority
Consultant : Intercontinental Consultant & Technocrats Private Limited
Project End Date = 14/Jan/23
Today's Date = 28/Jan/20
Balance Days = 1082.000

Upto Previous Date Current Work Upto Date Cumulaltive %


Descriptioni of Items Unit Approx. Scope Balance Qty.
Work Done Done Cumulative. Qty. of Work Done

Soil Dumping CuM 7,852,653.000 101,844.000 5,980.000 107,824.000 1.4% 7,744,829.000


L/S Main Carriage Way
C&G Ha. 98.000 3.600 3.600 3.7% 94.400
Emb. Top CuM 3,573,913.000 - - 0.0% 3,573,913.000
SG 1 CuM 91,875.000 - - 0.0% 91,875.000
SG 2 CuM 91,875.000 - - 0.0% 91,875.000
SG Top CuM 122,500.000 - - 0.0% 122,500.000
GSB CuM 134,750.000 - - 0.0% 134,750.000
WMM 1 CuM 45,937.500 - - 0.0% 45,937.500
WMM Top CuM 45,937.500 - - 0.0% 45,937.500
Kerb Km 49.000 - - 0.0% 49.000
Prime Coat SqM 563,500.000 0.0% 563,500.000
Tack Coat SqM 1,127,000.000 0.0% 1,127,000.000
DBM CuM 78,890.000 - - 0.0% 78,890.000
BC CuM 28,175.000 - - 0.0% 28,175.000

R/S Main Carriage Way


C&G Ha. 98.000 3.600 3.600 3.7% 94.400
Emb. Top CuM 3,554,662.000 - - 0.0% 3,554,662.000
SG 1 CuM 91,875.000 - - 0.0% 91,875.000
SG 2 CuM 91,875.000 - - 0.0% 91,875.000
SG Top CuM 122,500.000 - - 0.0% 122,500.000
GSB CuM 134,750.000 - - 0.0% 134,750.000
WMM 1 CuM 45,937.500 - - 0.0% 45,937.500
WMM Top CuM 45,937.500 - - 0.0% 45,937.500
Kerb Rmt 49.000 - - 0.0% 49.000
Prime Coat SqM 563,500.000 0.0% 563,500.000
Tack Coat SqM 1,127,000.000 0.0% 1,127,000.000
DBM CuM 78,890.000 - - 0.0% 78,890.000
BC CuM 28,175.000 - - 0.0% 28,175.000

B/S Main Carriage Way


C&G Ha. 49.000 7.200 7.200 14.7% 188.800
Emb. Top CuM 7,128,575.000 - - 0.0% 7,128,575.000
SG 1 CuM 183,750.000 - - 0.0% 183,750.000
SG 2 CuM 183,750.000 - - 0.0% 183,750.000
SG Top CuM 245,000.000 - - 0.0% 245,000.000
GSB CuM 269,500.000 - - 0.0% 269,500.000
WMM 1 CuM 91,875.000 - - 0.0% 91,875.000
WMM Top CuM 91,875.000 - - 0.0% 91,875.000
Kerb Km 98.000 - - 0.0% 98.000
Prime Coat SqM 1,127,000.000 0.0% 1,127,000.000
Tack Coat SqM 2,254,000.000 0.0% 2,254,000.000
DBM CuM 157,780.000 - - 0.0% 157,780.000
BC CuM 56,350.000 - - 0.0% 56,350.000

L/S Service Road


C&G Ha. 73.500 - - 0.0% 73.500
Emb. Top CuM 362,039.000 - - 0.0% 362,039.000
SG 1 CuM 22,171.050 - - 0.0% 22,171.050
Development of ‘Bundelkhand Expressway’ (Package-III) from Kaohari (Dist. Mahoba) to Baroli Kharka (Dist.
Hamirpur) (Km 100+000 to Km 149+000) in the State of Uttar Pradesh on Engineering, Procurement, Construction
("EPC") basis.

EPC : Ashoka Buildcon Ltd., (100+000 to 149+000)


Client : Uttar Pradesh Expressway Industrial Development Authority
Consultant : Intercontinental Consultant & Technocrats Private Limited
Project End Date = 14/Jan/23
Today's Date = 28/Jan/20
Balance Days = 1082.000

Upto Previous Date Current Work Upto Date Cumulaltive %


Descriptioni of Items Unit Approx. Scope Balance Qty.
Work Done Done Cumulative. Qty. of Work Done

SG 2 CuM 22,171.050 - - 0.0% 22,171.050


SG Top CuM 29,561.400 - - 0.0% 29,561.400
GSB CuM 32,517.540 - - 0.0% 32,517.540
WMM 1 CuM 9,361.575 - - 0.0% 9,361.575
WMM Top CuM 9,361.575 - - 0.0% 9,361.575
Kerb Km 24.376 - - 0.0% 24.376
Prime Coat SqM 100,445.000 0.0% 100,445.000
Tack Coat SqM 200,890.000 0.0% 200,890.000
DBM CuM 14,062.300 - - 0.0% 14,062.300
BC CuM 5,022.250 - - 0.0% 5,022.250

R/S Service Road


C&G Ha. 73.500 - - 0.0% 73.500
Emb. Top CuM 362,039.000 - - 0.0% 362,039.000
SG 1 CuM 18,394.650 - - 0.0% 18,394.650
SG 2 CuM 18,394.650 - - 0.0% 18,394.650
SG Top CuM 24,526.200 - - 0.0% 24,526.200
GSB CuM 26,978.820 - - 0.0% 26,978.820
WMM 1 CuM 7,968.600 - - 0.0% 7,968.600
WMM Top CuM 7,968.600 - - 0.0% 7,968.600
Kerb Km 18.910 - - 0.0% 18.910
Prime Coat SqM 87,338.000 - - 0.0% 87,338.000
Tack Coat SqM 174,676.000 - - 0.0% 174,676.000
DBM CuM 12,227.320 - - 0.0% 12,227.320
BC CuM 4,366.900 - - 0.0% 4,366.900

B/S Service Road


C&G Ha. 49.000 - - 0.0%
Emb. Top CuM 724,078.000 - - 0.0% 724,078.000
SG 1 CuM 40,565.700 - - 0.0% 40,565.700
SG 2 CuM 40,565.700 - - 0.0% 40,565.700
SG Top CuM 54,087.600 - - 0.0% 54,087.600
GSB CuM 59,496.360 - - 0.0% 59,496.360
WMM 1 CuM 17,330.175 - - 0.0% 17,330.175
WMM Top CuM 17,330.175 - - 0.0% 17,330.175
Kerb Km 43.286 - - 0.0% 43.286
Prime Coat SqM 187,783.000 - - 0.0% 187,783.000
Tack Coat SqM 375,566.000 - - 0.0% 375,566.000
DBM CuM 26,289.620 - - 0.0% 26,289.620
BC CuM 9,389.150 - - 0.0% 9,389.150
RFI Descriptio
Date Ch. From Ch. To Side CW Length Width Depth Quantity Layer
Number n of Work
11-Jan-2020 - 124+000.0 124+350.0 L/S MCW 350.0 20 7,000.000 C&G
11-Jan-2020 - 124+000.0 124+350.0 R/S MCW 350.0 20 7,000.000 C&G
14-Jan-2020 - 101+500.0 101+950.0 L/S MCW 450.0 20 9,000.000 C&G
14-Jan-2020 - 101+500.0 101+950.0 R/S MCW 450.0 20 9,000.000 C&G
21-Jan-2020 - 101+500.0 102+500.0 L/S MCW 1000.0 20 20,000.000 C&G
NAMILICHERI

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 0+497 PUP 1 Not yet start 0+497 PUP 1 Not yet start 3 4
0+497 PUP 2 Not yet start 0+497 PUP 2 Not yet start

0+497 PUP 3 Not yet start 0+497 PUP 3 Not yet start

0+497 PUP 4 Not yet start 0+497 PUP 4 Not yet start
PUP @0+497 LMCW PUP @0+497 RMCW

1 2 Total 0.00 0.00 0.00 Total 0.00 0.00 0.00 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 1+948 PUP 1 Not yet start 1+948 PUP 1 Not yet start 3 4
1+948 PUP 2 Not yet start 1+948 PUP 2 Not yet start

1+948 PUP 3 Not yet start 1+948 PUP 3 Not yet start

1+948 PUP 4 Not yet start 1+948 PUP 4 Not yet start
PUP @ 1+948 LMCW PUP @1+948 RMCW

1 2 Total 0.00 0.00 0.00 Total 0.00 0.00 0.00 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 2+757 VUP 1 Not yet start 2+757 VUP 1 Not yet start 3 4
2+757 VUP 2 Not yet start 2+757 VUP 2 Not yet start

2+757 VUP 3 Not yet start 2+757 VUP 3 Not yet start

2+757 VUP 4 Not yet start 2+757 VUP 4 Not yet start
VUP @ 2+757 LMCW VUP @ 2+757 RMCW

1 2 Total 0.00 0.00 0.00 Total 0.00 0.00 0.00 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW
LMCW Average Average
Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 3+997 PUP 1 3849.939 3997.989 148.050 6.7 991.94 655 336.94 20th Layer 3+997 PUP 1 3789.992 3996.333 206.341 7.4 1535.18 789 746.18 21th Layer 3 4
3+997 PUP 2 3840.000 3997.989 157.989 6.4 1011.13 715 296.13 20th Layer 3+997 PUP 2 3789.992 3996.333 206.341 6.2 1272.81 654 618.81 21th Layer

3+997 PUP 3 4004.939 4179.989 175.050 5.6 980.28 605 375.28 21st Layer 3+997 PUP 3 4003.283 4249.433 246.150 5.9 1441.58 945 496.58 20th Layer

3+997 PUP 4 4004.939 4199.789 194.850 7.1 1383.44 785 598.43 21st Layer 3+997 PUP 4 4003.283 4236.833 233.550 7.9 1844.34 1190 654.34 20th Layer
PUP @ 3+997 LMCW PUP @ 3+997 RMCW

1 2 Total 4366.78 2760.00 1606.78 Total 6093.91 3578.00 2515.91 1 2

MINJUR
Page 1
NAMILICHERI

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 5+072 PUP 1 Not yet start 5+072 PUP 1 Not yet start 3 4
5+072 PUP 2 Not yet start 5+072 PUP 2 Not yet start

5+072 PUP 3 Not yet start 5+072 PUP 3 Not yet start

5+072 PUP 4 Not yet start 5+072 PUP 4 Not yet start
PUP @ 5+072 LMCW PUP @ 5+072 RMCW

1 2 Total 0.00 0.00 0.00 Total 0.00 0.00 0.00 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 5+967 PUP 1 5967.594 5771.596 195.998 6.7 1313.19 590 723.19 14th Layer 5+967 PUP 1 5967.454 5806.402 161.052 7.4 1198.23 498 700.23 11 th Layer 3 4
5+967 PUP 2 5967.594 5810.572 157.022 6.4 1004.94 450 554.94 14th Layer 5+967 PUP 2 5967.454 5827.58 139.874 6.2 862.81 286 576.81 11 th Layer

5+967 PUP 3 5974.544 6199.377 224.833 5.6 1259.06 515 744.06 12th Layer 5+967 PUP 3 5974.404 6137.342 162.938 5.9 954.25 369 585.25 10th Layer

5+967 PUP 4 5974.544 6181.944 207.400 7.1 1472.54 695 777.54 12th Layer 5+967 PUP 4 5974.404 6106.618 132.214 7.9 1044.09 415 629.09 10th Layer
PUP @ 5+967 LMCW PUP @ 5+967 RMCW

1 2 Total 5049.73 2250.00 2799.73 Total 4059.38 1568.00 2491.38 1 2

LMCW RE Wall Erection details Upto17/05/2015* RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

5 6 6+641 VUP 5 6474.33 6632.43 158.100 8.53 1348.51 615 733.51 11th Layer 6+641 VUP 5 6450.996 6633.246 182.250 8.74 1592.04 495.0 1097.04 9th Layer 5 6
6+641 VUP 6 6460 6632.43 172.430 6.68 1151.66 498 653.66 11th Layer 6+641 VUP 6 6464.496 6633.246 168.750 5.96 1005.41 415.0 590.41 9th Layer
6+641 VUP
6+641 VUP

VUP @ 6+641 LMCW VUP @ 6+641 RMCW

6+641 VUP
6+641 VUP

Total 2500.17 1113.00 1387.17 Total 2597.46 910.00 1687.46

RE Wall Erection details Upto17/05/2015* RE Wall Erection details Upto17/05/2015


LMCW

4
3 3 RMCW
4
LMCW Average Average
Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

Length
7+041 VUP
7+041 VUP
7+017 VUP 1 7026.546 7223.592 197.046 6.40 1261.09 628 633.09 10th Layer 7+041 VUP 1 7022.211 7200 177.789 6.60 1173.50 429.0 744.50 9th Layer

7+017 VUP 2 7025.154 7225.18 200.026 7.83 1565.80 659 906.80 10th Layer 7+041 VUP 2 7020.819 7169.544 148.725 8.34 1240.22 520.0 720.22 9th Layer
VUP @ 7+017 LMCW VUP @ 7+041 RMCW
7+017 VUP 3 6648.98 7009.904 360.924 11.00 3970.16 1299 2671.16 8th Layer 7+041 VUP 3 6649.796 7005.569 355.773 11.64 4140.31 2550.0 1590.31 15th Layer

7+017 VUP 4 6648.98 7008.512 359.532 11.57 4159.79 1395 2764.79 8th Layer 7+041 VUP 4 6649.796 7004.177 354.381 10.90 3862.75 2410.0 1452.75 15th Layer

1 2 Total 10956.85 3981.00 6975.85 Total 10416.78 5909.00 4507.78 1 2

* Note: The RE Walls No.3 & 4 are common for VUP@ Ch.6+641 and VUP @ Ch.7+041 * Note: The RE Walls No.3 & 4 are common for VUP@ Ch.6+641 and VUP @ Ch.7+041

MINJUR
Page 2
NAMILICHERI

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 7+617 VUP 1 7303.55 7613.873 310.323 4.6 1427.49 890 537.49 17th Layer 7+617 VUP 3 7310.366 7609.492 299.126 4.8 1435.80 765 670.80 13th Layer 3 4
7+617 VUP 2 7300.122 7612.273 312.151 4.9 1529.54 915 614.54 17th Layer 7+617 VUP 4 7327.809 7607.892 280.083 4.6 1288.38 690 598.38 14th Layer

7+617 VUP 5 7630.489 7890.817 260.328 4.6 1197.51 1197.51 0.00 Coping beam in progress 7+617 VUP 7 7626.108 7876.01 249.902 4.8 1199.53 1199.53 0.00 Coping beam in progress

7+617 VUP 6 7628.889 7902.936 274.047 4.8 1315.43 1315.43 0.00 Coping beam in progress 7+617 VUP 8 7624.508 7863.221 238.713 4.6 1098.08 1098.08 0.00 Coping beam in progress
VUP @ 7+617 LMCW VUP @ 7+617 RMCW

1 2 Total 5469.96 4317.94 1152.02 Total 5021.80 3752.61 1269.19 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 8+602 PUP 1 8450.998 8598.876 147.878 3.8 561.94 561.94 0 Coping Beam in progress 8+602 PUP 3 8441.629 8598.876 157.247 3.8 597.54 597.54 0 Coping Beam in progress 3 4
8+602 PUP 2 8435.857 8598.876 163.019 3.7 603.17 603.17 0 Coping Beam in progress 8+602 PUP 4 8449.794 8598.876 149.082 3.7 551.60 551.60 0 Coping Beam in progress

8+602 PUP 5 8605.776 8830.414 224.638 4 898.55 898.55 0.00 Coping Beam in progress 8+602 PUP 7 8605.776 8819.603 213.827 4.5 962.22 962.22 0 Coping Beam in progress

8+602 PUP 6 8605.776 8820.36 214.584 4.5 965.63 965.63 0.00 Coping Beam in progress 8+602 PUP 8 8605.776 8809.62 203.844 4.1 835.76 835.76 0 Coping Beam in progress
PUP @ 8+602 LMCW PUP @ 8+602 RMCW

1 2 Total 3029.29 3029.29 0.00 Total 2947.12 2947.12 0.00 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 9+052 VUP 1 8830.505 9069.762 239.257 4.8 1148.43 1028.00 120.43 22ed layer 9+052 VUP 3 8820.028 9044.167 224.139 5.4 1210.35 1031.04 179.31 22ed layer 3 4
9+052 VUP 2 8820.539 9062.822 242.283 5.2 1259.87 1138.80 121.07 23ed layer 9+052 VUP 4 8809.742 9037.289 227.547 5.1 1160.49 978.45 182.04 23ed layer

9+052 VUP 5 9093.166 9282.158 188.992 4.5 850.46 0.00 850.46 Not yet start 9+052 VUP 7 9067.521 9250.341 182.82 4.9 895.82 0 182.04 Not yet start

9+052 VUP 6 9086.238 9289.625 203.387 4.8 976.26 0.00 976.26 Not yet start 9+052 VUP 8 9060.644 9246.206 185.562 4.8 890.70 0 182.04 Not yet start
VUP @ 9+052 LMCW VUP @ 9+052 RMCW

1 2 Total 4235.03 2166.80 2068.23 Total 4157.36 2009.49 725.42 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 10+702 PUP 1 10512.345 10698.594 186.249 3.8 707.75 614.60 93.15 25th Layer 10+702 PUP 3 10523.95 10699.232 175.282 4 701.13 613.40 87.73 25th Layer 3 4
10+702 PUP 2 10500.92 10698.594 197.674 3.9 770.93 672.00 98.93 26th Layer 10+702 PUP 4 10540.86 10699.232 158.372 3.8 601.81 522.60 79.21 25th Layer

10+702 PUP 5 10705.494 10875.749 170.255 3.8 646.97 510.70 136.27 24nd Layer 10+702 PUP 7 10706.132 10885.985 179.853 3.9 701.43 495 206.43 26th Layer

10+702 PUP 6 10705.494 10879.179 173.685 3.9 677.37 538.40 138.97 23nd Layer 10+702 PUP 8 10706.132 10871.131 164.999 3.8 627.00 455 172.00 27th Layer
PUP @ 10+702 LMCW PUP @ 10+702 RMCW

1 2 Total 2803.02 2335.70 467.32 Total 2631.36 2086.00 545.36 1 2

MINJUR
Page 3
NAMILICHERI

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 12+246 PUP 1 11951.9 12245.735 293.835 4 1175.34 278 897.34 9th Layer 12+246 PUP 1 11928.822 12233.102 304.28 4.1 1247.55 478 769.55 6th Layer 3 4
12+246 PUP 2 11923.338 12241.054 317.716 4.2 1334.41 180 1154.41 10th Layer 12+246 PUP 2 11941.161 12228.421 287.26 4 1149.04 398 751.04 8th Layer

12+246 PUP 3 12253.04 12428.55 175.51 3.8 666.94 189 477.94 23th Layer 12+246 PUP 3 12240.407 12428.256 187.849 4 751.40 389 362.40 21th Layer

12+246 PUP 4 12248.359 12463.4 215.041 3.9 838.66 192 646.66 23th Layer 12+246 PUP 4 12235.726 12413.293 177.567 3.8 674.75 392 282.75 21th Layer
PUP @ 12+246 LMCW PUP @ 12+246 RMCW

1 2 Total 4015.35 839.00 3176.35 Total 3822.74 1657.00 2165.74 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 12+837 VUP 1 Not yet start 12+837 VUP 1 Not yet start 3 4
12+837 VUP 2 Not yet start 12+837 VUP 2 Not yet start

12+837 VUP 3 Not yet start 12+837 VUP 3 Not yet start

12+837 VUP 4 Not yet start 12+837 VUP 4 Not yet start
VUP @ 12+837 LMCW VUP @ 12+837 RMCW

1 2 Total 0.00 0.00 0.00 Total 0.00 0.00 0.00 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 13+976 VUP 1 13693.262 13957.046 263.784 4.80 1266.16 58.75 1207.41 1st Layer 13+976 VUP 1 13740.856 13957.046 216.190 5.00 1080.95 43.23 1037.72 1st Layer 3 4
13+976 VUP 2 13640.175 13960.154 319.979 5.20 1663.89 63.90 1599.99 1st Layer 13+976 VUP 2 13697.476 13960.154 262.678 5.10 1339.66 52.53 1287.13 1st Layer

13+976 VUP 3 13974.755 13347.002 627.753 4.60 2887.66 125.55 2762.11 1st Layer 13+976 VUP 3 13974.755 14359.571 384.816 4.80 1847.12 76.96 1770.16 1st Layer

13+976 VUP 4 13977.863 13348.984 628.879 5.00 3144.40 125.77 3018.63 1st Layer 13+976 VUP 4 13977.863 14335.716 357.853 5.10 1825.05 71.57 1753.48 1st Layer
VUP @ 13+976 LMCW VUP @ 13+976 RMCW

1 2 Total 8962.11 373.97 8588.14 Total 6092.77 244.29 5848.48 1 2

LMCW RE Wall Erection details Upto17/05/2015 RE Wall Erection details Upto17/05/2015 RMCW

LMCW Average Average


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Total QTY (From Executed till date
Wall Start Ch. End Ch. Length Height (From Remarks Start Ch. End Ch. Length Height (From Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Wall Num Drawing)Sqm QTY Sqm.
Num Drawing) Mts. Drawing) Mts.

3 4 15+455 VUP 1 15063.745 15432.474 368.729 4.70 1733.03 1090 643.03 19th Layer 15+455 VUP 1 15088.651 15445.593 356.942 6.20 2213.04 1259 954.04 18th Layer 3 4
15+455 VUP 2 15042.276 15434.857 392.581 4.80 1884.39 1295 589.39 19th Layer 15+455 VUP 2 15111.335 15447.976 336.641 4.70 1582.21 109 1473.21 19th Layer

15+455 VUP 3 15545.000 15710.155 165.155 5.20 858.81 0 858.81 Not yet start 15+455 VUP 3 15462.024 15709.926 247.902 5.30 1313.88 Not yet start

15+455 VUP 4 15456.288 15700.195 243.907 5.30 1292.71 0 1292.71 Not yet start 15+455 VUP 4 15464.407 15699.872 235.465 4.50 1059.59 Not yet start
VUP @ 15+455 LMCW VUP @ 15+455 RMCW

1 2 Total 5768.93 2385.00 3383.93 Total 6168.73 1368.00 2427.25 1 2

MINJUR
Page 4

LHS RE Wall Erection Total RHS RE Wall Erection Total


Total QTY
Total QTY (From Executed till Balance QTY Remarks (From Executed till Balance QTY Remarks
Drawing)Sqm date QTY Sqm. Sqm. date QTY Sqm. Sqm.
LHS RE WALL TOTAL RHS RE WALL TOTAL Drawing)Sqm

57157.21 25551.70 31605.51 54009.41 26029.51 24183.97


NEMILICHERI

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 16+900 PUP 1 16840 16936 96 4.771 458.02 458.02 16+900 PUP 1 16800 16937 137 5.3 726.10 726.10 3 4
16+900 PUP 2 16800 16937 137 5.109 699.93 699.93 16+900 PUP 2 16840 16937 97 4.669 452.89 452.89
16+900 PUP 3 16944 17030 86 4.669 401.53 401.53 16+900 PUP 3 16944 17120 176 4.669 821.74 821.74
16+900 PUP 4 16944 17120 176 5.465 961.84 961.84 16+900 PUP 4 16944 17030 86 4.669 401.53 401.53
PUP @16+900 LMCW PUP @16+900 RMCW

1 2 Total 2521.32 0.00 2521.32 Total 2402.27 0.00 2402.27 1 2

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 19+430 PUP 1 19227 19427 200 3.61 721 663.81 57.1900000000001 19+430 PUP 1 19227 19427 200 5.61 1122 1008 114 3 4
19+430 PUP 2 19227 19427 200 5.61 1122 1051.31 70.6900000000001 19+430 PUP 2 19227 19427 200 4.1 820 600 220
19+430 PUP 3 19433 19570 137 4.36 598 432.55 165.45 19+430 PUP 3 19433 19600 167 5.64 942 816 126
19+430 PUP 4 19433 19600 167 5.64 942 833.67 108.33 19+430 PUP 4 19433 19580 147 4.14 609 588 21
PUP @ 19+430 LMCW PUP @ 19+430 RMCW

1 2 Total 3383.00 2981.34 401.66 Total 3493.00 3012.00 481.00 1 2

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 20+025 PUP 1 19859 20021 162 4.6 745 665 80 20+025 PUP 1 19850 20021 171 5.62 961 942 19 3 4
20+025 PUP 2 19860 20021 161 6.0 960 854 106 20+025 PUP 2 19860 20021 161 4.64 747 739 8
20+025 PUP 3 20028 20170 142 4.7 661 412 249 20+025 PUP 3 20028 20170 142 5.80 824 562 262
20+025 PUP 4 20028 20170 142 5.9 831 612 219 20+025 PUP 4 20028 20170 142 4.54 645 426 219
PUP @ 20+025 LMCW PUP @ 20+025 RMCW

1 2 Total 3197.00 2543.00 654.00 Total 3177.00 2669.00 508.00 1 2

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 21+160 VUP 1 20941 21161 220 5.04 1108 656.02 451.98 21+160 VUP 1 20920 21156 236 6.61 1561 790.34 770.66 3 4
21+160 VUP 2 20920 21163 243 6.23 1515 1005.4 509.6 21+160 VUP 2 20928 21154 226 4.95 1119 411.36 707.64
21+160 VUP 3 21175 21400 225 3.40 766 142.53 623.47 21+160 VUP 3 21175 21400 225 13.84 3115 641.13 2473.87
21+160 VUP 4 21175 21400 225 13.94 3137 852.59 2284.41 21+160 VUP 4 21175 21400 225 3.40 764 101.88 662.12
VUP @ 21+160 LMCW VUP @ 21+160 RMCW

1 2 Total 6526.00 2656.54 3869.46 Total 6559.00 1944.71 4614.29 1 2

MINJUR
NEMILICHERI

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 22+783 PUP 1 22700 22760 60 4.57 274 44.31 229.69 22+783 PUP 1 22650 22760 110 5.37 591 210.7 380.3 3 4
22+783 PUP 2 22670 22760 90 5.39 485 132.9 352.1 22+783 PUP 2 22700 22760 60 4.93 296 64.55 231.45
22+783 PUP 22+783 PUP
22+783 PUP 22+783 PUP
PUP @ 22+783 LMCW PUP @ 22+783 RMCW

1 2 Total 759.00 177.21 581.79 Total 887.00 275.25 611.75 1 2

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 23+050 VUP 1 22767 23025 258 6.79 1751 267.07 1483.93 23+050 VUP 1 22767 23040 273 7.30 1992 299.29 1692.71 3 4
23+050 VUP 2 22767 23021 254 8.06 2046 437.79 1608.21 23+050 VUP 2 22767 23046 279 7.29 2035 416.29 1618.71
23+050 VUP 3 23040 23230 190 5.34 1014 0 1014 23+050 VUP 3 23055 23260 205 6.38 1307 244.69 1062.31
23+050 VUP 4 23045 23250 205 6.42 1317 228.43 1088.57 23+050 VUP 4 23061 23230 169 5.36 905 11.6 893.4
VUP @ 23+050 LMCW VUP @ 23+050 RMCW

1 2 Total 6128.00 933.29 5194.71 Total 6239.00 971.87 5267.13 1 2

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 24.063 VUP 1 23883 24080 197 5.26 1036 0 1036 24+063 VUP 1 23705 24054 349 6.62 2310 431.63 1878.37 3 4
24.063 VUP 2 23721 24071 350 6.49 2270 266.68 2003.32 24+063 VUP 2 23878 24054 176 4.90 862 166.24 695.76
24.063 VUP 3 24096 24280 184 4.81 885 0 885 24+063 VUP 3 24070 24315 245 6.48 1588 139.95 1448.05
24.063 VUP 4 24087 24300 213 6.40 1363 78.85 1284.15 24+063 VUP 4 24060 24300 240 5.00 1200 0 1200
VUP @ 24+063 LMCW VUP @ 24+063 RMCW

1 2 Total 5554.00 345.53 5208.47 Total 5960.00 737.82 5222.18 1 2

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 25+700 PUP cancelled 25+700 PUP 1 cancelled 3 4


25+700 PUP cancelled 25+700 PUP 2 cancelled

25+700 PUP cancelled 25+700 PUP 3 cancelled

25+700 PUP cancelled 25+700 PUP 4 cancelled


PUP @ 25+700 LMCW PUP @ 25+700 RMCW

1 2 Total 0.00 0.00 0.00 Total 0.00 0.00 0.00 1 2

MINJUR
NEMILICHERI

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 25+970 VUP 1 25830 25970 140 5.64 789.6 0 789.6 25+970 VUP 1 25740 25948 208 6.58 1368.64 91.38 1277.26 3 4
25+970 VUP 2 25740 25963 223 6.15 1371.45 122.45 1249 25+970 VUP 2 25830 25940 110 5.45 599.5 0 599.5
25+970 VUP 3 25986 26128 142 5.31 754.02 0 754.02 25+970 VUP 3 25963 26170 207 5.86 1213.02 153.17 1059.85
25+970 VUP 4 25978 26170 192 6.55 1257.6 0 1257.6 25+970 VUP 4 25956 26107 151 5.75 868.25 0 868.25
VUP @25+970 LMCW VUP @ 25+970 RMCW

1 2 Total 4172.67 122.45 4050.22 Total 4049.41 244.55 3804.86 1 2

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 28+700 VUP 1 28+700 VUP 1 3 4


28+700 VUP 2 28+700 VUP 2
28+700 VUP 3 28+700 VUP 3
Dwg not yet Dwg not yet
28+700 VUP 4 Received 28+700 VUP 4 Received
VUP @ 28+700 LMCW VUP @ 28+700 RMCW

1 2 Total 0.00 0.00 0.00 Total 0.00 0.00 0.00 1 2

LMCW RE Wall Erection details Upto 19/05/15 RE Wall Erection details Upto 19/05/15 RMCW

LMCW Average Height Average Height


Structure Type of Total QTY (From Executed till date Balance QTY Structure Type of RMCW Wall Total QTY (From Executed till
Wall Start Ch. End Ch. Length (From Drawing) Remarks Start Ch. End Ch. Length (From Drawing) Balance QTY Sqm. Remarks
Chainage Structure Drawing)Sqm QTY Sqm. Sqm. Chainage Structure Num Drawing)Sqm date QTY Sqm.
Num Mts. Mts.

3 4 30+100 PUP 1 30+100 PUP 1 3 4


30+100 PUP 2 30+100 PUP 2
30+100 PUP 3 30+100 PUP 3
Dwg not yet Dwg not yet
30+100 PUP 4 Received 30+100 PUP 4 Received
PUP @ 30+100 LMCW PUP @ 30+100 RMCW

1 2 Total 0.00 0.00 0.00 Total 0.00 0.00 0.00 1 2

NEMILICHERI

LHS RE Wall Erection Total RHS RE Wall Erection Total

Executed till
Total QTY (From Executed till Balance QTY Total QTY (From Balance QTY
Drawing)Sqm date QTY Sqm. Sqm. Remarks Drawing)Sqm date QTY Sqm. Remarks
LHS RE WALL TOTAL RHS RE WALL TOTAL Sqm.

32240.99 9759.36 22481.63 32766.68 9855.20 22911.48


Sub-Contractor Description of
Date Ch. From Ch. To Length Quantity
Name Work
M/s Balajee 25-Dec-2019 125+000.0 125+020.0 20.0 70.00 Soil Dumping
M/s Balajee 10-Jan-2020 100+000.0 100+110.0 110.0 510.00 Soil Dumping
M/s Balajee 11-Jan-2020 100+110.0 100+200.0 90.0 610.00 Soil Dumping
M/s Balajee 12-Jan-2020 100+050.0 100+200.0 150.0 900.00 Soil Dumping
M/s Balajee 12-Jan-2020 124+000.0 124+010.0 10.0 20.00 Soil Dumping
M/s Balajee 13-Jan-2020 100+000.0 100+050.0 50.0 320.00 Soil Dumping
M/s Balajee 13-Jan-2020 124+040.0 124+080.0 40.0 330.00 Soil Dumping
M/s Balajee 14-Jan-2020 100+920.0 100+970.0 50.0 195.00 Soil Dumping
M/s Balajee 14-Jan-2020 100+990.0 101+010.0 20.0 195.00 Soil Dumping
M/s Balajee 15-Jan-2020 101+120.0 101+150.0 30.0 300.00 Soil Dumping
M/s Balajee 15-Jan-2020 101+420.0 104+400.0 2980.0 310.00 Soil Dumping
M/s Balajee 15-Jan-2020 101+490.0 101+540.0 50.0 300.00 Soil Dumping
M/s Balajee 18-Jan-2020 101+550.0 101+600.0 50.0 465.00 Soil Dumping
M/s Balajee 18-Jan-2020 101+650.0 101+660.0 10.0 465.00 Soil Dumping
M/s Balajee 18-Jan-2020 101+700.0 101+850.0 150.0 465.00 Soil Dumping
M/s Balajee 18-Jan-2020 101+950.0 101+980.0 30.0 465.00 Soil Dumping
M/s Balajee 19-Jan-2020 102+330.0 102+350.0 20.0 354.00 Soil Dumping
M/s Balajee 19-Jan-2020 101+950.0 102+000.0 50.0 354.00 Soil Dumping
M/s Balajee 19-Jan-2020 101+500.0 101+580.0 80.0 354.00 Soil Dumping
M/s Balajee 19-Jan-2020 101+600.0 101+640.0 40.0 354.00 Soil Dumping
M/s Balajee 19-Jan-2020 100+940.0 100+990.0 50.0 354.00 Soil Dumping
M/s Balajee 19-Jan-2020 124+040.0 124+100.0 60.0 250.00 Soil Dumping
M/s Balajee 20-Jan-2020 124+000.0 124+150.0 150.0 1,130.00 Soil Dumping
M/s Balajee 20-Jan-2020 101+070.0 101+160.0 90.0 520.00 Soil Dumping
M/s Balajee 20-Jan-2020 100+640.0 100+700.0 60.0 500.00 Soil Dumping
M/s Balajee 20-Jan-2020 101+400.0 101+450.0 50.0 500.00 Soil Dumping
M/s Balajee 21-Jan-2020 100+350.0 100+660.0 310.0 530.000 Soil Dumping
M/s Balajee 21-Jan-2020 101+450.0 101+500.0 50.0 1,480.000 Soil Dumping
M/s Balajee 21-Jan-2020 124+150.0 124+300.0 150.0 1,070.000 Soil Dumping
M/s Balajee 22-Jan-2020 100+250.0 100+350.0 100.0 530.000 Soil Dumping
M/s Balajee 22-Jan-2020 100+250.0 100+500.0 250.0 1,500.000 Soil Dumping
M/s Balajee 22-Jan-2020 123+980.0 124+000.0 20.0 750.000 Soil Dumping
M/s Balajee 22-Jan-2020 124+300.0 124+350.0 50.0 750.000 Soil Dumping
M/s Balajee 22-Jan-2020 131+800.0 132+000.0 200.0 2,450.000 Soil Dumping
M/s Balajee 23-Jan-2020 100+500.0 100+700.0 200.0 1,205.000 Soil Dumping
M/s Balajee 23-Jan-2020 100+730.0 100+850.0 120.0 1,205.000 Soil Dumping
M/s Balajee 23-Jan-2020 124+300.0 124+350.0 50.0 1,205.000 Soil Dumping
M/s Balajee 23-Jan-2020 124+400.0 125+570.0 1170.0 1,205.000 Soil Dumping
M/s Balajee 23-Jan-2020 132+000.0 132+140.0 140.0 1,205.000 Soil Dumping
M/s Balajee 23-Jan-2020 132+190.0 132+350.0 160.0 1,205.000 Soil Dumping
M/s Balajee 23-Jan-2020 132+350.0 132+500.0 150.0 2,600.000 Soil Dumping
M/s M S Infra 23-Jan-2020 145+960.0 145+980.0 20.0 150.000 Soil Dumping
M/s M S Infra 24-Jan-2020 148+700.0 148+850.0 150.0 1,290.000 Soil Dumping
M/s M S Infra 24-Jan-2020 132+500.0 132+700.0 200.0 2,400.000 Soil Dumping
M/s Balajee 24-Jan-2020 138+100.0 138+200.0 100.0 700.000 Soil Dumping
M/s M S Infra 24-Jan-2020 124+600.0 124+750.0 150.0 1,800.000 Soil Dumping
M/s M S Infra 24-Jan-2020 132+700.0 132+840.0 140.0 1,900.000 Soil Dumping
M/s M S Infra 24-Jan-2020 138+000.0 138+200.0 200.0 600.000 Soil Dumping
M/s Balajee 24-Jan-2020 125+060.0 125+200.0 140.0 1,200.000 Soil Dumping
M/s Balajee 24-Jan-2020 100+850.0 101+020.0 170.0 1,340.000 Soil Dumping
M/s Balajee 24-Jan-2020 101+400.0 101+550.0 150.0 1,340.000 Soil Dumping
M/s M S Infra 24-Jan-2020 146+000.0 146+230.0 230.0 1,150.000 Soil Dumping
M/s M S Infra 24-Jan-2020 146+350.0 146+590.0 240.0 1,800.000 Soil Dumping
M/s M S Infra 24-Jan-2020 146+620.0 147+000.0 380.0 3,135.000 Soil Dumping
M/s M S Infra 24-Jan-2020 147+000.0 147+400.0 400.0 3,300.000 Soil Dumping
M/s M S Infra 24-Jan-2020 147+400.0 147+800.0 400.0 3,300.000 Soil Dumping
M/s M S Infra 24-Jan-2020 147+800.0 148+150.0 350.0 2,887.000 Soil Dumping
M/s M S Infra 24-Jan-2020 148+170.0 148+300.0 130.0 1,072.000 Soil Dumping
M/s M S Infra 24-Jan-2020 148+300.0 148+600.0 300.0 2,475.000 Soil Dumping
M/s M S Infra 24-Jan-2020 148+600.0 148+980.0 380.0 3,135.000 Soil Dumping
M/s Balajee 25-Jan-2020 102+300.0 102+300.0 0.0 1,638.750 Soil Dumping
M/s Balajee 25-Jan-2020 132+840.0 132+890.0 50.0 1,638.750 Soil Dumping
M/s Balajee 25-Jan-2020 131+630.0 132+800.0 1170.0 1,638.750 Soil Dumping
M/s Balajee 25-Jan-2020 137+950.0 138+000.0 50.0 1,638.750 Soil Dumping
M/s Balajee 25-Jan-2020 131+500.0 131+700.0 200.0 1,638.750 Soil Dumping
M/s Balajee 25-Jan-2020 125+300.0 125+420.0 120.0 1,638.750 Soil Dumping
M/s Balajee 25-Jan-2020 125+560.0 125+600.0 40.0 1,638.750 Soil Dumping
M/s Balajee 25-Jan-2020 124+900.0 125+000.0 100.0 1,638.750 Soil Dumping
M/s M S Infra 25-Jan-2020 148+430.0 148+700.0 270.0 1,310.000 Soil Dumping
M/s Balajee 26-Jan-2020 131+000.0 131+450.0 450.0 1,850.000 Soil Dumping
M/s Balajee 26-Jan-2020 130+000.0 138+200.0 8200.0 1,850.000 Soil Dumping
M/s Balajee 26-Jan-2020 124+750.0 124+900.0 150.0 1,850.000 Soil Dumping
M/s Balajee 26-Jan-2020 100+200.0 100+250.0 50.0 1,850.000 Soil Dumping
M/s Balajee 26-Jan-2020 101+850.0 101+950.0 100.0 1,850.000 Soil Dumping
M/s Balajee 26-Jan-2020 102+500.0 102+850.0 350.0 1,850.000 Soil Dumping
M/s M S Infra 26-Jan-2020 146+430.0 146+560.0 130.0 600.000 Soil Dumping
M/s M S Infra 26-Jan-2020 146+600.0 146+850.0 250.0 750.000 Soil Dumping
M/s M S Infra 26-Jan-2020 147+900.0 148+150.0 250.0 400.000 Soil Dumping
M/s M S Infra 26-Jan-2020 148+170.0 148+430.0 260.0 900.000 Soil Dumping
M/s Balajee 27-Jan-2020 131+000.0 131+100.0 100.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 132+850.0 132+950.0 100.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 138+000.0 138+200.0 200.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 129+180.0 129+250.0 70.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 130+840.0 130+900.0 60.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 130+940.0 131+050.0 110.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 125+600.0 125+850.0 250.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 101+850.0 101+950.0 100.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 102+850.0 102+970.0 120.0 1,205.000 Soil Dumping
M/s Balajee 27-Jan-2020 102+990.0 103+020.0 30.0 1,205.000 Soil Dumping
M/s M S Infra 27-Jan-2020 146+350.0 146+430.0 80.0 400.000 Soil Dumping
M/s M S Infra 27-Jan-2020 146+560.0 146+600.0 40.0 400.000 Soil Dumping
M/s M S Infra 27-Jan-2020 146+440.0 146+560.0 120.0 500.000 Soil Dumping
M/s M S Infra 27-Jan-2020 147+800.0 147+900.0 100.0 350.000 Soil Dumping
M/s M S Infra 27-Jan-2020 147+580.0 148+150.0 570.0 750.000 Soil Dumping
M/s M S Infra 27-Jan-2020 145+830.0 145+900.0 70.0 750.000 Soil Dumping
Remarks