You are on page 1of 42

S.No. Project Registration No.

1 TN/29/Building/0001/2021 dated 04/01/2021


2 TN/01/Building/0002/2021 dated 04/01/2021
3 TN/29/Building/0003/2021 dated 04/01/2021(This Re
4 TN/29/Building/0004/2021 dated 05/01/2021
5 TN/25/Layout/0001/2021 dated 08/01/2021
6 TN/14/Building/0005/2021 dated 11/01/2021
7 TN/14/Building/0006/2021 dated 11/01/2021
8 TN/01/Building/0007/2021 dated 11/01/2021
9 TN/11/Building/0008/2021 dated 11/01/2021
10 TN/16/Building/0009/2021 dated 12/01/2021
11 TN/01/Building/0010/2021 dated 11/01/2021
12 TN/26/Building/0011/2021 dated 11/01/2021
13 TN/01/Building/0012/2021 dated 11/01/2021
14 TN/18/Layout/0002/2021 dated 11/01/2021
15 TN/02/Layout/0003/2021 dated 12/01/2021
16 TN/02/Layout/0004/2021 dated 11/01/2021
17 TN/01/Layout/0005/2021 dated 11/01/2021
18 TN/20/Layout/0006/2021 dated 12/01/2021
19 TN/11/Layout/0007/2021 dated 11/01/2021
20 TN/28/Layout/0008/2021 dated 12/01/2021
21 TN/07/Building/0013/2021 dated 20/01/2021
22 TN/19/Building/0014/2021 dated 19/01/2021
23 TN/29/Building/0015/2021 dated 19/01/2021
24 TN/29/Building/0016/2021 dated 19/01/2021
25 TN/11/Building/0017/2021 dated 21/01/2021
26 TN/29/Building/0018/2021 dated 21/01/2021
27 TN/01/Building/0019/2021 dated 21/01/2021
28 TN/29/Building/0020/2021 dated 21/01/2021
29 TN/01/Building/0021/2021 dated 21/01/2021
30 TN/29/Layout/0009/2021 dated 21/01/2021
31 TN/01/Layout/0010/2021 dated 20/01/2021
32 TN/01/Layout/0011/2021 dated 21/01/2021
33 TN/02/Layout/0012/2021 dated 20/01/2021
34 TN/09/Layout/0013/2021 dated 21/01/2021
35 TN/32/Layout/0014/2021 dated 21/01/2021
36 TN/16/Layout/0015/2021 dated 21/01/2021
37 TN/02/Layout/0016/2021 dated 22/01/2021
38 TN/29/Building/0022/2021 dated 25/01/2021
39 TN/01/Layout/0017/2021 dated 25/01/2021
40 TN/29/Layout/0018/2021 dated 25/01/2021
41 TN/29/Building/0023/2021 dated 27/01/2021
42 TN/02/Building/0024/2021 dated 28/01/2021
43 TN/29/Building/0025/2021 dated 27/01/2021
44 TN/29/Building/0026/2021 dated 29/01/2021
45 TN/02/Building/0027/2021 dated 29/01/2021
46 TN/11/Building/0028/2021 dated 29/01/2021
47 TN/13/Building/0029/2021 dated 29/01/2021
48 TN/01/Building/0030/2021 dated 29/01/2021
49 TN/28/Layout/0019/2021 dated 05/02/2021
50 TN/29/Layout/0020/2021 dated 29/01/2021
51 TN/29/Layout/0021/2021 dated 29/01/2021
52 TN/02/Layout/0022/2021 dated 29/01/2021
53 TN/27/Layout/0023/2021 dated 29/01/2021
54 TN/20/Layout/0024/2021 dated 29/01/2021
55 TN/20/Layout/0025/2021 dated 29/01/2021
56 TN/19/Building/0031/2021 dated 01/02/2021
57 TN/29/Building/0032/2021 dated 01/02/2021
58 TN/10/Building/0033/2021 dated 01/02/2021
59 TN/13/Building/0034/2021 dated 01/02/2021
60 TN/29/Building/0035/2021 dated 08/02/2021
61 TN/02/Building/0036/2021 dated 05/02/2021
62 TN/14/Building/0037/2021 dated 08/02/2021
63 TN/29/Building/0038/2021 dated 08/02/2021
64 TN/09/Layout/0026/2021 dated 08/02/2021
65 TN/18/Layout/0027/2021 dated 08/02/2021
66 TN/02/Layout/0028/2021 dated 08/02/2021
67 TN/29/Building/0039/2021 dated 09/02/2021
68 TN/29/Building/0040/2021 dated 09/02/2021
69 TN/29/Building/0041/2021 dated 09/02/2021
70 TN/16/Building/0042/2021 dated 09/02/2021
71 TN/02/Building/0043/2021 dated 09/02/2021
72 TN/29/Building/0044/2021 dated 09/02/2021
73 TN/02/Layout/0029/2021 dated 09/02/2021
74 TN/30/Layout/0030/2021 dated 09/02/2021
75 TN/02/Layout/0031/2021 dated 09/02/2021
76 TN/17/Layout/0032/2021 dated 09/02/2021
77 TN/01/Layout/0033/2021 dated 09/02/2021
78 TN/28/Layout/0034/2021 dated 09/02/2021
79 TN/30/Layout/0035/2021 dated 09/02/2021
80 TN/02/Layout/0036/2021 dated 09/02/2021
81 TN/01/Building/0045/2021 dated 10/02/2021
82 TN/01/Building/0046/2021 dated 10/02/2021
83 TN/20/Building/0047/2021 dated 12/02/2021
84 TN/02/Building/0048/2021 dated 12/02/2021
85 TN/29/Building/0049/2021 dated 12/02/2021
86 TN/25/Layout/0037/2021 dated 12/02/2021
87 TN/02/Building/0050/2021 dated 15/02/2021
88 TN/01/Building/0051/2021 dated 15/02/2021
89 TN/02/Layout/0038/2021 dated 15/02/2021
90 TN/29/Building/0052/2021 dated 16/02/2021
91 TN/01/Building/0053/2021 dated 22/02/2021
92 TN/01/Building/0054/2021 dated 16/02/2021
93 TN/29/Building/0055/2021 dated 16/02/2021
94 TN/20/Building/0056/2021 dated 16/02/2021
95 TN/29/Building/0057/2021 dated 16/02/2021
96 TN/02/Layout/0039/2021 dated 16/02/2021
97 TN/01/Layout/0040/2021 dated 16/02/2021
98 TN/10/Layout/0041/2021 dated 16/02/2021
99 TN/32/Layout/0042/2021 dated 16/02/2021
100 TN/01/Layout/0043/2021 dated 16/02/2021
101 TN/01/Building/0058/2021 dated 17/02/2021
102 TN/01/Building/0059/2021 dated 17/02/2021
103 TN/25/Layout/0044/2021 dated 17/02/2021
104 TN/22/Layout/0045/2021 dated 17/02/2021
105 TN/11/Building/0060/2021 dated 22/02/2021
106 TN/02/Building/0061/2021 dated 22/02/2021(This Re
107 TN/29/Building/0062/2021 dated 22/02/2021
108 TN/30/Building/0063/2021 dated 22/02/2021
109 TN/02/Layout/0046/2021 dated 22/02/2021
110 TN/02/Layout/0047/2021 dated 22/02/2021
111 TN/01/Layout/0048/2021 dated 23/02/2021
112 TN/01/Building/0064/2021 dated 24/02/2021
113 TN/29/Layout/0049/2021 dated 24/02/2021
114 TN/01/Layout/0050/2021 dated 24/02/2021
115 TN/01/Layout/0051/2021 dated 24/02/2021
116 TN/02/Layout/0052/2021 dated 25/02/2021
117 TN/29/Building/0065/2021 dated 26/02/2021
118 TN/11/Building/0066/2021 dated 27/02/2021
119 TN/11/Building/0067/2021 dated 26/02/2021
120 TN/29/Building/0068/2021 dated 26/02/2021
121 TN/07/Building/0069/2021 dated 26/02/2021
122 TN/01/Layout/0053/2021 dated 26/02/2021
123 TN/01/Layout/0054/2021 dated 26/02/2021
124 TN/07/Building/0070/2021 dated 27/02/2021
125 TN/29/Building/0071/2021 dated 27/02/2021
126 TN/16/Building/0072/2021 dated 27/02/2021
127 TN/29/Building/0073/2021 dated 27/02/2021
128 TN/01/Building/0074/2021 dated 27/02/2021
129 TN/29/Building/0075/2021 dated 27/02/2021
130 TN/26/Layout/0055/2021 dated 27/02/2021
131 TN/01/Layout/0056/2021 dated 27/02/2021
132 TN/01/Layout/0057/2021 dated 27/02/2021
133 TN/13/Layout/0058/2021 dated 27/02/2021
134 TN/20/Layout/0059/2021 dated 27/02/2021
135 TN/04/Layout/0060/2021 dated 01/03/2021
136 TN/01/Layout/0061/2021 dated 01/03/2021
137 TN/11/Building/0076/2021 dated 02/03/2021
138 TN/01/Building/0077/2021 dated 02/03/2021
139 TN/01/Building/0078/2021 dated 02/03/2021
140 TN/02/Layout/0062/2021 dated 02/03/2021
141 TN/29/Layout/0063/2021 dated 03/03/2021
142 TN/29/Building/0079/2021 dated 04/03/2021
143 TN/29/Layout/0064/2021 dated 04/03/2021
144 TN/21/Building/0080/2021 dated 08/03/2021
145 TN/28/Layout/0065/2021 dated 08/03/2021
146 TN/04/Layout/0066/2021 dated 08/03/2021
147 TN/11/Layout/0067/2021 dated 08/03/2021
148 TN/25/Layout/0068/2021 dated 08/03/2021
149 TN/20/Layout/0069/2021 dated 08/03/2021
150 TN/02/Layout/0070/2021 dated 08/03/2021
151 TN/02/Building/0081/2021 dated 11/03/2021
152 TN/01/Layout/0071/2021 dated 11/03/2021
153 TN/20/Layout/0072/2021 dated 11/03/2021
154 TN/07/Building/0082/2021 dated 12/03/2021
155 TN/20/Layout/0073/2021 dated 12/03/2021
156 TN/29/Building/0083/2021 dated 15/03/2021
157 TN/23/Layout/0074/2021 dated 15/03/2021
158 TN/30/Layout/0075/2021 dated 16/03/2021
159 TN/01/Layout/0076/2021 dated 15/03/2021
160 TN/29/Building/0084/2021 dated 16/03/2021
161 TN/02/Building/0085/2021 dated 16/03/2021
162 TN/13/Building/0086/2021 dated 16/03/2021
163 TN/02/Layout/0077/2021 dated 16/03/2021
164 TN/01/Layout/0078/2021 dated 16/03/2021
165 TN/01/Layout/0079/2021 dated 16/03/2021
166 TN/02/Layout/0080/2021 dated 16/03/2021
167 TN/02/Building/0087/2021 dated 17/03/2021
168 TN/02/Layout/0081/2021 dated 17/03/2021
169 TN/02/Layout/0082/2021 dated 17/03/2021
170 TN/10/Layout/0083/2021 dated 17/03/2021
171 TN/10/Layout/0084/2021 dated 17/03/2021
172 TN/02/Layout/0085/2021 dated 22/03/2021
173 TN/02/Layout/0086/2021 dated 23/03/2021
174 TN/22/Building/0088/2021 dated 26/03/2021
175 TN/29/Building/0089/2021 dated 29/03/2021
176 TN/11/Building/0090/2021 dated 29/03/2021
177 TN/29/Building/0091/2021 dated 29/03/2021
178 TN/29/Building/0092/2021 dated 29/03/2021
179 TN/29/Building/0093/2021 dated 29/03/2021
180 TN/29/Building/0094/2021 dated 29/03/2021(This Re
181 TN/05/Building/0095/2021 dated 29/03/2021
182 TN/02/Layout/0087/2021 dated 29/03/2021
183 TN/20/Layout/0088/2021 dated 29/03/2021
184 TN/01/Layout/0089/2021 dated 29/03/2021
185 TN/30/Layout/0090/2021 dated 29/03/2021
186 TN/29/Building/0096/2021 dated 30/03/2021
187 TN/02/Layout/0091/2021 dated 30/03/2021
188 TN/02/Layout/0092/2021 dated 30/03/2021
189 TN/29/Layout/0093/2021 dated 30/03/2021
190 TN/11/Building/0097/2021 dated 01/04/2021
191 TN/21/Building/0098/2021 dated 01/04/2021
192 TN/01/Building/0099/2021 dated 01/04/2021
193 TN/11/Building/0100/2021 dated 01/04/2021
194 TN/01/Building/0101/2021 dated 01/04/2021
195 TN/13/Building/0102/2021 dated 01/04/2021
196 TN/08/Building/0103/2021 dated 01/04/2021
197 TN/29/Layout/0094/2021 dated 01/04/2021
198 TN/17/Layout/0095/2021 dated 01/04/2021
199 TN/17/Layout/0096/2021 dated 01/04/2021
200 TN/16/Building/0104/2021 dated 05/04/2021
201 TN/26/Layout/0097/2021 dated 05/04/2021
202 TN/01/Building/0105/2021 dated 07/04/2021
203 TN/01/Building/0106/2021 dated 07/04/2021
204 TN/01/Building/0107/2021 dated 07/04/2021
205 TN/13/Layout/0098/2021 dated 08/04/2021
206 TN/29/Building/0108/2021 dated 09/04/2021
207 TN/10/Building/0109/2021 dated 09/04/2021
208 TN/09/Layout/0099/2021 dated 09/04/2021
209 TN/11/Building/0110/2021 dated 12/04/2021
210 TN/01/Building/0111/2021 dated 12/04/2021
211 TN/29/Building/0112/2021 dated 12/04/2021
212 TN/29/Building/0113/2021 dated 12/04/2021
213 TN/01/Layout/0100/2021 dated 12/04/2021
214 TN/01/Layout/0101/2021 dated 12/04/2021
215 TN/08/Layout/0102/2021 dated 12/04/2021
216 TN/02/Layout/0103/2021 dated 12/04/2021
217 TN/17/Layout/0104/2021 dated 12/04/2021
218 TN/02/Layout/0105/2021 dated 15/04/2021
219 TN/01/Layout/0106/2021 dated 15/04/2021
220 TN/01/Building/0114/2021 dated 16/04/2021(This Re
221 TN/32/Layout/0107/2021 dated 17/04/2021
222 TN/11/Layout/0108/2021 dated 16/04/2021
223 TN/29/Building/0115/2021 dated 19/04/2021
224 TN/02/Building/0116/2021 dated 19/04/2021
225 TN/29/Building/0117/2021 dated 19/04/2021
226 TN/29/Building/0118/2021 dated 19/04/2021
227 TN/29/Building/0119/2021 dated 19/04/2021
228 TN/29/Building/0120/2021 dated 19/04/2021
229 TN/29/Building/0121/2021 dated 19/04/2021
230 TN/02/Layout/0109/2021 dated 19/04/2021
231 TN/01/Layout/0110/2021 dated 19/04/2021
232 TN/11/Layout/0111/2021 dated 19/04/2021
233 TN/11/Layout/0112/2021 dated 19/04/2021
234 TN/29/Building/0122/2021 dated 21/04/2021
235 TN/29/Building/0123/2021 dated 21/04/2021
236 TN/07/Building/0124/2021 dated 21/04/2021
237 TN/29/Building/0125/2021 dated 21/04/2021
238 TN/29/Building/0126/2021 dated 21/04/2021
239 TN/13/Layout/0113/2021 dated 21/04/2021
240 TN/02/Layout/0114/2021 dated 21/04/2021
241 TN/01/Layout/0115/2021 dated 21/04/2021
242 TN/32/Layout/0116/2021 dated 21/04/2021
243 TN/01/Layout/0117/2021 dated 21/04/2021
244 TN/01/Layout/0118/2021 dated 19/04/2021
245 TN/02/Layout/0119/2021 dated 21/04/2021
246 TN/01/Layout/0120/2021 dated 21/04/2021
247 TN/01/Layout/0121/2021 dated 21/04/2021
248 TN/32/Layout/0122/2021 dated 21/04/2021
249 TN/01/Layout/0123/2021 dated 21/04/2021
250 TN/01/Layout/0124/2021 dated 21/04/2021
251 TN/29/Layout/0125/2021 dated 21/04/2021
252 TN/32/Layout/0126/2021 dated 21/04/2021
253 TN/05/Building/0127/2021 dated 22/04/2021
254 TN/29/Building/0128/2021 dated 22/04/2021
255 TN/01/Building/0129/2021 dated 22/04/2021
256 TN/11/Building/0130/2021 dated 22/04/2021
257 TN/11/Layout/0127/2021 dated 22/04/2021
258 TN/08/Layout/0128/2021 dated 22/04/2021
259 TN/01/Layout/0129/2021 dated 22/04/2021
260 TN/02/Layout/0130/2021 dated 22/04/2021
261 TN/01/Layout/0131/2021 dated 21/04/2021
262 TN/26/Layout/0132/2021 dated 21/04/2021
263 TN/02/Layout/0133/2021 dated 22/04/2021
264 TN/28/Layout/0134/2021 dated 22/04/2021
265 TN/11/Layout/0135/2021 dated 22/04/2021
266 TN/01/Layout/0136/2021 dated 22/04/2021
267 TN/29/Building/0131/2021 dated 23/04/2021
268 TN/02/Layout/0137/2021 dated 23/04/2021
269 TN/01/Building/0132/2021 dated 26/04/2021
270 TN/29/Building/0133/2021 dated 26/04/2021
271 TN/29/Building/0134/2021 dated 26/04/2021
272 TN/29/Building/0135/2021 dated 27/04/2021
273 TN/10/Building/0136/2021 dated 26/04/2021
274 TN/02/Layout/0138/2021 dated 26/04/2021
275 TN/01/Layout/0139/2021 dated 26/04/2021
276 TN/28/Layout/0140/2021 dated 26/04/2021
277 TN/02/Layout/0141/2021 dated 27/04/2021
278 TN/01/Layout/0142/2021 dated 27/04/2021
279 TN/01/Layout/0143/2021 dated 27/04/2021
Name and Address of the Promoter
M/s. Perungudi Real Estates Pvt. Ltd., No.5/142, Rajiv Gandhi Salai (OMR), Perungudi, Chennai – 600096.
1) Thiru. R.K.Shyam Sundar, Director, M/s. H4A Projects Pvt. Ltd., No.27, Pycrofts Garden Road, Flat No.3A, Vijay Shanti Cou
M/s. P.R.Constructions, No.2, Sengarajulu Street, Arunachalam Road, Saligramam, Chennai – 600093.
M/s. Minerva Housing, No.22-A, Vellalar Street, Near Gandhi Road, Velachery, Chennai – 600042.
Thiru. M.Subramanian, No.03/124, Piranmalai, Sivaganga – 630502.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Cuddalore Divison, No.11, River side Street, Pudupalayam, Cuddal
The Executive Engineer, Tamil Nadu Slum Clearance Board, Cuddalore Divison, No.11, River side Street, Pudupalayam, Cuddal
M/s. Livedge Constructions, No.11, Narsingh Market, Ekambareshwarar Agraharam Street, Sowcarpet, Chennai - 600003.
M/s. Lumbodhara Real Estate, Orchid Towers 3rd Floor, No.370, Alagesan Road, Saibaba Colony, Coimbatore - 641011.
1) M/s. Navaneetha Investments, First Floor, Seven Hills Tower, Karur By Pass Road, Annamalai Nagar, Trichy – 620018 and 2)
M/s. Adroit Urban Developers Pvt. Ltd., No.1, Bheemanna Garden Street, Alwarpet, Chennai - 600018.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Tirunelveli Division, NGO “B” Colony Extension, Perumalpuram, Ti
1) M/s. Bharathi Homes and Realtors Pvt. Ltd., 2) M/s. Sameera Foundations Pvt. Ltd., and 3) Tmt. Sumitha, No.37/9, Hariram
Thiru. M.Natesan, GPA of Thiru. N.Saravanan & Tmt. S.Vijayalakshmi, No.3/358, Kuppam Road, Kottivakkam, Chennai – 60004
M/s. Urban Tree Housing Projects LLP, 'Suraj Kunj’, No.18 (Old No.8B), Rutland Gate, 5th Street, Nungambakkam, Chennai - 6
Tmt. V.Jayasri, Fo-1, Pace Sunshine Park, 11th Street Extension, ‘Z’ Block, Anna Nagar, Chennai – 600040.
M/s. Vigneshwara Homes Pvt. Ltd., 15/33, Cenotaph 1st Street, Teynampet, Chennai - 600018.
Tmt. S.Ramuthai, No.17, M.G.R. Street, Poonthamalli Nagar, Chellur, Madurai - 625002.
M/s. IVA Infrastructure, No.78-IVA-Agam, Vazhiyampalayam, Kalapatti, Coimbatore – 641048.
Thiru. R.Lingarajan, No.88, Kalai Nagar, Kottar P.O, Nagercoil – 629002.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Salem Division, No.3/2, Narayanasamy Street, Peramanur, Salem
The Executive Engineer, Tamil Nadu Slum Clearance Board, Trichy Division, Madurai Road, Palakkarai, Trichy – 620008.
The Executive Engineer & ADO, Tamil Nadu Housing Board, K.K. Nagar Division, C-48, 3rd Floor, TNHB Office Complex, 2nd Av
M/s. Trisquare Properties Pvt. Ltd., No.27, H-Block, 1st Main Road, Anna Nagar East, Chennai - 600102.
M/s. Dhiya Foundation Pvt. Ltd., 22/1, PRR Nagar, 3rd Cross, P.N. Pudur, Coimbatore - 641041.
M/s. BRIGADE ENTERPRISES LTD., No.110, Rajiv Gandhi Salai (OMR), Thiruvanmiyur, Chennai – 600041.
1) Tmt. C.Nagalakshmi and 2) M/s. Shirdi Shelters Whitefield Pvt. Ltd., No.8/114, 2nd Floor, Trisul Flats, Old Trunk Road, Palla
M/s. Arham Builders Pvt. Ltd., Flat No.1C, Crystal Lawn, 20, Haddows Road First Street, Nungambakkam, Chennai – 600006.
1) Tmt. Prathiba Mardia and 2) Thiru. Pritish Mardia, Proprietor, M/s. SPP Realty, No.26, Mooker Nalla Muthu Street, Parrys, C
1) Tmt. K.Geetha and 2) Tmt. B.K.Jeevitha, No.3/249, Krishna Enclave, Manampakkam, Chennai – 600125.
Tvl. S.Jaganathan & Kanniyammal Seenivasan, No.3/277, Etthiyamman Kovil Street, Ettiyapuram, Naduveerapattu, Kancheepu
Thiru. N.Balasubramaniam, 59A, Chitrahar Nagar, Gandhi Nagar, Tiruppur - 641602.
M/s. VGN Homes Pvt. Ltd., No.333, Poonamallee High Road, Amaindakarai, Chennai - 600029.
Thiru. R.Sivasakthivel, No.32, Thaneer Pandal Road, Peelamedu, Coimbatore - 641004.
M/s. Merestone Properties Pvt. Ltd., No.3/8A, KPG Garden, Near Siruvani Tank, Trichy Road, Sulur, Coimbatore – 641402.
Thiru. M.Raveendhiren, Plot No.11 & 12, A.R. Apartment, Malai Kovil Near, Thiruverumbur, Trichy - 620013.
Tmt. Jayasri, Fo-1, Pace Sunshine Park, 11th Street Extension, Z-Block, Anna Nagar, Chennai – 600040.
M/s. Rainbow Foundations Ltd., & M/s. CC Elevation, No.04, Thanikachalam Road, T.Nagar, Chennai – 600017.
M/s. Ocean Dream Spaces Private Limited, MF-1, Industrial Estate, CIPET Hostel Road, Guindy, Chennai - 600032.
M/s. VGN Homes Pvt. Ltd., No.333, Poonamallee High Road, Amaindakarai, Chennai - 600029.
Thiru. S.Narayanan and M/s. Guru Foundations, No.21, 2nd Main Road, Nanganallur, Chennai - 600061.
M/s. VGN Enterprises Pvt. Ltd., No.333, Poonamallee High Road, Amaindakarai, Chennai - 600029.
M/s. Etica Developers Pvt. Ltd., No.24, Exotica 6th Floor, Venkatnarayana Road, T.Nagar, Chennai – 600017.
1) Thiru. J.Venkatesh (Owner) and 2) M/s. Xs Real Properties Pvt. Ltd., (Promoter), No.12, South Mada Street, Sri Nagar Colon
Thiru. K.Arumugam, No.87/42, Apparswamy Kovil Street, Mylapore, Chennai – 600004.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Coimbatore Division, No.397A, North Housing Unit, Selvapuram N
The Executive Engineer, Tamil Nadu Slum Clearance Board, Trichy Division, Madurai Road, Palakkarai, Trichy – 620008.
M/s. Burlingame LLP, No.13, Customs Colony Main Road, Thoraipakkam, Chennai - 600097.
Thiru. S.Arulmurugan, No.2/22/62, Marutham Street, Samathuvapuram, Lakshmipuram, Vellamadam Post, Kanyakumari Distr
M/s. Adityaram Properties Pvt. Ltd., No.50, Adityaram Nagar, Panayur East Coast Road, Chennai – 600119.
M/s. Adityaram Properties Pvt. Ltd., & Tmt. P.Amani Adityaram (Owner & GPA for Tmt. Kumari), No.50, Adityaram Nagar, Pan
Tvl. G.Sampath & R.Venkatesan, New No.66, Perumal Kovil Street, Alapakkam, Chennai – 600116.
Tmt. R.Meena, Plot No.71, 2nd Avenue, Seashore Town, Panaiyur, East Coast Road, Chennai – 600119.
Thiru. S.Raja, Door No.132/E1 SSS Manicka Nagar, Pulallakottai Road, Virudhunagar – 626001.
Tvl. M.Elamaran & S.Saravan Kumar, Plot No.586, Karpaga Nagar, 12th Street, K-Pudur, Madurai – 625007.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Trichy Division, Madurai Road, Palakkarai, Trichy – 620008.
M/s. Emerald Haven Town and Country Private Limited, First Floor, Greenways Towers, No.119, St. Mary’s Road, Abhiramapu
The Executive Engineer & ADO, Tamil Nadu Housing Board, Erode Housing Unit, Sampath Nagar, Collectorate Post, Erode - 63
The Executive Engineer, Tamil Nadu Slum Clearance Board, Trichy Division, Madurai Road, Palakkarai, Trichy – 620008.
1) Thiru. J.Raja Ananthan (Builder), 2) Thiru. K.Subramanian, 3) Tmt. Shanthi Subramanian, 4) Tmt. Usha Rani, 5) Thiru. K.Bala
M/s. Vijay Raja Homes Pvt. Ltd., Vijayaraja’s Apex, Plot No.22, 2nd Street, Kamaraj Nagar, Chemmancherry, Chennai – 600119
The Executive Engineer, Tamil Nadu Slum Clearance Board, Cuddalore Division, No.11, River Side Street, Pudupalayam, Cudda
M/s. Chaitanya Eastlyn, Banyan View, 3rd Floor, No.39, Karpagam Gardens, First Main Road, Adyar, Chennai – 600020.
Thiru. U.Somasekar Chelladurai, No.3-436-1, Adaggapadi, Dharmapuri Taluk, Dharmapuri – 636803.
Thiru. S.A.Arokia Doss and Tmt. A.Catherine Anita GPA for Thiru. S.A.Arokia Doss, No.93G–7G4, Chidambaram Nagar, Peramb
Thiru. A.Lakshmi Narayanan, No.59, Nehru Nagar, Villivakkam, Chennai – 600049.
M/s. Rampon Infratech Pvt. Ltd., No.51, Velachery Main Road, Velachery, Chennai – 600042.
1) M/s. Devi Flat Promoters Chennai Pvt. Ltd., (Promoter) and 2) Tmt. Amitha Suresh (Land Owner), No.234, Sivaprakasam Na
M/s. Life Style Housing & Infrastructure, Thiru. Vijay Kumar Gulecha (GPA Holder) for Tvl. Uthamchand Gulecha and 7 Others,
1) Thiru. S.Syed Ameenudeen (Land Owner) & 2) Thiru. Thamizhanban, Proprietor of M/s. Om Shakthi Construction, No.171/1
M/s. S&P Foundations Pvt. Ltd., CITI Towers, 4th Floor, Door No.07, 3rd Cross Street, Kasturibai Nagar, Adyar, Chennai – 6000
1) Thiru. K.Ravi (Owner), 2) Tmt. V.Devapriya (Owner) and 3) M/s. Vencer Projects (Builder), No.137/8, 3rd Floor, 2nd Avenue
Tmt. Sekar Lakshmi & M/s. Sri Lakshmi Homes Pvt. Ltd., No.28/16, Anna Street, Kallikuppam, Ambattur, Chennai – 600053.
M/s. AVS Villas, No.4/371/A1, Goodavari Complex, Moovendar Nagar, Bagalur Road, Hosur – 635109.
Tmt. Sekar Lakshmi, M/s. Sri Lakshmi Homes Pvt. Ltd., No.28/16, Anna Street, Kallikuppam, Ambattur, Chennai – 600053.
Tmt. R.Vasanthi, No.1/128/9, Ram Nagar North, Andankovil West, Manmangalam Taluk, Karur District.
1) Thiru. S.DEENADAYALAN & Tmt. D.NITHYA, No.1/162, OMR Thandalam Village, Thiruporur, Chengalpattu – 603110, 2) Thiru
Tvl. R.Lingarajan & Nageswari, No.88 (Old No.170), Amman Kovil Street, Kottar (Po), Nagercoil, Kanyakumari District - 629002
M/s. AVS Villas, No.4/371/A1, Goodavari Complex, Moovendar Nagar, Bagalur Road, Hosur – 635109.
Thiru. A.Balajee Kumar, No.59, Nehru Nagar, Villivakkam, Chennai – 600049.
M/s. Casagrand Builder Private Limited, Devi Apartments, 3rd Floor, New No.111, Old No.59, NPL, L.B.Road, Thiruvanmiyur, C
M/s. Isha Homes India Pvt. Ltd., Old No.74, New No.55, 1st Avenue, Indira Nagar, Adyar, Chennai – 600020.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Madurai Division, 169, K.K. Nagar Main Road, Madurai - 625020.
The Executive Engineer & ADO, Tamil Nadu Housing Board, J.J. Nagar Division, TNHB Office Complex, Thirumangalam, Chenna
The Executive Engineer & ADO, Tamil Nadu Housing Board, K.K. Nagar Division, C-48, 3rd Floor, TNHB Office Complex, 2nd Av
Thiru. A.Selvaraj, No.11, Bharathi Nagar, Kalanivasal, Karaikudi, Sivagangai District – 630002.
The Executive Engineer, Division-4, Tamil Nadu Slum Clearance Board, T.P.Chathram, Near K6 Police Station, Chennai – 60001
The Executive Engineer, Tamil Nadu Slum Clearance Board, Kancheepuram Division, No.17-20, Aranganathan Nagar, Ponnerik
Thiru. K.Rajavelu, No.10, 3rd Cross Street, Krishnapuram, Thiruninravur – 602024.
M/s. Ananya Krishnaa Constructions Pvt. Ltd., No.1225/1, Paneer Selvam Salai, K.K. Nagar, Chennai – 600078.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Kancheepuram Division, No.17-20, Aranganathan Nagar, Ponnerik
M/s. VGK Builders Pvt. Ltd., No.05, Indira Garden, Kamarajar Salai, Selaiyur, Chennai – 600059.
M/s. Maliban Estates, Ground Floor, No.118/813, Nizara Bonanza Building, Anna Salai, Chennai – 600002.
Thiru. J.Joseph Prabu, Proprietor, M/s. Cecily Homes, Plot No.7, Visuvasapuri 2nd Street, Madurai – 625016.
M/s. Chaitanya Foundations Pvt. Ltd., Banyan View, 3rd Floor, 39, Karpagam Gardens, First Main Road, Adyar, Chennai – 6000
Thiru. A.Lakshmi Narayanan, No.59, Nehru Nagar, Villivakkam, Chennai – 600049.
Thiru. A.V.Vinod Kumar Reddy, Baywatch Apartment, 4th Floor, No.92/33, Coastal Road, Besant Nagar, Chennai – 600090.
Tmt. S.Rajalakshmi, No.B–18-02, Taisha–West Natesan Nagar, Virugambakkam, Chennai – 600092.
Thiru. J.Sasi Kumar, Old No.5/29, New No.72, Chithambalam Road, P.Vadugapalayam, Palladam Taluk, Tiruppur District – 641
M/s. New Look Promoters, No.38/1, Sarojini Street, T.Nagar, Chennai – 600017.
1) M/s. AAKASH DEVELOPERS, Plot No.3362 AQ, Block-AF, 8th Street, Anna Nagar, Chennai – 600040 and 2) Thiru. G.VEEMAR
1) Tvl. Dr.N.Muthukumar & Dr.S.Umabharathi, Sisu Hospital India Ltd., No.3/303, Kandhampatty Bye-Pass, Suramangalam, Sa
Thiru. A.Jeganathan, No.4/8, Malligai Street, Soodamanipuram, Karaikudi – 630003.
1) Thiru. G.SIVAKUMAR, No.17-2-102D/11, Rajan Nagar, Kanavaipatti Road, Batlagundu, Dindigul – 624202 and 2) Thiru. M.V
The Executive Engineer, Tamil Nadu Slum Clearance Board, Coimbatore Division, No.397-A, North Housing Unit, Selvapuram N
The Executive Engineer, Tamil Nadu Slum Clearance Board, Re-construction Division, T.P. Chatram, Chennai – 600010.
The Executive Engineer & ADO, Tamil Nadu Housing Board, Besant Nagar Division, No.48, Dr. Muthulakshmi Salai, Adyar, Che
The Executive Engineer, Tamil Nadu Slum Clearance Board, Vellore Division, No.22, 9th Street, Gopalapuram, Kazhinjur, Vello
M/s. Sri Lakshmi Homes Pvt. Ltd., No.28/16, Anna Street, Kallikuppam, Ambattur, Chennai – 600053.
M/s. Sri Lakshmi Homes Pvt. Ltd., No.28/16, Anna Street, Kallikuppam, Ambattur, Chennai – 600053.
Thiru. L.Sundaram, No.319, Kulakarai Street, henkazhani, Asanamapattai Post, Thiruvannamalai – 604402.
M/s. Casa Grande Milestone Private Limited, 5th Floor, New No.111, Old No.59, NPL Devi, L.B. Road, Thiruvanmiyur, Chennai
Thiru. P.Adityaram & Tmt. P.Amani Adityaram, M/s. Adityaram Properties (P) Ltd., No.50, East Coast Road, Panayur, Adithyara
Miss. K.Abinaya (Proprietrix), M/s. Abinaya Life Space, No.03, City Center Plaza, 5th Floor, Mount Road, Anna Salai, Chennai –
Tvl. A.P.Oree & A.P.Nambi, 34, Anakara Apartments, 13 Gilchrist Avenue, Harrington Road, Chetpet, Chennai – 600031.
Tmt. K.Santhi, New No.5, Old No.3, Gokulan Street, Govarthanagiri, Chennai – 600071.
1) M/s. Baker Infrastructure Pvt. Ltd., (Promoter) & 7 Owners Namely: Tvl. 2) T. Natarajan, 3) S. Ganesh, 4) K. Suresh, 5) S.
Tmt. R.Suganthamani, M/s. SRD Promoters, No.95, Sesha Nilayam, Race Course Road, Coimbatore – 641018.
M/s. Tanny Shelters Pvt. Ltd., Old No.42, New No.64, Ramalinga Nagar, Alegesan Road No.2, Coimbatore – 641011.
M/s. Sree Guru Foundations Pvt. Ltd., Plot No.1961-A, 3rd Street, J-Block, Anna Nagar, Chennai – 600040.
M/s. Gurudev, 2nd Cross, 3/7, 1st Floor, Buddhar Street, Thiruvagoundanoor, Salem – 636005.
M/s. Radiance Realty Developers India Ltd., No.480, Anna Salai, Khivraj Complex–II, 6th Floor, Nandanam, Chennai – 600035.
1) M/s. Mohis Infrastructure Pvt. Ltd., and 2) Thiru. R.Mohindar, No.46/2, Sundaram Colony, 2nd Main Road, Camp Road, Sela
1) M/s. Rank Construction, No.36A, Venkatesapuram Extension, Vincent, Salem – 636007 and 2) Tmt. Gowri Bhuvaneswari, W
M/s. Jayaswathy Constructions Pvt. Ltd., No.35, Vegavathy Street, Rajaji Nagar Extension, Villivakkam, Chennai – 600049.
M/s. TMT Infra Developers Pvt. Ltd., No.10/D2, Radha Krishna Colony, 5th Cross, Sasthri Road, Tennur, Trichy – 620008.
Thiru. Bharath Kumar Venkatesan, Thiru. Mukesh Kumar Jain, Partners of M/s. Urbando Developers LLP, T-1, 3rd Floor, Chona
Thiru. P.Nimesh Shah (Proprietor), M/s. Shah Realtors, VLJ Avenue, Villa No.B3, No.10, Ragavendra Street Extension, Perugala
The Executive Engineer & ADO, Tamil Nadu Housing Board, Anna Nagar Division, Thirumangalam, Chennai - 600101.
Thiru. G.Mutharasu, No.169A, NGO Colony, Kalappakulam Village, Sankarankoil, Tenkasi District – 627756.
Thiru. C.Balakrishnan (GPA for Tmt. Susai Mary), No.2/51, Gandhi Street, Azhakesan Nagar, Nandambakkam, Chennai – 60006
1) M/s. Sivasankar Real Assets Pvt. Ltd., No.1/460, Mount Poonamallee Road, Ayyapanthangal, Chennai – 600056 and 2) Thiru
M/s. Shrisha Infra Pvt. Ltd., Plot No.1134, Door No.125, “Ramya”, 13th Main Road, Anna Nagar West, Chennai – 600040.
The Executive Engineer & ADO, Tamil Nadu Housing Board, Madurai Housing Unit, Ellis Nagar, Madurai – 625016.
Thiru. Thirumal & M/s. Emerald Village, Reg. Office at A-0, Rams Vennila Apartments, Ellapillaichavady, Puducherry – 605005.
M/s. MSGAJAA Properties Pvt. Ltd., Rep. by its Director Tmt. G.Saratha, No.9, Rajagopal Street, West Tambaram, Chennai – 60
1) Thiru. R.Narayanaswamy (Land Owner), 2) M/s. Nivasan Homes Pvt. Ltd., (GPA), No.252, Avinashi Road, Peelamedu, Coimb
M/s. S&P Foundations Pvt. Ltd., Rep. by its Managing Director Thiru. S.Prabakar, CITI Towers, 4th Floor, Door No.07, 3rd Cross
Thiru. P.Rajesh, Proprietor, M/s. Sudarasan Builders & Developers, No.111, First Floor, Sudarsan Towers, Vaishanva College R
Thiru. K.M.George, No.5, Jeyavillee Amirthanantha Mayee Street, Maruthiram Nagar Extension, Ayappakkam, Chennai – 6000
M/s. Adityaram Properties (P) Ltd., No.50, East Coast Road, Panayur, Adithyaram Nagar, Chennai – 600119.
The Executive Engineer & ADO, Tamil Nadu Housing Board, K.K. Nagar Division, C-48, 3rd Floor, TNHB Office Complex, 2nd Av
1) M/s. G.Square Realtors Pvt. Ltd., (GPA Holder), 2) M/s. Gem Granites (Owner), No.14, 3rd Floor, Harrington Apartments, 98
The Executive Engineer, Tamil Nadu Slum Clearance Board, Madurai Division, No.25, Thiruvalluvar Street, Managiri, K.K. Naga
Thiru. T.Suyambulingam, No.4/24A, South Puthalam, Puthalam Post, Kanyakumari District – 629602.
Tvl. T.Anoop Bora & Pallavarajha, S-38, Spencers Plaza, Phase–2, No.769, Anna Salai, Chennai – 600002.
1) Thiru. M.Gopalasamy, 2) Thiru. S.Sundarasami and 3) Thiru. K.Nagaraj, No.6/33, Sridevi Nagar, Pappampatti, Sulur, Coimba
1) Thiru. A.L.Periyakaruppan, 2) Tmt. Sivagami and 3) Thiru. Alagu Sundaram, Door No.44, Tamilthai Koil Salai, Thennarasu Str
The Executive Engineer & ADO, Tamil Nadu Housing Board, Madurai Housing Unit, Ellis Nagar, Madurai – 625016.
M/s. Sri Lakshmi Homes Pvt. Ltd., No.28/16, Anna Street, Kallikuppam, Ambattur, Chennai – 600053.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Re-Construction Division, T.P. Chatram, Chennai – 600010.
M/s. KTM Enterprise, No.109-A, Rajaji Street, Venkateswara Nagar, Kolathur, Chennai – 600099.
The Executive Engineer & ADO, Tamil Nadu Housing Board, Madurai Housing Unit, Ellis Nagar, Madurai – 625016.
The Executive Engineer, PIU II Division, Tamil Nadu Slum Clearance Board, No.3/2, Narayana Street, Peramanur, Salem – 6360
The Executive Engineer & ADO, Tamil Nadu Housing Board, Madurai Housing Unit, Ellis Nagar, Madurai – 625016.
1) M/s. Sreshta Sumanth Builders Pvt. Ltd., (Promoter) & 3 Owners Namely: 2) Tmt. S.D.Vaishnavi, 3) Miss. S.Sahana (Minor),
Tmt. E.M.Rabiyathul Basarial, W/o. Thiru Sheik Abdul Sunaith, No.24, Periyapallivasal North Street, Abiramam, Kamuthi Taluk
Thiru. H.M.Mohanbabu (Propreitor), M/s. Akshara Developer, No.56/1, PM Towers, Vaishnavi Nagar, 1st Cross, Hosur, Krishn
1) M/s. Vishranthi Homes Pvt. Ltd., (Developer) & 5 Owners Namely: Tvl. 2) Parvathy Mani, 3) Uma Mani, 4) Kala, 5) Mala and
1) Thiru. Somesh Chandiramani (Proprietor), M/s. Rams Builders and Developers (Developers), 2) Thiru. Vikram Chandiraman
M/s. GP Homes Pvt. Ltd., W-740, 1st Floor, 4th Avenue, Syndicate Bank Colony, Anna Nagar West Extn., Chennai – 600101.
M/s. Langval Infrastructure Pvt. Ltd., No.118, Ramco Garden, New Bus Stand Road, Thanjavur - 631005.
1) M/s. Ashwath Homes (GPA Holder) & 3 Owners Namely: Tvl. 2) S. Uma, 3) S. Hariharan and 4) S. Vignesh, No.122A, Chowdr
Thiru. M.Authad, No.11, F1, 1st Floor, 1st Street, Thirumoorthy Nagar, Chennai – 600034.
Thiru. S.Kabilan, No.91, Sambath Vinayagar Kovil Street, Meppur, Tiruvallur, Nazarethpettai – 600123.
Thiru. VR Builders, No.2/724A, Kazura Garden, 2nd Street, Neelankarai, Chennai - 600115.
M/s. GP Homes Pvt. Ltd., W-740, 1st Floor, 4th Avenue, Syndicate Bank Colony, Anna Nagar West Extn., Chennai – 600101 an
Thiru. A.Lakshmi Narayanan, No.59, Nehru Nagar, Villivakkam, Chennai – 600049.
M/s. Sri Lakshmi Homes Pvt. Ltd., No.28/16, Anna Street, Kallikuppam, Ambattur, Chennai – 600053.
Tvl. 1) G.D. Selvaraj, 2) M. Shanmugam and 3) T. Thiruvenkataswamy, No.10, Velumani Nagar, Gobichettipalayam – 638452.
1) Thiru. G.D.Selvaraj, No.10, Velumani Nagar, Gobichettipalayam – 638452, 2) Thiru. T.Thiruvenkataswamy, No.7-B, Ambigai
Tmt. Colleen Daniel, No.4, Railway Colony, 3rd Street, Aminjikarai, Chennai - 600029.
Thiru. T.Elango, No.3/4, Chitthirai Street, Chinmaya Nagar, Virugambakkam, Chennai – 600092.
M/s. Sankar Realtors, No.2-A, Anugraha Apartment, 40, Vivekananda Nagar, Dindigul – 624001.
Thiru. Rajkumar Chandak, B-736, Carat Akshaya, No.136/950, Poonamalle High Road, Chennai - 600084.
M/s. Ravimurugaa Construction Pvt. Ltd., No.8/1, Ganesh Kirubaa, Thirumangal Nagar, Peelamedu, Coimbatore – 641004.
1) M/s. Indu Housing Development Chennai Pvt. Ltd., (Developer) & 7 Owners Namely: Tvl. 2) V.T. Subramanian, 3) Fazle Ali K
M/s. Vaanam Construction and Development Pvt. Ltd., Old No.74, New No.129, Triplicane High Road, Triplicane, Chennai - 60
M/s. DRA Aadithya OMR Projects LLP, Khivraj Complex-II, No.480, First Floor, Anna Salai, Nandanam, Chennai- 600035.
M/s. Life Style Housing & Infrastructure, No.07A Halls Road, Egmore, Chennai – 600008.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Vellore Division, No.22, 9th Street, Gopalapuram, Kazhinjur, Vello
Thiru. A.Varadharajan, Puthupillaiyar Kovil Street, Mannurpettai, Padi, Chennai – 600050.
1) Thiru. V.Kallanai, Plot No.422, LIG Colony, Anna Nagar, Madurai – 625020, 2) Thiru. R.Ramesh, Door No.225, J/10, Arockiy
M/s. Radiance Realty Developers India Ltd., No.480, Anna Salai, Khivraj Complex–II, 6th Floor, Nandanam, Chennai – 600035.
Thiru. M.Subramaniyan, Plot No.91D, 2nd Cross Appavu Nagar, Hosur, Krishnagiri District – 635109.
M/s. Rohaan Constructions (P) Ltd., First Floor, Flat No.B, Door No.2/224A, Ragamalika Flats Phase-1, Ranjani Block, Velache
Thiru. N.N.Daniel, No.4, Railway Colony, 3rd Street, Aminjikarai, Chennai - 600029.
M/s. M.S.Land Promoters Pvt. Ltd., and Thiru. T.Ganesan, Director, No.554, 2nd Floor, Kundrathur Main Road, Kumananchava
1) M/s. G Square Realtors Pvt. Ltd., (GPA Holder) & 2) M/s. Gem Granites (Owner), No.14, 3rd Floor, Harrington Apartments, 9
M/s. Aavishkaar, No.01, Gandhi Layout, Maruthamalai Road, Vadavalli, Coimbatore – 641046.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Madurai Division, No.169, K.K. Nagar Main Road, Madurai – 62502
M/s. VNCT Global LLP, No.2, Sun Centre, First Floor, No.2, Tank Bund Road, Nungambakkam, Chennai – 600034.
M/s. Aavishkaar, No.01, Gandhi Layout, Maruthamalai Road, Vadavalli, Coimbatore – 641046.
M/s. Arun Excello Constructions LLP, Bhattad Towers, No.18, West Cott Road, Royapettah, Chennai – 600014.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Project Implementation Division-II, No.3/2, Narayanasamy Street,
The Executive Engineer, Tamil Nadu Slum Clearance Board, Project Implementation Division-II, No.3/2, Narayana Street, Pera
M/s. Pallavarajha Properties Pvt. Ltd., & Thiru. Hemanth Mehta, “Haven”, Plot No.21, 5th Radiant Avenue, VGP Layout, Injam
Thiru. R.Sekar, No.324, N.S.K. Nagar, Andan Kovil East Village, Manmangalam Taluk, Karur District - 639002.
Thiru. M.Ramasamy, N.S.K. Nagar, Andan Kovil East Village, Manmangalam Taluk, Karur District - 639002.
M/s. Royal Shelter, 2nd Floor, J.P.Tower, D27, 7th Cross (East), Thillainagar, Trichy – 620018.
Thiru. R.Anantha Krishnan, No.1, Varasanthai Street, Sankarankoil, Tirunelveli – 627756.
M/s. VGK Builders Pvt. Ltd., No.05, Indira Garden, Kamarajar Salai, Selaiyur, Chennai – 600059.
M/s. Akshaya Pvt. Ltd., GPA Holder for M/s. Bharath Promoters, G-Square, 4th Floor, No.46, Rajiv Gandhi Salai, Chennai – 600
1) M/s. Tamizh Constructions (P) Ltd., T4, Rana Block, Thathachariyar Garden, Mambala Salai, Srirangam, Trichy – 620005 and
Tmt. P.Malarvizhi, No.31, 3rd Street, Arulanandha Nagar, Thanjavur – 613007.
Thiru. K.K.Thirumalai, No.82/9, Ground Floor, Z-Block, 11th Street, Anna Nagar, Chennai – 600040.
Thiru. S.Kanagaraj, M/s. Shri Balaji Promoters, No.37/1, Annai Sathya Nagar, 7th Road, Palayapalayam, Erode District – 63801
Thiru. R.Krishnan, No.2/59, NGGO Colony, Oddapatti, A.Jettihalli, Dharmapuri – 636705.
M/s. Grand Business Ventures India (P) Ltd., No.160, Lingi Chetty Street, Chennai – 600001.
M/s. VNCT Global LLP, No.2, Sun Centre, First Floor, Tank Bund Road, Nungambakkam, Chennai – 600034.
1) Thiru. R.Hari Kumar, R3, MMDA Colony, Arumbakkam, Chennai – 600106 and 2) M/s. Traventure Homes (P) Ltd., No.18/35
M/s. A.R.Foundations, Acropolis Building, Ground Floor, No.148, Dr. Radhakrishnan Road, Mylapore, Chennai – 600004.
M/s. Balu Constructions, No.32, 2nd Floor, K.B. Dasan Road, Alwarpet, Chennai – 600018.
Thiru. A.S.Murugesan, No.72, LIG Mullai Nagar, TNHB Colony, West Tambaram, Chennai – 600045.
Thiru. V.Varun Kumar, No.3/525, Kuppandapalayam, Kumarapalayam, Namakkal District – 638183.
Thiru. Gopalji Agrawal, No.17/12, Omkar Apartment, Rajarathinam Street, Kilpauk, Chennai – 600010.
Tmt. R.Ramayee, No.324, N.S.K. Nagar, Andankovil East Village, Manmangalam Taluk, Karur District.
Thiru. V.Anandan, No.10/15, Thiru Nagar, First Street, Thiruvottriyur, Chennai – 600019 and Thiru. S.Saravanan, No.15/13, Ku
Thiru. V.Murali, G-5, Janpriya Pramila Enclave, Uma Nagar, Begumpet, Hyderabad – 500016 and Thiru. R.Manoharan, No.263A
M/s. Danub Homes Pvt. Ltd., – for self and POA of M/s. Casa Grande Milestone Pvt. Ltd., New No.111, Old No.59, NPL Devi, 5t
Thiru. T.Vijayakumar, No.18/19, Akshaya Garden, Govt. Arts College Road, Udumalpet – 642126.
M/s. Green Field Housing India (P) Ltd., No.48/2, Sangu Nagar, Surampatti, Erode, Erode District – 638011.
The Executive Engineer, Tamil Nadu Slum Clearance Board, Division-II, 13th Sector, 83rd Street, Sivalingapuram, K.K. Nagar, C
Thiru. G.Ram Kumar, M/s. VAGAN Construction, No.4, S1, Swarnalayam, Nethaji Colony, 6th Street, Velachery, Chennai – 600
Thiru. R.Sunil Kumar, No.1, IIIrd Main Road, Vijaya Nagar, Velachery, Chennai – 600042.
1) Thiru. T.N.Sivaramakrishnan, 2) Tmt. Meenakshi Sivaraman, No.18, AGAJA, No.13, Raman Street, T.Nagar, Chennai – 60001
M/s. Rajarathnam Construction (P) Ltd., No.20, Anderson Road, Ayanavaram, Chennai – 600023.
1) M/s. Green Choice Construction Company Pvt. Ltd., and 2) Thiru. S.Suresh, No.25, 1st Main Road, Kasturba Nagar, Adyar, C
1) M/s. Vantage Housing Developers Pvt. Ltd., (Developer), 2) Thiru. T.P.Velpari (Owner) and 3) Thiru. T.P.Annadurai (Owner),
Thiru. M.Sudhirr Mehta & M/s. Aashiana Foundations, No.155/8, Govindappa Naicken Street, Chennai – 600001.
Thiru. K.Abdul Nabeel, No.73A/74B, Sea Park, 7th Street, Maraikkayar Nagar, Neelankarai, Chennai – 600115.
Thiru. T.Arun Prasath, No.95/215, Jawahar Main Road, Punjai Puiliampatti, Erode – 638459.
M/s. Top Light Homes Pvt. Ltd., No.7A, Near Ramasamymuthammal Kalayana Mandapam, Ramalingam Nagar, Palladam Road
The Executive Engineer, Tamil Nadu Slum Clearance Board, Division-II, No.13th Sector, 83rd Street, Sivalingapuram, K.K. Naga
The Executive Engineer, Tamil Nadu Slum Clearance Board, Division-II, No.13th Sector, 83rd Street, Sivalingapuram, K.K. Naga
M/s. Chola Builders, No.119, ‘D’ Greenways Road, Fairlands, Salem – 636016 and Thiru. S.K.Senthil Kumar, No.119, ‘D’ Greenw
M/s. Naaghappa Shelters, No.1, Kennedy Nagar, Anakaputhur, Chennai – 600070.
1) M/s. Firm Foundations & Housing Pvt. Ltd., (Developer) & 8 Owners Namely: Tvl. 2) Mary Angelina Paul, 3) Samuel Rajasun
Thiru. K.R.Sridharan, No.62/35, Fast Sengunthar Street, Vangarampettai, Papanasam – 614205.
M/s. V.G.N. Homes Pvt. Ltd., No.333, Poonamallee High Road, Amaindakarai, Chennai – 600029.
Thiru. Sidharth Tatia, Rep. by its Partner, M/s. Lucky Combines LLP, No.3/2, Second Main Road, Vengeshwarar Nagar, Vadapa
M/s. Arthanarieswara Promoters, Door No.5, Ground Floor, Sudhakar Complex, Velur Road, Tiruchengode – 637211.
M/s. Priya Construction, No.86, 1st Street, 1st Sector, K.K. Nagar, Chennai – 600078.
M/s. Jones Foundations Pvt. Ltd., No.2, Moovarasampet Main Road, Madipakkam, Chennai – 600091.
M/s. VGN Homes Pvt. Ltd., No.333, Poonamallee High Road, Amaindakarai, Chennai – 600029.
Thiru. M.K.Dhanusu, No.04/292, Gandhi Street, Prem Nagar, Polichalur, Chennai – 600074.
M/s. VGN Homes Pvt. Ltd., No.333, Poonamallee High Road, Amaindakarai, Chennai – 600029.
M/s. VIP Grand Properties, Mani Gounder Properties, Opp. PWD office, Trichy Main Road, Pongalur, Tiruppur – 641667.
1) Tmt. M.Janaki, No.4, Jayathirtharao Cross Street, Pammal, Chennai – 600075, 2) Tmt. M.Mahalaksmi, No.13, Canal Bank Ro
1) M/s. Grand Promoters & 2) M/s. Royal City Promoters, Flat-F3, Towers, No.12, Ramagiri Nagar, Tharamani High Road, Vela
1) M/s. Sri Balaji Builders, No.5, Lake Front Residency Apartments, Sakthi Vijayalakshmi Nagar, Velachery, Chennai – 600042 a
M/s. Sumeru Construction & M/s. Sumeru Housing & Constructions, No.73, Mahatma Gandhi Road, Nungambakkam, Chenna
Thiru. R.Raghupathy, No.13 A/9, 1st Cross Street, M.F. Road, Ranipet – 632401.
1) M/s. Saagar Eco Projects Pvt. Ltd., and 2) Thiru. D.S.Shayam Sundar, No.3, 8th Cross Street, Shenoy Nagar, Chennai – 60003
M/s. Isha Homes India Pvt. Ltd., Old No.74, New No.55, 1st Avenue, Indira Nagar, Adyar, Chennai – 600020.
M/s. Army Welfare Housing Organisation, Kashmir House, Rajaji Marg, New Delhi - 110011.
Tmt. C.Vijayalakshmi, No.9/14, Chinna Mill Street, Angalakurichi, Pollachi, Coimbatore – 642007.
Tmt. P.Thillaikarasi, No.39, Chinnamuthu, 3rd Street, E.K.Valasu, Erode – 638011.
M/s. St.Angelo’s VNCT Ventures LLP, No.02, Sun Centre, First Floor, Tank Bunk Road, Nungambakkam, Chennai – 600034.
Thiru. V.N.Devadoss, No.333, Poonamallee High Road, Amaindakarai, Chennai – 600029.
M/s. Right Choice SP Promoters Pvt. Ltd., Plot No.11, Secretariat Colony, Kaspapuram Main Road, Padhuvanchery, Chennai –
Tmt. T.Thilagavathy, No.B-5, Veerabagu Nagar, Pettai, Tirunelveli – 627004.
Thiru. S.Jeyaraman, No.63, Thiruvallur Street, Udaiyavar Koil, Thirumazhisai, Thiruvallur District – 601124.
Thiru. I.Radhakrishnan, No.981/1, Iyyar Vilai, Vathiyar Vilai, Krishnan Kovil, Vadasery West Village, Agastheeswaram, Nagerko
Tmt. S.Saraswathi, Door No.413, Kamarajar Road, Lakshmipuram, Peelamedu, Coimbatore South, Coimbatore – 641004.
1) Thiru. F.Chandanmal Bothra, 2) Tmt. C.Nirmala Bothra, 3) Thiru. C.Naresh Bothra, 4) Thiru. C.Sunil Bothra, No.108, Pamma
M/s. Oliyas Construction, No.9, 4th Street, Padmanabha Nagar, Adyar, Chennai – 600020.
M/s. Sri Lakshmi Homes Pvt. Ltd., No.28/16, Anna Street, Kallikuppam, Ambattur, Chennai – 600053.
1) Thiru. M.Venkatesh, No.1/190, Seemapuram Village, Minjur – 601023 and 2) M/s. GP Homes Pvt. Ltd., W-740, First Floor, 4
The Executive Engineer, Tamil Nadu Slum Clearance Board, Division-II, No.13th Sector, 83rd Street, Sivalingapuram, K.K. Naga
The Executive Engineer, Tamil Nadu Slum Clearance Board, Division-II, No.13th Sector, 83rd Street, Sivalingapuram, K.K. Naga
M/s. Ideal Building Company, No.141, A1-Block, Anna Nagar, Chennai – 600040.
M/s. Sree Balaji Associates, No.62, Kaniyampalayam, Kagam Post, Sivagiri (Via), Erode – 638109.
M/s. Sri Lakshmi Homes Pvt. Ltd., No.28/16, Anna Street, Kallikuppam, Ambattur, Chennai – 600053.
Thiru. V.Murugan, No.40B, Rajammanner Street, Melur, Thoothukkudi – 628002.
1) Thiru. V.Nagarajan, No.228, Chetti Street, Nagercoil, Kanyakumari District – 629002 and 2) Thiru. P.Rajesh, No.33, Narayan
Thiru. M.Selvanathan, No.1569A, 1st Cross Thendral Nagar, Thiruvallur – 602024.
1) M/s. Stepstone Promoters Pvt. Ltd., (GPA Holders), 2) Thiru. S.Purushothaman (GPA Holders), 3) Thiru. G.Arun Kumar (GPA
1) Thiru. L.Udaya Kumar, No.1/63, Bajanai Koil Street, Moovarasampet, Madipakkam, Chennai – 600091, 2) Thiru. R.Jaya Prak
Project Details and Address
Project Name: “World Trade Centre Chennai” - Construction of Combined Trip
Construction of Stilt Floor + 3 Floors with 31 dwelling units comprised in
Construction of Stilt Floor + 3 Floors residential building with 14 dwelli
Project Name: “Aradhana” - Construction of Stilt Floor + 3 Floors residenti
Project Name: “Parvatha Nagar” - Registration of Layout with respect to Unso
Construction of Agathiyampalli Phase-II - Two Blocks of Type-B of Ground F
Construction of Agathiyampalli Phase-I - One Block of Type-A of Ground Fl
Project Name: “Livedge Life” - Construction of Stilt Floor + 3 Floors with
Project Name: “Orchid Ariana” - Construction of the Promoter share of Flats
Project Name: “Suresh Residency” - Construction of Ground Floor + 2 Floors
Project Name: “Adroit Prosper” - Construction of Block–A: Basement Floor + S
Construction of Registration of Type-A: Block 1 to 15, Type-B: 8 Blocks, Typ
Construction of Block-1: Consisting of Stilt Floor + 5 Floors residential
Project Name: “Muthu Garden” - Regularisation Layout framework for unsold P
Project Name: “Pearl County” - Layout of house sites comprised in S.No.568/
Sub-Division of house sites in S.No.371/3 of Ayapakkam Village, Avadi Taluk,
Project Name: ”Kasthuri’s Piedmont” - Layout of house sites comprised in
Layout of house sites comprised in R.S.Nos.40/1A2B, 40/1B1B, 40/1C1, 40/4
Layout of house sites with 59 Regular Plots, 26 EWS Plots, Total 85 Plots i
Project Name: “VIP Garden Phase-I” - Registration of unsold Plot Nos. 1, 2,
Construction of Block-1 to 3 of Ground Floor + 5 Floors with 108 tenements
Construction of One Block of Type-A: Ground Floor + 3 Floors with 16 tenem
Construction of 2 Blocks consisting of Stilt Floor + 10 Floors with 60 dwel
Project Name: “Symphiny” - Construction of Promoter share of 4th Floor -
Project Name: “Dhiya’s Sai Vriksham” - Construction of Block-A of Stilt Floor
Project Name: “Brigade Xanadu – Cluster III/Celeste and Commercial Block-I
Project Name: “Whitefield Mudra Phase-IV” - Construction of Stilt Floor +
Project Name: “Sea Mist” - Construction of Stilt Floor + 5 Floors residen
Project Name: “SPP Grand” - Construction of Stilt Floor + 3 Floors resident
Layout of house sites with unsold Plot Nos. 1 to 3, 5, 6, 11 to 18, Total
Project Name: “Jagan Nagar” - Layout of house sites with respect to Plot N
Project Name: “Balu Garden” - Layout of house sites for the unsold Plot No
Project Name: “VGN Hive” - Layout of house sites comprised in Old S.Nos.341
Project Name: “Dhanalakshmi Nagar” - Regularisation Layout framework for
Layout of house sites with 33 No. of Plots comprised in S.Nos.101/1B3, 1C3
Project Name: ”Vairam Nagar” - Layout of house sites for unsold Plot Nos.1 t
Layout of house sites with 47 Plots + 2 Convenience Shop site comprised in
Construction of Basement Floor Level-1 & Level-2 + Ground Floor + 3 Floor
Project Name: “Ocean Sri City” - Layout of house sites comprised in S.Nos.7
Project Name: “VGN CH-40” - Layout of house sites Re-designation of Shop Pl
Construction of Stilt Floor + 5 Floors with 10 dwelling units at Plot No.8
Project Name: “VGN Exotica” - Construction of Stilt Floor + 4 Floors with
Project Name: “Etica Srinidhi” - Construction of Registration of Builders s
Project Name: “Magnus” - Construction of Stilt Floor + 4 Floors + 5th Flo
Construction of Ground Floor Building for Ware House comprised in S.Nos.5
Construction of Slum tenements Additional Construction of Block-3 of Stilt
Construction of Slum Tenements of Ground Floor + 3 Floors 28 residential bu
Project Name: “Ardenwood” - Construction of Stilt Floor + 5 Floors with 40
Project Name: “V.I.P. Garden Phase-II” - Layout of house sites for the unso
Project Name: “Adityaram Nagar” - Layout of house sites with 14 Plots comp
Project Name: “Adityaram Nagar” - Layout of house sites with 8 Plots compri
Project Name: “Apple City” - Layout of house sites with 70 Regular Plots, 3
Project Name: “Meena Avenue” - Layout of house sites with Unsold Plot Nos.1,
Project Name: “Raja Ganapathy Nagar” - Registration of Layout with 51 Regul
Project Name: “Royal Garden East Extension” - Layout of house sites with 123
Construction of 4 Blocks of Type–A: Ground Floor + 2 Floors with 24 teneme
Project Name: “TVS Emerald Peninsula Phase-II (Block Nos.3, 4, 6 & 7)" - Co
Construction of Basement Floor + Ground Floor + 6 Floors with 36 dwelling
Construction of 8 Blocks of Block-A1, A2, B1 to B6, with Ground Floor + 2 F
Project Name: “Magizhchi Colony” - Construction of Stilt Floor + 4 Floors r
Project Name: “Vijay Raja 360º” - Construction of High Rise Residential & Co
Construction of 6 Blocks of Block Nos.1, 2, 3, 4, 5, 6 - Type–A: Ground Fl
Project Name: “Swasti” - Construction of Promoter share of First Floor with
Layout of house sites comprised in S.Nos.328/1, 2A, 329/1B & 2C1 of Adagga
Project Name: “Immaculate Mary Nagar” - Layout of house sites with reference
Layout of house sites with Unsold Plot Nos.1, 5, 7, 8, 8A, 9 to 11, 11A, 12 t
Project Name: “Ruby” - Construction of Stilt Floor + 4 Floors with 12 dwel
Project Name: “Devi’s Tharakarama” - Construction of Stilt Floor + 2 Floors
Project Name: “The Podium” - Construction of Extended Double Basement Floo
Project Name: “Shri Shakthi Saravana” - Construction of Stilt Floor + 5 Flo
Project Name: “S&P Adornia” - Construction of Stilt Floor + 5 Floors reside
Project Name: “Vencer Palatine” - Construction of Combined extended Baseme
Project Name: “Lakshmi Green City” - Sub-division of Plot Nos.1, 2, 3, 4, 5,
Project Name: “Jasmine Valley” - Layout of house sites in S.Nos.272/1B, 274
Project Name: “Lakshmi Green City” - Sub-Division of Plot Nos.1A, 2A, 3A, 4
Project Name: “Bell Avenue” - Layout of house sites comprised in S.Nos.69
Project Name: “Collector Nagar” - Layout of house sites for unsold Plot Nos
Layout of house sites with unsold Plot Nos. 11, 12 & 13 (Total 3 Plots) co
Project Name: “Deflora” - Layout of house sites with 100 Regular Plots, 31
Layout of House Sites with Unsold Plot Nos. 1 to 100, 103, 105, 109, 110, to
Project Name: “Casagrand Bloom-III” - Construction of Residential building
Project Name: “Isha Code Field - Phase-II” - Construction of Ground Floor +
Construction of 2 Blocks of Ground Floor + 3 Floors with 32 tenements in e
Construction of Stilt Floor Part / Ground Floor Part + 3 Floors Shops cum Of
Construction of Stilt Floor Part/Ground Floor Part + 9 Floors with 90 dwell
Project Name: “Adaikala Annai Nagar” - Regularisation Layout framework - Uns
Project Name: “Thalavedu” - Construction of Slum tenements of Block A - 7 N
Construction of 2 Blocks of Ground Floor + 3 Floors residential building w
Project Name: “Green Park Phase-II” - Layout of house sites with respect to u
Project Name: “Ananya Krishnaa-Hardeep Apartments” - Construction of Regis
Construction of Seven Blocks of Type–A: Block Nos. 1, 2, 5, 6, 7, 8, 9 of G
Project Name: “VGK Saindhavi” - Construction of Stilt Floor + 4 Floors +
Project Name: “Maliban Majestic” - Construction of Stilt Floor + 3 Floors r
Construction of Project Registration of 2 Flats at 5th Floor only over the S
Project Name: “Kasthuri” - Construction of Registration of promoter share of
Regularisation Layout framework for unsold Plot Nos. 1, 2, 8, 9, 13–15, 18–2
Project Name: “Navratnapuri Phase-II” - Layout of house sites with 82 Reg
Project Name: “Shree Rajalakshmi Avenue” - Layout of house sites with Unsold
Layout of house sites for unsold Plot Nos.1, 2, 4 to 36 comprised in S.Nos.
Project Name: “Brindhavan Garden” - Layout of house sites comprised in S.
Construction of Stilt Floor + 3 Floors with 9 dwelling units at Plot No.2
Project Name: “PKS Sai Garden” - Construction of Stilt Floor + 3 Floors wi
Project Name: “Golden City” - Regularisation Layout framework for unsold Pl
Layout of house sites for the unsold Plot Nos. 1 to 4, 7 to 54 + 1 Shop Sit
Construction of Two Nos. of Block–A of Ground Floor with 54 tenements, Fi
Construction of Block Nos. 1 to 18 of Ground Floor + 5 Floors with 96 tenem
Construction of Stilt Floor + 13 Floors with 117 dwelling units at K.K. Salai
Project Name: “Punugandoddi” - Construction of Slum Tenements 6 Blocks of
Project Name: "Lakshmi Green City" - Sub-division of Residential 7 Plots com
Project Name: "Lakshmi Green City" - Sub-division of Plot Nos. 1C, 2C, 3C, 4
Project Name: "Vinayaga Moorthy Nagar" - Regularisation Layout framework
Project Name changed from “Casagrand Centurian” to "Casagrand Vistaaz" - Co
Project Name: "Adityaram Nagar" - Layout of house sites comprised in S.Nos.
Project Name: "Docla Project" - Layout of house site with 103 Regular Plots
Project Name: "Laya Nagar" - Registration of Unsold regularized Plot Nos. 1,
Project Name: "Krishna Avenue" - Regularisation Layout framework for unsol
Construction of Registration of Land Owners share of Flat Nos. 1A, 1B, 3A,
Project Name: “Kalpatharu” - Construction of Block–1: Ground Floor + First
Project Name: "Tanny’s Ve’Lands" - Construction of Developer Share of Flat N
Project Name: "Sree Guru Prakriti" - Construction of Stilt Floor + 5 Floors
Project Name: "Gurudev Apartments" - Construction of Stilt Floor + 5 Floor
Project Name: "Radiance Smartville" - Layout of house sites with 184 Regul
Project Name: "Mohi Florence Phase-2" - Layout of house sites with 49 No.
Project Name: "Rank Sai Meera" - Construction of Stilt Floor + 5 Floors wi
Project Name: "Swathy Orchard" - Construction of Stilt Floor + 3 Floors re
Project Name: "Apple Residency" - Construction of Stilt Floor + 5 Floors re
Project Name: "Urbando Orion" - Construction of Stilt Floor + 3 Floors with
Project Name: "Shah Paradise" - Construction of Stilt Floor + 4 Floors + 5
Construction of Stilt Floor + 9 Floor with 72 dwelling units at Plot Nos
Project Name: "JJ Nagar" - Layout of house site with 47 Plots comprised in S.
Project Name: "Vanavil S.K. Avenue" - Layout of house sites with 37 Plots
Project Name: "Ashok Niranjan Phase-IV" - Layout of house sites comprised
Project Name: "Tarangini" - Layout of house sites comprised in S.No.106/
Layout of house sites comprised in S.No.43/2 of Thathaneri Village, Madurai
Project Name: “Emerald Village Phase-III” - Registration of unsold Plot Nos. 2
Project Name: “Dream Villa Garden” - Layout of house sites with 20 Regular
Project Name: “Nivasan Udhyana” - Construction of 8 Blocks of Stilt Floor +
Project Name: “S&P The Address” - Construction of Ground Floor + 1st Floor
Construction of 2 Blocks of Stilt Floor + 5 Floors residential building wi
Project Name: “Annai Teresa Nagar” - Unsold Plot Nos. 1 to 28, 30 to 32 comp
Project Name: “Adityaram Nagar” - Sub-Division of Land in S.Nos.83/4 part,
Construction of Extended Basement Floor (Parking) + Ground Floor Part: Shop
Project Name: “Sands N Waves” - Layout of house sites with 26 Plots comp
Construction of Slum tenements Additional Construction of 12 Blocks of C1 t
Project Name: “V.I.P. Garden Extension-VI” - Layout of house sites for the
Project Name: “Hidden Bay Layout” - Layout of house sites with unsold Plot N
Project Name: “Ganapathy Gardens” - Layout of house sites with respect to Pl
Project Name: “A.VR.A. Residency” - Layout of house sites with unsold Plot
Layout of house sites with 38 Plots + 2 Shop Site + 1 Own Use comprised in
Project Name: “Lakshmi Green City” - Sub-division of Residential 6 Plots (Pl
Construction of Two Nos. of Block-2, 9 of Type–A: Ground Floor + 4 Floors
Layout of house sites for the unsold Plot Nos.1 to 15, 18, 21 to 34, 37 to
Layout of house sites comprised in S.Nos.40/1B, 40/2 & 40/4 of Thattaneri Vi
Construction of Residential tenements Block-A & B of Ground Floor + 3 Floo
Residential Layout with 18 Plots + 1 Shop site + 1 Own use comprised in S.N
Construction of Stilt Floor + 4 Floors + 5th Floor part residential with
Project Name: “Maharaja Nagar” - Regularisation Layout framework for un
Project Name: “Sunkriti” - Layout of house sites with respect to Unsold Plot
Project Name: “Parvathy Enclave” - Layout of house sites with 285 Regular
Project Name: “Rams Spring Gardenia” - Construction of Stilt Floor + 2 Floo
Project Name: “GP Flora Ruby” - Construction of Promoter share of Flats Fir
Project Name: “Aara Apartment” - Construction of Stilt Floor + 5 Floors wit
Project Name: “Ashwath Meadows Phase-I” - Layout of Public Purpose Plot b
Project Name: “Sai Sun La Avenue” - Regularization of Layout with Unsold Plot
Project Name: “V.K. Avenue” - Regularized Layout of house sites with Unsol
Sub-Division of house sites comprised in S.No.365/3B of Ayapakkam Village,
Project Name: “GP Valencia Diamond” - Construction of Stilt Floor + 4 Flo
Regularisation Layout framework for unsold Plot Nos.1–36, 143, 156, 157, 1
Project Name: “Lakshmi Green City” - Sub-Division of Plot Nos.1D, 2D & 3D C
Project Name: “Sri Velavan Nagar” - Layout of house sites with Unsold Plot Nos
Project Name: “Surya Garden” - Layout of house sites for the unsold Plot N
Sub-Division of Industrial Site & Plot Nos.1, 2 & 4 comprised in S.No.375/2
Project Name: “Thirumal Nagar” - Layout of house sites with Unsold Plot Nos
Project Name: “Yeses Apartments” - Construction of Stilt Floor + 3 Floors res
Construction of Stilt + 5 Floors building with 15 dwelling units at Plot
Project Name: “Sai Gardenia” - Construction of Developer’s Share of Flat Nos.
Project Name: “Chand” - Construction of Stilt Floor + 4 Floors residential
Project Name: "Summer Garden" - Construction of Stilt + 4 Floors + 5th Fl
Project Name: "Truliv Porur" - Construction of Stilt Floor + 5 Floors Ser
Project Name: "The Param" - Construction of Registration for the revised ap
Construction of One Block of Type-A: (Ground Floor + 3 Floors) with 32 Nos
Project Name: “Sri Pandian Nagar” - Regularisation Layout of house sites f
Project Name: "Gangaipuram Extension" - Layout of house sites for the unsol
Project Name: "Marina" - Regularisation Layout framework consists of unsold
Project Name: "Sri Mahalakshmi Nagar" - Regularisation Layout framework for
Project Name: “Rohaan Bamboo” - Construction of Stilt Floor + 3 Floors with
Sub-division of the property into 3 No. of Plots for Industrial use compris
Project Name: “MS Residency” - Layout of house sites with 146 Regular Plot
Project Name: “Sands N Waves-Phase 2” - Layout of house sites with 19 P
Project Name: “Aavishkaar Svastham” - Construction of Ground Floor + 1st Flo
Construction of Slum tenements of Block A1 to A8, Block B1 to B2: Ground F
Project Name: “Urban-OMR-Chennai” - Construction of Sub-Division of Plot No
Project Name: “Aavishkaar-Naruvi” - Construction of 8 Blocks of Type-A: Grou
Project Name: “Siraj” - Construction of Block-1: Stilt Floor + 5 Floors with
Construction of 7 Blocks of A-A7 of Type-A: Ground Floor + 5 Floors with 9
Construction of Block-A: Ground Floor + 4 Floors with 85 tenements, Block
Project Name: “Galaxy Square” - Sub-division of Plot Nos. 27B & 27C into 6
Layout of house sites comprised in S.Nos.661/2 & 661/4, Andankovil West V
Layout of house sites comprised in S.Nos.660/2 & 661/8, Andankovil West V
Project Name: “Royal Aananda Phase-I” - Construction of Common Basement Flo
Project Name: “Annamalaiyarr City” - Layout of house sites with 146 Regular
Project Name: “VGK Sangamithra” - Construction of Stilt Floor + 4 Floors +
Project Name: “Republic” - Construction of Block-A: Stilt Floor + 7 Floors
Construction of Stilt Floor + 3 Floors with 12 dwelling units at Plot No
Project Name: “Sethu Amirthavalli Nagar” - Layout of house sites with Unsold
Project Name: “Abinandan’s - Vasudha” - Construction of Stilt Floor + 3 Flo
Project Name: “Antrix Apartments” - Construction of Stilt Floor + 5 Floors
Project Name: “Krishna Nagar” - Layout of house sites with Unsold Plot Nos.
Project Name: “Grand Brenton” - Construction of Stilt Floor + 5 Floors Com
Project Name: “Spring Field-Pammal” - Construction of Ground Floor + 1st Fl
Project Name: “Samiha” - Construction of Stilt Floor + 5 Floors with 15 d
Project Name: "Amara Ananda" - Construction of Stilt Floor + 4 Floors with
Layout of house sites comprised in S.Nos.63/1, 2, 64A/1, 2A, 65B/2, 3, 66/3,
Sub-Division of house sites comprised in S.No.345/3A1 of Naduveerapattu V
Project Name: “Sri Anugraha Garden” - Layout of house sites comprised in
Project Name: “Jayam Nagar” - Layout of house sites with Unsold Plot Nos.6W,
Layout of house sites with 14 Plots comprised in S.No.661/6 of Andan Kovi
Project Name: “Royal Divine” - Regularisation Layout framework (excluding P
Regularisation Layout framework for the unsold Plot Nos. 1 part, 9 part, 1
Project Name: "Casagrand First City" - Construction of 2 Blocks consistin
Layout of house sites with unsold Plot Nos. 2 to 14 (Total 13 Plots out of
Project Name: “Bougainvillea” - Layout of house sites for unsold Plot Nos.5
Construction of Ground Floor + 4 Floors with 20 Tenements (Pocket-3) compri
Construction of Stilt Floor + 3 Floors with 12 dwelling units at Plot Nos.
Project Name: “Varsidhi Starr Homes” - Construction of Stilt + 3 Floors with
Project Name: “Abirami” - Construction of Stilt Floors + 5 Floors with 10
Project Name: “RC-Jones Castle” - Construction of Stilt Floor + 8 Floors
Construction of Stilt Floor + 4 Floors residential building with 56 dwelli
Project Name: “Vantage Ganga” - Construction of Stilt Floor + 3 Floors res
Regularisation of Layout framework for unsold Plots comprised in S.Nos.50/
Project Name: “La Italia Phase-II” - Regularisation Layout framework project
Project Name: “SBA City” - Layout of house sites for the Unsold Plots: 1 to 7
Layout of house sites for the Unsold Plots: 1, 2, 4 to 71, 73 to 85, 87 to 89
Construction of Ground Floor + 4 Floors with 20 Tenements (Pocket-I) compri
Construction of Ground Floor + 3 Floors with 8 Tenements comprised in S.Nos.
Project Name: “Chola Sri Viswa” - Construction of Stilt Floor + 3 Floors wi
Project Name: “Orchid” - Construction of Stilt Floor + 5 Floors Residentia
Project Name: “Firm’s HS Paul” - Construction of Stilt Floor + 4 Floors Re
Layout of house sites with Unsold Plot Nos.3, 7, 9, 14, 15, 18, 22, 24, 25, 27
Project Name: “VGN Mahalakshmi Nagar Phase-XIII” - Sub-Division of house
Project Name: “Darshan Garden” - Layout of house Sites comprised in S.Nos
Layout of house sites comprised in S.Nos.345/2A, 347/1, 348/1A & 348/2A o
Project Name: “Sri Lakshmi Kuberar” - Sub-Division of Land comprised in
Project Name: “Jones Cassia III Extension” - Layout of house sites with 12
Project Name: “VGN Mahalakshmi Nagar Phase-XI” - Layout of house sites w
Layout of house sites with Unsold Plot Nos.2 to 7, 9 to 19, 22 to 25, 27 to
Project Name: “VGN Varna Bhoomi Phase-II” - Layout of house sites with 76
Layout of house sites with 141 Regular Plots and 77 EWS Plots comprised in
Project Name: “Srinivasa Palms” - Layout of house sites comprised in S.N
Layout of house sites comprised in S.No.306/1B1 of Mambakkam Village, Van
Sub-Division of Plot Nos.777, 779 & 781 of Ram Nagar South, 7th Main Road
Layout of house sites with 40 Regular Plots, 34 EWS Plots comprised in S.N
Project Name: “Kailash Apartment” - Construction of Stilt Floor + 4 Floors
Project Name: “Shyams Sankalpa” - Construction of Stilt Floor + 5 Floors r
Project Name: “Isha Code Field - Phase III” - Construction of Ground Floor +
Project Name: “Raman Vihar” - Construction of Four Blocks of Type-A with 64
Layout of house sites with 18 Regular Plots + 1 Shop site comprised in S.No
Layout of house sites with Unsold Plot: 01 out of 18 Plots comprised in S.N
Project Name: “Ocean Drive Villas - Phase-II” - Layout of house sites with
Project Name: “VGN Mahalakshmi Nagar Phase-XII” - Sub-division of house si
Project Name: “Narasimma Nagar” - Layout of house sites with Unsold Plot N
Layout of house sites with 64 Regular Plots and 17 EWS Plots comprised in R.
Project Name: ”Supreme Avenue” - Layout of house sites for the Unsold Plot N
Layout of house sites comprised in S.Nos.294/1B, 1C, 2, 8B1, 296/5A & 6A
Layout of house sites comprised in S.Nos.502/2B2 & 503/1B2 of Varapatti Vi
Project Name: “Vanavil Avenue” - Layout of house sites comprised in S.No
Project Name: “Oliyas Serenity” - Construction of Stilt Floor + 3 Floors w
Project Name: “Lakshmi Green City” - Layout of house sites with 8 Regular P
Project Name: "GP East Wind” - Construction of Stilt Floor + 5 Floors with 3
Construction of Slum Tenements of Ground Floor + 4 Floors residential build
Construction of Slum Tenements of Ground Floor + 4 Floors with 40 dwelling
Project Name: “Abirami” - Construction of Promoter’s share of Ground Floor
Project Name: “Blue Leaf Fairy Homes” - Construction of Stilt Floor + 4 Flo
Project Name: “Lakshmi Green City” - Sub-Division of Plots - 1F, 2F, 3F & 4F
Project Name: “Green Park Avenue” - Unsold Plot Nos.1 to 212, 216 to 236,
Project Name: “V.I.P. Garden Extension-V” - Layout of house sites for unso
Project Name: “Sabari Nagar” - Regularisation Layout framework for Unsold Plo
Project Name: “Srinivasa Palms” - Layout of house sites with 32 Plots + 1
Project Name: “Navasakthi Nagar” - Layout of house sites for the Unsold Pl
Approval Details
CMDA issued Planning Permission in Letter No.C3(S)/3448/2017, dated 28.02.2018. Greater Chennai Corporation issued Build
Technical Sanction accorded by the Deputy Director, O/o. District Town & Country Planning, Kancheepuram District vide Lette
Planning Permission No. PPA/WDCN11/01169/2020, dated 19.03.2020 and Building Permission No. BA/WDCN11/01257/2020
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B1)/0965/2019, dated 08.01.2020. Greater Chennai Corporation i
The Deputy Director (i/c), T&CP, Sivagangai Region accorded technical sanctioned for the Layout No. 40/2017 in Letter RC No
Technical sanction accorded by the Deputy Director, O/o. District T&CP, Nagapattinam District vide Letter No. 56/2020/ND-2,
Technical sanction accorded by the Deputy Director, O/o. District Town & Country Planning, Nagapattinam District vide Letter
Planning Permission issued by the Senior Planner/(B-S, APU)/ CMDA/Chennai, vide Letter No. PP/NHRB/S(B2)/1213/2019, dat
Planning Permission issued by the Joint Director/Member-Secretary/Coimbatore LPA vide Letter No. 3068/2019/LPA-1, dated
Planning Permission issued by the Member-Secretary, Trichy LPA vide Letter No. 220/2020/TLPA-2, dated 24.03.2020 and the
Planning Permission issued by the Member-Secretary, Mamallapuram LPA vide Letter No. 5454/2018/MLPA, dated 19.11.201
The Member-Secretary, Tirunelveli LPA issued Planning Permission in Letter RC No. 2624/2020/LPA3, dated 27.11.2020. The S
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B2)/0449/2020, dated 04.11.2020. The Special Officer & BDO(VP)
Regularisation Layout framework issued by the Assistant Director, T&CP, Perambalur Region vide Letter No. 215/2019/PR, da
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. L1/12787/2019, dated 13.05.2020 and
Planning Permission issued by the Chief Planner/Layout/CMDA/Chennai vide Letter No. L1/9590/2020, dated 02.12.2020 and
Planning Permission issued Chief Planner/Layout/CMDA/Chennai vide Letter No. L1/2748/2020, dated 10.11.2020 and the La
Technical sanction accorded by the Assistant Director/Member-Secretary (i/c), O/o. District Town & Country Planning, Madur
The Member-Secretary/Joint Director, Coimbatore LPA accorded technical sanction for the Layout No. 28/2020 in Letter RC N
The Deputy Director, T&CP/Member-Secretary(VP) accorded Technical sanction for Layout No.07/2020 in Letter RC No. 1197/
Planning Permission issued by the Assistant Director, O/o. Town & Country Planning, Salem District vide Letter No. 2338/2020
Technical sanction accorded by the Assistant Director, O/o. Town and Country Planning, Pudukottai District vide Letter No. 56
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. C3(S)/317/2020, dated 16.10.2020 and
Planning Permission issued by the Member Secretary, CMDA, Chennai vide Letter No. B3/15476/2014, dated 20.03.2015 and
Planning Permission issued by the Member-Secretary/Joint Director, Coimbatore LPA vide Letter No. 3453/2020/LPA, dated 2
CMDA issued Planning Permission No. C/PP/MSB/44(S-1 to S-59)/2019 in Letter No. C3(N)/5457/2018, dated 27.09.2019 and
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B2)/0436/2020, dated 21.11.2020. The Special Officer Medavakka
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B1)/0799/2019, dated 15.09.2020. Greater Chennai Corporation i
CMDA issued Planning Permission in Letter No.PP/NHRB/S(B1)/0948/2019, dated 20.01.2020. The Executive Officer, Perungu
Greater Chennai Corporation issued Planning Permission in Letter No. SD/WDCN12/00417/2017, dated 19.06.2019
CMDA approved the Layout No. PPD/LO No.73/2019 in Letter No. L1/18589/2018, dated 05.07.2019. The Commissioner Kund
Technical Sanction accorded by the Member-Secretary, Coimbatore LPA vide Letter No. 663/2014/LPA-1, dated 20.09.2018 a
Planning Permission issued by the Chief Planner/Layout/CMDA/Chennai vide Letter No. L1/9635/2019, dated 07.11.2020 and
Regularisation Layout framework issued by the Deputy Director (i/c), T&CP, Dharmapuri Region, Dharmapuri District vide Lett
The Deputy Director, (T&CP) (i/c), Tiruppur Region technical sanctioned for the Layout No. 187/2020 in Letter RC No. 967/202
Technical Sanction accorded by the Deputy Director, O/o. District Town and Country Planning, Trichy District vide Letter No. 5
CMDA approved the Layout LPD/LO.No. 97/2020 in Letter No. L1/1884/2020, dated 23.10.2020. The Commissioner Villivakka
CMDA issued Planning Permission in Letter No.PP/NHRB/N/0429/2020, dated 11.11.2020. Greater Chennai Corporation issue
Technical sanction accorded by the Deputy Director, O/o. District Town & Country Planning, Kancheepuram District vide Lette
Planning Permission issued by the Chief Planner/ Layout/ CMDA/ Chennai vide Letter No. L1/6917/2020, dated 27.10.2020 an
Planning Permission issued by the Senior Planner/ APU/ B-South/ CMDA/ Chennai vide Letter No. PP/NHRB/S(B1)/0280/2020
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No.PP/NHRB/C/143/2020, dated 07.09.202
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B1)/0501/2020, dated 10.11.2020. Greater Chennai Corporation i
CMDA issued Planning Permission in Letter No. PP/SB/C/176/2019, dated 18.10.2019. Greater Chennai Corporation issued Bu
The Deputy Director, T&CP, Tiruvallur Region issued Planning Permission in Letter RC No.33/2016/TR2, dated 08.03.2016. The
The Member-Secretary, Coimbatore LPA issued Planning Permission in Letter RC No. 2710/2020/LPA, dated 04.12.2020. The C
The Deputy Director, T&CP, Thanjavur Region issued Planning Permission in Letter RC No. 1003/2020TR2, dated 04.11.2020. T
Planning Permission issued by the Member-Secretary, Mamallapuram LPA vide Letter No. 1413/2019/MLPA, dated 19.12.201
Technical Sanction & Planning Permission issued by the Joint Director/Member Secretary (i/c), O/o. District Town and Countr
Greater Chennai Corporation issued Planning Permission No. SD/WDCN15/00475/2019, dated 10.11.2020
Greater Chennai Corporation issued Planning Permission No. SD/WDCN15/00466/2019, dated 28.10.2020
CMDA approved the Layout PP/Lo.No. 93/2020 in Letter No.L1/4760/2020, dated 22.10.2020. The Commissioner, Poonamalle
The Deputy Director (i/c), T&CP, Tirunelveli Region accorded technical sanction for the Layout No. 18/2019 in Letter RC No. 24
The Deputy Director, T&CP, Madurai Region sanctioned the Layout No. 30/2020 in Letter RC No. 1748/2020/MR, dated 21.11
The Deputy Director/Member-Secretary, Madurai LPA (i/c) sanctioned the Layout No.43/2020 in Letter RC No. 725/2019/MR2
Planning Permission issued by the Member-Secretary/ Assistant Director/Pudukkottai Joint LPA/ O/o. District Town and Coun
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. C3(S)/22111/2018, dated 24.08.2020. B
Planning Permission issued by the Director (i/c), T&CP, Chennai vide Letter No. 8090/2020/CP, dated 22.07.2020 and the Buil
The Deputy Director, T&CP, Thanjavur Region issued Planning Permission in Letter RC No. 3014/2019TR2, dated 07.11.2020. T
Planning Permission issued by CMDA in Letter No. PP/NHRB/N/158/2020, dated 03.06.2020. Greater Chennai Corporation iss
CMDA issued Planning Permission in Letter No. C3(N)/21575/2018, dated 11.11.2020. The Commissioner, Poonamallee Panch
Technical sanction accorded by the Deputy Director, O/o. District Town & Country Planning, Nagapattinam District vide Letter
Planning Permission issued by the Deputy Planner, Area Plans Unit, CMDA, vide Letter No. PP/NHRB/N/0189/2020, dated 11.
Technical sanction accorded by the Assistant Director (i/c), O/o. Town & Country Planning, Dharmapuri District vide Letter No
The Deputy Director, T&CP, Peramballur Region accorded Technical sanction for the Regularized Layout No.13/2019 in Letter
The Deputy Director, T&CP, Tiruvallur Region accorded technical sanction for the Layout No. 087(R)/2019 in Letter RC No. 146
Planning Permission issued by the Deputy Planner (B-South)/Area Plans Unit/CMDA/Chennai vide Letter No. PP/SB/S(B1)/257
Greater Chennai Corporation issued Planning Permission in Letter No. PPA/WDCN03/03754/2020, dated 08.10.2020 and Build
CMDA issued Planning Permission in Letter No. C3(S)/69/2019, dated 05.09.2020. Greater Chennai Corporation issued Buildin
The Member-Secretary, Tiruchirappalli LPA issued Planning Permission in Letter RC No.277/2019/TLPA-2, dated 09.01.2020. T
CMDA issued Planning Permission in Letter No. PP/SB/C/265/2019, dated 24.10.2019. The Commissioner, Thiruverkadu Muni
CMDA issued Planning Permission in Letter No.C3(N)/4503/2017, dated 18.11.2019. Greater Chennai Corporation issued Build
Sub-division Permission issued by the Commissioner, Avadi City Municipal Corporation vide Letter No. 012/01/3/20-21/00065
Technical sanction & Planning Permission issued by the Member-Secretary (i/c), Hosur NTDA, O/o. Krishnagiri District Town &
Sub - Division Permission issued by the Commissioner, Avadi City Municipal Corporation vide Letter No. 012/01/3/20-21/0006
Technical sanction accorded by the Assistant Director, O/o. District Town and Country Planning, Karur District vide Letter No.1
Technical sanction accorded by the Deputy Director, Town & Country Planning, Chengalpattu Region vide Letter No. 6968/201
The Deputy Director, Town & Country Planning (i/c) Tirunelveli Region accorded Technical sanction for the Layout No. 01/202
The Deputy Director (i/c), Town & Country Planning, Krishnagiri Region accorded Technical sanction for the Layout No. 32/20
The Deputy Director (i/c), Town & Country Planning, Thiruvallur Region accorded Technical sanction for Regularized Layout N
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. B/NHRB/376/2020, dated 12.11.2020. B
Approval Details
Planning Permission issued by the Assistant Director/Member Secretary (i/c), O/o. District Town and Country Planning, Madu
Planning Permission issued by the Chief Secretary/Member-Secretary, CMDA, Chennai vide Letter No. B3/9562/2017, dated 0
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. C3(S)/285/2020, dated 09.12.2020 and
Regularisation Layout framework issued by the Deputy Director (i/c), O/o. Regional Town and Country Planning, Sivagangai Re
The Deputy Director (T&CP), Tiruvallur Region, accorded Technical sanction in Letter RC No. 1732/2020/Thiruvallur-2, dated 1
The Deputy T&CP, Chengalpattu Region is accorded Technical Sanction in Letter RC No.2798/2020/CR3, dated 21.11.2020. Th
CMDA approved the Layout No.131/2019 in Letter No.L1/10774/2019-1, dated 26.08.2019. The Executive Officer, Thiruninrav
CMDA issued Planning Permission in Letter No. PP/NHRB/C/479/2020, dated 06.10.2020. Greater Chennai Corporation issued
Technical sanction accorded by the Deputy Director, O/o. District Town and Country Planning, Kancheepuram District vide Le
CMDA issued by Planning Permission in Letter No. PP/NHRB/S(B1)/0405/2020, dated 25.08.2020. The Executive Officer, Mada
CMDA issued Planning Permission in Letter No. PP/NHRB/C/559/2019, dated 29.10.2019. Greater Chennai Corporation issued
The Member Secretary, (i/c) Madurai LPA issued Planning Permission in Letter RC No. 3840/19/MR-2, dated 09.06.2020. The
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B2)/0295/2020, dated 20.10.2020. Greater Chennai Corporation i
Technical sanction accorded by the Assistant Director, T&CP, Thiruvallur Region vide Letter No. 1468/2018/TVR-2, dated 14.0
The Deputy Director (i/c), T&CP, Chengalpattu Region accorded technical sanction for Layout No. 99/2020 in Letterr RC No. 24
The Deputy Director (i/c), T&CP, Erode Region issued technical sanction for Layout No.10/2020 in Letter RC No. 479/2020/ER–
Technical sanction accorded by the Deputy Director (i/c), O/o. District Town and Country Planning, Tiruppur District vide Lette
Technical sanction accorded by the Deputy Director, O/o. District Town and Country Planning, Kancheepuram District vide Le
Planning Permission issued by the Executive Engineer (T.P.), Greater Chennai Corporation vide Letter No. PPA/WDCN12/0685
Planning Permission issued by the Chief Planner/Area Plans Unit/CMDA/Chennai vide Letter No. PP/NHRB/C/1039/2019, date
Regularisation Layout framework issued by the Deputy Director (i/c), Town & Country Planning, Sivagangai Region vide Letter
Technical sanction accorded by the Deputy Director, T&CP, Madurai Region vide Letter No. 5990/2018/MR-3, dated 10.07.20
Planning Permission issued by the Member-Secretary/Joint Director, Kuruchi LPA vide Letter No.4271/2020/LPA, dated 15.12
Technical sanction accorded by the Assistant Director, O/o. District Town and Country Planning, Thiruvallur District vide Lette
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. C3/16212/2010, dated 30.01.2012. Bui
The Member-Secretary (i/c), Hosur New Town Development Authority issued Planning Permission in Letter RC No. 2770/2020
The Commissioner, Avadi Municipality issued Planning Permission in Letter PP No. 72/2021/F2, dated 02.02.2021
Sub-division Permission issued by the Commissioner, Avadi City Municipal Corporation vide Letter No. 012/01/3/20-21/00070
Technical sanction accorded by the Deputy Director (T&CP), Chengalpattu Region vide Letter No. 4474/2019/CR-3, dated 17.1
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. PP/NHRB/S(B1)/0533/2020, dated 07.1
Planning Permission issued by the Executive Engineer (T.P.), Greater Chennai Corporation vide Letter No. SD/WDCN15/00467
The Deputy Director, T&CP, Chengalpattu Region accorded issued Technical sanction for Layout No. 480/2019 in Letter RC No
The Deputy Director, T&CP, Chengalpattu Region, accorded Technical sanction for the Regularized Layout No. 595(R)/2018 in
Regularisation Layout framework issued by the Deputy Planner/CMDA/Chennai vide Letter No. Reg.Layout/6473/2018, dated
CMDA issued Planning Permission in Letter No. PP/SB/C/159/2019, dated 11.06.2019. Greater Chennai Corporation issued Bu
Planning Permission issued by the Member Secretary (i/c), Coimbatore LPA vide Letter No. 7167/2019/LPA-2, dated 02.03.202
The Member-Secretary, Coimbatore LPA issued Planning Permission in Letter No. 3611/2019/LPA, dated 07.10.2020. The Com
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B1)/0159/2020, dated 25.09.2020. Greater Chennai Corporation i
Planning Permission issued by the Assistant Director/Member Secretary (i/c), Salem LPA Vide Letter No. 2163/2019/SLPA, dat
The Director, T&CP, Chennai Region accorded Technical sanction for Layout No. 01/2020 in Letter RC No. 24278/2019/TCP-5,
CMDA approved the Layout PPD/LO No. 114/2020 in Letter No. L1/10160/2020, dated 21.11.2020. The Commissioner, St. Tho
Planning Permission issued by the Assistant Director, O/o. District Town and Country Planning, Salem District vide Letter No. 6
Greater Chennai Corporation issued Planning Permission No. PPA/WDCN06/00556/2020, dated 22.09.2020 & issued Building
The Joint Director/Member Secretary, Tiruchirapalli LPA accorded Planning Permission in Letter RC No. 2025/2019/TLPA-2, da
Planning Permission issued by the Executive Engineer (T.P), Greater Chennai Corporation vide Letter No. PPA/WDCN13/04639
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B1)/0079/2020, dated 10.08.2020. The Executive Officer, Perunga
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. C3 (N)/427/2020, dated 01.02.2021. Bu
The Joint Director, (i/c), T&CP, Tenkasi Region issued technical sanction for Layout No. 02/2020 in Letter RC No.465/2020TR, d
CMDA approved the Layout No. 115/2020 in Letter No. L1/8096/2020, dated 23.11.2020. The Special Officer, Naduveerapattu
Planning Permission issued by the Member-Secretary/ CMDA/ Chennai vide Letter No. L1/17919/2019, dated 01.10.2020. Lay
Planning Permission issued by the Member-Secretary (i/c), Kumbakonam LPA vide Letter No. 692/2016/KLPA dated 06.09.201
Planning Permission issued by the Member Secretary (i/c), Madurai LPA vide Letter No. 2178/2018/MP–2, dated 03.12.2019.
The Deputy Director, T&CP, Villupuram Region Technical sanction for the Layout No. 289/2018 in Letter RC No. 1207/2018VR
The Deputy Director/Member Secretary (i/c), T&CP, Chengalpattu Region accorded Technical sanction for the Layout No. 171
The Member-Secretary, Coimbatore LPA issued Planning Permission in Letter RC No. 2349/2017/LPA2, dated 29.09.2020. The
Approval Details
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B1)/1056/2019, dated 18.03.2020. The Commissioner, Tambaram
Planning Permission issued by the Chief Planner/ Layout/ CMDA/ Chennai vide Letter No. L1/21362/2019, dated 17.06.2020.
Planning Permission issued by the Executive Engineer (T.P.), Greater Chennai Corporation vide Letter No. SD/WDCN15/00465
Planning Permission issued by the Member Secretary, CMDA, Chennai vide Letter No. C3(S)/110/2020, dated 23.12.2020. Bui
Greater Chennai Corporation approved by the Layout in Planning Permission No. SD/WDCN15/00510/2020, dated 25.02.2021
The Deputy Director, T&CP, Theni Region issued Planning Permission in Letter RC No. 230/2020/TR-2, dated 22.10.2020. Copy
Technical sanction accorded by the Joint Director/Assistant Director (i/c), O/o. District Town and Country Planning, Kanyakum
The Deputy Director, T&CP, Villupuram Region regularized Layout framework No.605/2018R in Letter RC No.979/2017/VR, da
The Deputy Director, T&CP, Coimbatore Region, accorded Technical Sanction for the Layout No.340/2019 in Letter RC.No.148
The Deputy Director (i/c) T&CP, Sivagangai Region Regularized Layout Framework No.15/2018 in Letter RC No.1956/2017/SR4
The Member-Secretary (i/c), Madurai LPA accorded Technical sanction for Layout No. 98/2019 in Letter RC No.2179/2019/MR
The Commissioner, Avadi Municipality approved the sub-division vide PP No.82/2021/F2, dated 08.02.2021
Technical sanction accorded by the Assistant Director, O/o. District Town and Country Planning, Thiruvallur District vide Lette
Technical sanction accorded by the Deputy Director, O/o. District Town & Country Planning, Kancheepuram District vide Lette
Planning Permission issued by the Member-Secretary (i/c), Madurai LPA vide Letter No. 179/2020/MP–2, dated 25.06.2020. L
The Deputy Director (i/c), T&CP, Salem Region issued Planning Permission in Letter RC No.3699/2020SR, dated 05.01.2021. Th
The Member-Secretary, Madurai LPA (i/c) accorded technical sanction for the Layout No. 36/2020 in Letter RC No.39/2020/ M
Planning Permission issued by CMDA in Letter No. PP/NHRB/S(B2)/097/2020, dated 04.01.2021. Building Permission issued by
Technical sanction accorded by the Deputy Director, O/o. Regional Town and Country Planning, Sivagangai Region vide Letter
The Deputy Director (i/c), T&CP, Dharmapuri Region accorded Technical sanction for the Layout No. 101/2018 in Letter RC No
CMDA approved the Layout PPD/LO No. 121/2019 in Letter No. L1/5022/2019, dated 07.11.2019. The Executive Officer, Kund
Greater Chennai Corporation issued Planning Permission No. PPA/WDCN15/06371/2019, dated 30.09.2019 and Building Perm
Planning Permission as issued by the Chief Planner/Area Plans Unit/ CMDA/ Chennai vide Letter No. PP/NHRB/C/0556/2020,
Planning Permission issued accorded by Member-Secretary (i/c) O/o. Thanjavur LPA vide Letter 32/2020/TLPA, dated 15.07.2
CMDA approved the Layout PPD/Lo No.104/2020 in Letter No. L1/5766/2020, dated 02.11.2020. The Commissioner, Thiruver
The Member-Secretary (i/c), Mamalapuram LPA issued Technical sanction for Layout No. 12(R)/2019 in Letter RC No. 2946/20
CMDA Regularized the Layout No. PPD/Lo.No.257/2020 in Letter No. Reg.Layout/18926/2018, dated 19.10.2020. The Commis
Planning Permission issued by the Chief Planner /CMDA /Chennai vide Letter No.L1/4754/2020, dated 17/10/2020. Layout Pe
Planning Permission issued by the Chief Planner/Area Plans Unit/CMDA/Chennai vide Letter No. PP/NHRB/C/573/2019, dated
Technical sanction accorded by the Assistant Director/T&CP/Thiruvallur Region vide Letter No. 2554/2018/TVR-2, dated 27.03
Planning Permission issued by the Commissioner /Avadi City Municipal Corporation vide Letter No.81/2021/F2, dated 08.02.2
The Deputy Director, T&CP, Erode Region accorded Technical sanction for the Layout No. 84/2020 in Letter RC No.735/2020/E
Technical sanction accorded by the Deputy Director (i/c), O/o. District Town and Country Planning, Erode District, vide Letter
Planning Permission issued by the Chief Planner, CMDA, Chennai vide Letter No. L1/6022/2020, dated 18.12.2020 and Layout
CMDA Regularization of Layout framework PPD/Lo (Regularisation 2017) No. 742/2019 in Letter No.Reg.Layout/17276/2018,
The Member-Secretary, Dindigul LPA issued Planning Permission in Letter RC No. 1082/2019/DLPA, dated 06.12.2019. The Sp
CMDA issued Planning Permission in Letter No.PP/NHRB/S(B2)/0042/2020, dated 02.09.2020. Greater Chennai Corporation is
The Member-Secretary/Joint Director, Coimbatore LPA issued Planning Permission in Letter RC No. 5613/2019/LPA-2, dated 2
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B2)/315/2020, dated 08.12.2020. Greater Chennai Corporation ap
CMDA issued Planning Permission in Letter No. PP/NHRB/C/777/19, dated 14.08.2020. Greater Chennai Corporation issued B
CMDA issued Planning Permission in Letter No. PP/NHRB/C/1090/2019, dated 07.11.2020. Greater Chennai Corporation issue
CMDA issued Planning Permission for the revised proposal in Letter No.CMDA/PP/MSB/N/081/2019, dated 08.12.2020. Great
Planning Permission issued by the Member-Secretary (i/c)/Joint Director, Vellore LPA/O/o. District Town and Country Plannin
Regularisation Permission issued by the Senior Planner, CMDA, Chennai vide Letter No. Reg./Layout/598/2019, dated 16.09.2
Technical sanction accorded by the Assistant Director / Member-Secretary (i/c), O/o. District Town and Country Planning, Ma
Technical sanction accorded by Deputy Director (i/c), O/o. District Town and Country Planning Chengalpattu District the vide
Technical sanction accorded by Member-Secretary/Hosur New Town Development Authority vide Letter No. 1912/2019/HNT
Planning Permission issued by the Executive Engineer (T.P)/Greater Chennai Corporation vide Letter No.PPA/WDCN14/07250
CMDA approved the sub-division PPD/Lo No. 65/2020 in Letter No. L1/6021/2020, dated 18.12.2020. The Commissioner, Thri
CMDA approved the Layout PPD/Lo No. 45/2020 in Letter No. L1/5308/2019, dated 10.06.2020. The Commissioner, Poonama
Greater Chennai Corporation approved the Layout in Planning Permission No. SD/WDCN15/00133/2021, dated 01.03.2021
The Member-Secretary/Joint Director, Coimbatore LPA issued Planning Permission in Letter RC No. 4804/2020/LPA, dated 11
The Assistant Director, T&CP, Theni Region accorded Technical sanction for issue of Planning Permission in Letter RC No. 1115
Technical sanction accorded for the Plot No.252F by the Member Secretary (i/c) Mamallapuram LPA, Mamallapuram vide Lett
Planning Permission issued by the Member-Secretary / Joint Director / Coimbatore LPA vide Letter No. 431/2021/LPA, dated
Technical sanction issued by the Director / Town and County Planning / Chennai vide Letter No. 22058/2019/TCP5, dated 06/
Technical sanction accorded by the Assistant Director, O/o. District Town and Country Planning, Thanjavur District vide Letter
Technical sanction accorded by the Assistant Director (i/c), O/o. District Town and Country Planning, Namakkal vide Letter No
Greater Chennai Corporation issued Building Permission No.SD/WDCN15/00584/2019, dated 26.02.2020
Technical sanction accorded by Assistant Director (i/c), O/o. District Town & Country Planning, Karur District vide Letter No. 1
Technical sanction accorded by Assistant Director, O/o. District Town & Country Planning, Karur District vide Letter No. 1183/
The Joint Director/Member Secretary, T&CP, Tiruchirappalli Region issued Planning Permission in Letter RC No.2525/2020/TR
The Director, T&CP, Chennai accorded Technical sanction for the Layout No. 54/2020 in Letter RC No. 9010/2020/TCP-6, date
CMDA issued by Planning Permission in Letter No.PP/NHRB/S(B1)/0408/2020, dated 08.01.2021. The Commissioner, Tambara
CMDA issued Planning Permission in Letter No. C3/13278/2012, dated 26.09.2013 & Renewed in Letter No. EC/C-I/14428/201
Planning Permission issued by the Senior Planner (APU)/CMDA/ Chennai vide Letter No. PP/NHRB/S(B2)/0443/2020, dated 13
The Member-Secretary (i/c) LPA accorded Technical sanction for the Layout No. 153/2018 in Letter RC No. 526/2018–TLPA, d
Greater Chennai Corporation issued Planning Permission in Letter No. PPA/WDCN07/04492/2020, dated 24.09.2020. Greater
The Director, T&CP, Chennai accorded Technical sanction in Letter RC No. 7850/2019/TCT-4, dated 17.12.2019. The Deputy D
The Deputy Director, T&CP, Dharmapuri Region accorded Technical sanction for the Layout No. 06/2019 in Letter RC No. 2828
Planning Permission issued by the Director, Town and Country Planning, Chennai District vide Letter No. 24177/2018/BA/TCP
Approval Details
Planning Permission issued by the Chief Planner(APU), CMDA, Chennai vide Letter No. PP/NHRB/S(B2)/0900/2019, dated 30/0
Planning Permission issued by the Member-Secretary / CMDA / Chennai Vide Letter No. B3/2729/2014, dated 02/01/2015. Bu
Technical sanction accorded by the Director, O/o. Directorate of Town and Country Planning / Chennai vide Letter No. 6612/2
Planning Permission issued by the Chief Planner / CMDA / Chennai vide Letter No. L1/11920/2020, dated 24/12/2020. Layout
Technical sanction accorded by Assistant Director, O/o. District Town and Country Planning, Namakkal District vide Letter No.
CMDA regularized the Layout No. PPD/Lo No. 1443/2019 in Letter No. Reg.Layout/8062/2018, dated 17.06.2019. The Executi
The Assistant Director, T&CP, Karur Region accorded Technical sanction for the Layout No. 12/2021 in Letter RC No. 1182/202
Regularisation Layout framework approved by the Senior Planner / CMDA/ Chennai vide Letter No. Reg/Layout/18217/2017,
Regularisation framework issued by the Assistant Director / Town and Country Planning / Chengalpattu Region vide Letter No
Planning Permission issued by CMDA in Letter No. C3(S)/494/2019, dated 27.08.2020. The Commissioner, St. Thomas Mount
The Deputy Director, Town & Country Planning (i/c), Tiruppur Region accorded Technical sanction for the Layout No.163/202
Planning Permission issued by the Member-Secretary (i/c), Coimbatore LPA vide Letter No. 930/2018/LPA-2, dated 07.12.201
Planning Permission issued by the Chief Planner, CMDA, Chennai vide Letter No.PP/NHRB/S(B2)/0525/2021, dated 02.03.202
Planning Permission issued by the Executive Engineer (T.P.), Greater Chennai Corporation, Chennai vide Letter No. PPA/WDCN
Planning Permission issued by the Executive Engineer (T.P.) / Greater Chennai Corporation / Chennai vide Letter No. PPA/WD
Planning Permission issued by the Chief Planner, CMDA, Chennai vide Letter No. PP/NHRB/C/309/2020, dated 09.10.2020. Bu
Planning Permission issued by the Member Secretary / CMDA / Chennai vide P.P No. C/PP/MSB/46(A to D)/2020, dated 21/12
Planning Permission issued by CMDA in Letter No.BC1/572/2017, dated 07.03.2018. Building Permission issued by Greater Ch
Greater Chennai Corporation issued Planning Permission in Letter No. PPA/WDCN14/04563/2020, dated 10.09.2020 and Build
Planning Permission issued by Member-Secretary, CMDA, Chennai vide Letter No. Reg.Layout/22881/2018, dated 16.10.2020
Regularisation Layout framework issued by the Member-Secretary(i/c), Mamallapuram LPA vide Letter No. 332/2018/MLPA, d
The Deputy Director, Town & Country Planning, Coimbatore Region accorded sanction for the Layout No. 543/2020 in Letter R
Deputy Director, Town & Country Planning, Coimbatore Region accorded Technical sanction for the Layout No. 324/2019 in L
Planning Permission issued by the Chief Planner, CMDA, Chennai vide Letter No. PP/NHRB/S(B2)/0523/2020, dated 02.03.202
Planning Permission issued by the Chief Planner, CMDA, Chennai-8 vide Letter No. PP/NHRB/S(B2)/0528/2020, dated 02.03.2
Planning Permission issued by the Assistant Director, O/o. District Town and Country Planning, Salem District vide Letter No. 5
Planning Permission issued by the Chief Planner, CMDA, vide Letter No. PP/NHRB/S(B2)/344/2020, dated 06.01.2021. Buildin
CMDA issued Planning Permission in Letter No. PP/NHRB/0515/2020, dated 17.11.2020. Greater Chennai Corporation issued
The Deputy Director, Town & Country Planning, Thanjavur Region accorded Technical sanction for the Layout No. 20/2019 in
Planning Permission issued by the Commissioner, Thiruverkadu Municipality, Thiruverkadu vide Letter No.ROC No.1233/2021
Planning Permission issued by the Chief Planner / Layout / CMDA / Chennai vide Letter No. L1/1346/2020, dated 06.11.2020.
Technical sanction accorded by Assistant Director, O/o. Town & Country Planning Tiruppur Region, Tiruppur vide Letter No. 1
Planning Permission issued by the Executive Engineer (T.P.)/ Greater Chennai Corporation / Chennai vide Letter No.SD/WDCN
CMDA approved the Layout in PPD/Lo No. 64/2020 in Letter No. L1/18799/2019, dated 17.08.2020. The Commissioner, St.Th
CMDA approved the Layout PPD/Lo No. 01/2021 in Letter No. L1/5710/2020, dated 05.01.2021. The Commissioner, Thiruverk
CMDA approved the Layout PPD/Lo No. 15/2020 in Letter No. L1/13197/2019, dated 20.02.2020. The Commissioner, Kundrat
The Director, Town & Country Planning, Chennai Region accorded Technical sanction for the Layout No. 51/2020 in Letter RC
Technical sanction approval letter issued by the Assistant Director, DTCP, Tiruppur Region, Letter No.685/2019/TD-1, dated 1
Planning Permission issued by Chief Planner, CMDA, Chennai vide Letter No. L1/9049/2020, dated 09.02.2021. Layout Permis
Technical sanction accorded by the Deputy Director/Member Secretary, O/o. District Town & Country Planning, Chengalpattu
Planning Permission issued by Executive Engineer ( T.P.) / Greater Chennai Corporation / Chennai vide Letter No. SD/WDCN14
Planning Permission issued by the Chief Planner, CMDA, vide Letter No. L1/11590/2020, dated 15.02.2021. Layout Permission
The Joint Director/Deputy Director (i/c), Ranipet Region issued Planning Permission in Letter RC No. 1215/2020/RD, dated 04.
CMDA issued Planning Permission in Letter No. PP/NHRB/C/1192/2019, dated 16.09.2020. The Commissioner, Thiruverkadu M
Approval Details
Planning Permission issued by the Member-Secretary (i/c), Coimbatore LPA vide PP.No. 32 A to O /2012 in Letter No. 7907/20
The Member Secretary (i/c), Coimbatore LPA issued Planning Permission No.108/2018 in Letter RC No.3058/2017/LPA-3, date
The Deputy Director, T&CP, Salem Region accorded Technical sanction for the Layout No. 880/2019 in Letter RC No. 733/2019
The Joint Director(VP)/Member Secretary/DTCP, Chengalpattu Region accorded Technical sanction for the Layout No. 38/202
The Commissioner, Thiruverkadu Municipality, approved sub-division of Plots in Proc.No. S.D(B.A)/11/2021, ROC No. 1163/20
The Deputy Director, Town & Country Planning, Chengalpattu Region accorded Technical sanction for the Layout No. 107/202
Planning Permission issued by the Assistant Director, DTCP, Tirunelveli vide Letter No. 5887/2020(2)/THD-3, dated 12.02.2021
Planning Permission issued by the Chief Planner ( MSB) / Layout/ CMDA / Chennai vide Letter No. L1/14646/2019, dated 11.1
Technical sanction & Planning Permission accorded by the Member-Secretary (i/c), O/o. District Town & Country Planning, Ka
Technical sanction accorded by the Deputy Director, O/o. District Town & Country Planning, Coimbatore District vide Letter N
Planning Permission issued by the Chief Planner, CMDA, Chennai vide Letter No. L1/8294/2020, dated 08.12.2020. Layout Per
Planning Permission issued by the Executive Engineer, Greater Chennai Corporation, vide Letter No. PPA/WDCN14/02590/202
Avadi City Municipal Corporation issued Planning Permit No.99642, dated 11.03.2021. Layout Permission issued by the Comm
Technical sanction issued by Deputy Director (i/c) Member-Secretary, O/o. District Town & Country Planning, MLPA Chengalp
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B1)/0524/2020, dated 27.02.2021. Greater Chennai Corporation i
CMDA issued Planning Permission in Letter No. PP/NHRB/S(B1)/0526/2020, dated 27.02.2021. Greater Chennai Corporation i
Planning Permission issued by the Member-Secretary, CMDA, Chennai vide Letter No. BC1/713/2017, dated 08.05.2018 and B
The Deputy Director (i/c), T&CP, Erode Region issued Building Permission in Letter RC No. 158/2020ER2, dated 26.08.2020. Th
Planning Permission issued by the Commissioner, Avadi Municipality vide Letter No. 012/01/3/20-21/0008945, dated 11.03.2
Planning Permission issued by Member-Secrtary (i/c), Kancheepuram LPA, Kancheepuram District vide Letter No.4179/2018/K
Technical sanction accorded by the Joint Director, Assistant Director (i/c), O/o. District Town & Country Planning, Kanyakuma
Planning Permission issued by the Deputy Planner, CMDA vide Letter No. Reg.Layout/7558/2018, dated 06.12.2019 and Layou
The Deputy Director, T&CP, Kancheepuram Region accorded Technical sanction for Layout No.28/2020 in Letter RC No.178/2
Technical sanction accorded by Assistant Director (i/c) Member-Secretary, O/o. District Town & Country Planning Chengalpatt
Project Completion Date
27.02.2023
09.05.2022
30.04.2022
31.12.2021
Completed
01.12.2023
01.12.2023
Completed
July 2025
December 2021
August 2025
March 2023
31.01.2023
30.11.2023
30.06.2021
January 2021
June 2021
31.03.2021
December 2022
Completed
March 2025
03.03.2022
14.05.2023
01.12.2024
09.12.2023
Block M, N, P, Q & R – 31.12.2025; Commercial Block 1 - 31.12.2023; Commercial Block 2 - 31.12.2021;
20.11.2025
14.09.2025
19.01.2025
Completed
Completed
Completed
Completed
31.01.2021
31.12.2021
June 2021
January 2021
31.03.2023
Completed
Completed
30.06.2023
30.12.2022
June 2022
31.01.2024
Completed
March 2022
30.06.2022
December 2021
Completed
Completed
Completed
31.12.2021
Completed
31.12.2021
20.12.2021
31.12.2021
31.07.2026
28.10.2025
30.06.2022
February 2022
Block-A: 27.09.2025, Block-B: 27.03.2025, Block-C: 27.09.2024, Block-D: 27.01.2024, Block-E: 27.10.2025
01.12.2023
31.05.2023
Completed
31.12.2022
Completed
June 2024
22.12.2022
November 2025
January 2025
31.12.2024
15.09.2023
30.06.2021
26.11.2022
30.06.2021
Completed
30.06.2021
Completed
Completed
Completed
31.12.2022
December 2023
31.05.2022
31.03.2021
30.07.2023
Completed
June 2022
December 2022
30.11.2021
November 2022
March 2022
24.08.2025
31.03.2022
Completed
31.05.2023
Completed
Completed
Completed
Completed
Completed
April 2023
December 2023
Completed
Completed
December 2025
June 2022
Completed
31.05.2022
30.06.2021
30.06.2021
31.12.2021
05.02.2024
Completed
Completed
Completed
June 2021
30.04.2022
January 2023
March 2023
28.02.2024
22.01.2023
31.12.2025
Completed
24.10.2025
December 2022
December 2022
January 2026
09.08.2025
December 2022
December 2025
30.07.2021
Completed
20.01.2022
Completed
Completed
31.12.2021
31.01.2024
31.07.2025
December 2022
31.03.2021
Completed
June 2023
31.08.2021
31.10.2023
November 2020
30.11.2021
30.11.2025
31.12.2021
Completed
30.06.2021
June 2022
Completed
Completed
31.05.2023
Completed
February 2026
Completed
Completed
Completed
28.02.2024
September 2022
May 2022
31.12.2021
November 2022
Completed
Completed
October 2022
Completed
30.06.2021
Completed
Completed
Completed
Completed
February 2022
31.05.2022
24.05.2025
31.03.2023
13.08.2025
11.01.2026
December 2025
May 2022
30.01.2026
31.12.2021
31.12.2025
30.12.2025
30.01.2023
Completed
March 2022
04.09.2021
July 2022
December 2022
07.01.2026
February 2023
March 2023
31.05.2023
31.05.2023
Completed
Completed
Completed
February 2024
31.05.2021
07.01.2026
31.12.2021
12.10.2025
June 2021
31.08.2022
March 2022
Completed
31.03.2023
17.02.2026
January 2025
Completed
Completed
Completed
Completed
Completed
Completed
October 2021
Completed
Project Completion Date
Completed
30.10.2021
31.08.2022
31.12.2026
December 2022
14.02.2022
December 2025
December 2022
December 2021
Completed
31.12.2023
Completed
Completed
31.08.2022
31.08.2022
10.11.2025
31.12.2023
January 2023
Completed
Completed
January 2022
Completed
31.05.2023
31.07.2022
Completed
Completed
Completed
Completed
November 2022
20.07.2021
Completed
10.06.2021
22.02.2026
30.12.2023
December 2023
Completed
December 2024
Completed
31.01.2026
Completed
Completed
30.03.2024
15.03.2023
Completed
Completed
30.08.2021
30.06.2022
30.06.2021
December 2022
31.08.2022
31.08.2022
07.05.2023
Completed
30.06.2021
December 2023
Completed
11.03.2023
November 2022
Completed
Other Details
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details-->
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details-->
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details-->
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area-->
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-13º2
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latit
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latit
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-12º-
Promoter Details--> Project Details--> Promoter & Project Details Approval Details
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º53’16.9”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º53’16.9”
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Location of Site: Latitude-13º.09’70.67”N;
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º.10’46.01
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Location of Site: Latitude-9º.72’03.52”N; Lo
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Location of Site: Latitude-9º.97’20.00”N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-13º.
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-10º2
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-13º.
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-13º.
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º.14N”; L
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Location of Site: Latitude-11º.19’29.4”N; Lo
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Location of Site: Latitude-13.197857N"; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-13º0
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latit
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13.197857N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º.49’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º.05’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º.96’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º.39’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Location of Site: Latitude-17º.9724879”N;
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Location of Site: Latitude-12º38’57.6”N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º98’14.40
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latit
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-9º-8
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º-10’N; L
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-13º-
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-12º4
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Location of Site: Latitude-13.10’64.22”; Lon
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-13º0
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-12º-
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º17’E; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º88’12.76
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11.13’32.30
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º98’E; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º-89’N; L
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º-58’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º-19’N; L
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-10º-
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º05’26.8”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º-05’N; L
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º-78’N; L
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º88’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º87’95.72
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12.87’70.9”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º10’; Lon
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º87’94.49
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12.54’20.03
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º09’58”N;
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º92’18.56
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º52’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º93’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º94’N; Lon
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º06’08.9”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º84’00.6”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º10’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º88’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º56’05.0”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-17º97’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º1214669
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11º0248596
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º09’03.62
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º57’02.7”N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º05’28.0”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º28’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º95’N; Lon
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º57’11.1”N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º26’N; Lon
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º39’18.09
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º59’43.5”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latit
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º08’15.15
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º48’32.69
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12.99’37.98
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º.09’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º88’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º5’N; Lon
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11º44’12.23
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11º35’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º.08’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13.3’15.24”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º20’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º93’N; Lon
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º22’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º78’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º08’05.44
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º08’05.44
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º56’05.0”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º54’40.4”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º96’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º96’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-9º11’21.2”N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º43’33.4”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º05’43”N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º83’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º56’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11º44”N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º17’01.0”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º96’12.14
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º13’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º48’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º54’09”N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11º07’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º22’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º50’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º99’74’85
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11º11’54.53
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º92’13”N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º3’N; Lon
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º94’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º57’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º01’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º86’89.4”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º4’3.23”N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º54’33.6”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º48’28.47
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º57’53.7”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º54’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º84’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º96’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º87’28.5”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details Approval Details Carpet Area Location of Site: Latitude-11º0
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11º03’29.5”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-11º11’54.53
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º70’33.14
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º3’55.73”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º86’94.79
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-8º42’34.5”N
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º06’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-8º13’N; Lon
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-10º53’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º92’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º87’28.5”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latitu
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Carpet Area--> Location of Site: Latit
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º05’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º49’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-17º97’N; Lo
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-13º06’16.3”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º54’1.34”
Promoter Details--> Project Details--> Promoter & Project Details--> Approval Details--> Location of Site: Latitude-12º43’N; Lo
Current Status of the Project

Completed
Progress of Work as on December 2020
Progress of Work as on December 2020
Completed

Progress of Work as on December 2020

Completed

Completed

Progress of Work as on March 2021


Progress of Work as on March 2021

Progress of Work as on March 2021

Progress of Work as on March 2021

Completed
Completed
Completed
Completed
Completed

Completed
Progress of Work as on March 2021
Completed
Completed

Progress of Work as on March 2021


tude-13º2’54.26”N; Longitude-80º11’11.77”E;
Completed
Progress of Work as on December 2020
Progress of Work as on March 2021
Progress of Work as on March 2021
Completed
Completed
Completed
70.67”N; Longitude-80º.06’32.66”E;
Completed
3.52”N; Longitude-77º.85’99.09”E;
0.00”N; Longitude-78º.18’66.67”E;
Progress of Work as on March 2021
Progress of Work as on March 2021
Progress of Work as on March 2021
Progress of Work as on March 2021
tude-13º.0879’N; Longitude-80º.1829’E;
Progress of Work as on March 2021
Progress of Work as on December 2020
Site: Latitude-13º-08’N; Longitude-80º-22’E;
Completed
29.4”N; Longitude-78º.47’41.1”E;
Completed
Progress of Work as on March 2021
tude-13º09’58.0’N; Longitude-80º12’31.4”E;
Site: Latitude-13º04’51.12”N; Longitude-80º24’11.44”E;
Site: Latitude-10º82’68.79”N; Longitude-78º71’51.36”E;
Site: Latitude-13º07’73.72”N; Longitude-80º14’61.31”E;
Progress of Work as on March 2021
3.197857N"; Longitude-79.795060E”;
2º.49’N; Longitude-77º.51’E”;
2º.05’N; Longitude-80º.07’E”;
Completed
2º.39’N; Longitude-80º.02’E”;
Completed
Completed
Completed
Site: Latitude-13º-57”N; Longitude-80º-06”E;
Progress of Work as on March 2021
tude-9º-88’N; Longitude-78º-11’E;
Progress of Work as on December 2020
Progress of Work as on March 2021
Completed
Progress of Work as on March 2021
Progress of Work as on March 2021
4.22”; Longitude-80.02’99.72”;
tude-13º04’00.7N”; Longitude-80.19’97.3E”;
Progress of Work as on March 2021
Progress of Work as on March 2021
Site: Latitude-13º03’38.2”N; Longitude-80º13’22.9”E;
Completed
Site: Latitude-12º99’55.45”N; Longitude-80º25’44.70”E;
Completed
Completed
Completed
Completed
Completed
Site: Latitude-13º-0”N; Longitude-80º-20’E;
Site: Latitude-13º-01’N; Longitude-80º-07’E;
Completed
Completed
Progress of Work as on December 2020
Progress of Work as on March 2021
Completed
Site: Latitude-12º44’48.6”N; Longitude-77º52’01.3”E;
3º05’26.8”N; Longitude-80º07’15.6”E;
3º-05’N; Longitude-80º-07’E;
2º-78’N; Longitude-80º-00’E;
Site: Latitude-12º52’N; Longitude-80º07’E;
Completed
Completed
Completed
3º10’; Longitude-80º11’;
Site: Latitude-13º04’48.58”N; Longitude-80º22’85.08”E;
Progress of Work as on March 2021
Site: Latitude-10º45’49.9N; Longitude-78º41’09.2”E;
Site: Latitude-12º94’01.91”N; Longitude-80º20’92.83”E;
Site: Latitude-11º40’N; Longitude-78º07’E;
2º87’94.49”N; Longitude-80º04’47.5”E;
Completed
Site: Latitude-11º40’N; Longitude-78º08’E;
Site: Latitude-13º06’34.3”N; Longitude-80º13’08.8”E;
Site: Latitude-10º45’51.6”N; Longitude-78º41’08.7”E;
Site: Latitude-12º97’N; Longitude-80º20’E;
Site: Latitude-12º54’51”N; Longitude-80º05’17”E;
Progress of Work as on March 2021
º09’58”N; Longitude-77º31’28”E;
2º92’18.56”N; Longitude-80º10’55.71”E;
Completed
0º93’N; Longitude-79º33’E;
Completed
Completed
2º84’00.6”N; Longitude-80º15’75.9”E;
Site: Latitude-11º038’77.019”N; Longitude-11º038’77.020”E;
Site: Latitude-12º84’40.01”N; Longitude-80º16’74.72”E;
Site: Latitude-12º55’25.55.51”N; Longitude-80º8’24.11.77"E;
3º10’N; Longitude-80º03’E;
Completed
Progress of Work as on March 2021
Completed
Site: Latitude-9º26’20.8”N; Longitude-77º26’28.6”E;
7º97’N; Longitude-82º85’E;
2º1214669’N; Longitude-79º9121297’E;
1º0248596'N; Longitude-77º1077583'E;
0º09’03.62”N; Longitude-78º75’57.31”E;
Completed
3º05’28.0”N; Longitude-80º07’12.7”E;
Site: Latitude-13º21’N; Longitude-79º61’E;
Completed
Completed
Site: Latitude-11º48’31.60”N; Longitude-77º47’32.12”E;
Completed
Progress of Work as on March 2021
Completed
Completed
Completed
Progress of Work as on March 2021
Site: Latitude-13º02’N; Longitude-80º09’E;
Site: Latitude-10º74’N; Longitude-79º10’E;
3º08’15.15”N; Longitude-80º13’82.18”E;
2º48’32.69”N; Longitude-80º12’7.66”E;
Completed
Completed
Site: Latitude-13º05’N; Longitude-80º09’E;
Completed
3º5’N; Longitude-80º07’E;
Completed
Completed
Completed
Completed
Site: Latitude-10º38’37.51”N; Longitude-77º96’60.37”E;
Site: Latitude-12º57’41"N; Longitude-80º12’46”E;
Site: Latitude-11º01’46.3”N; Longitude-77º00’19.5”E;
Site: Latitude-12º57’41"N; Longitude-80º12’46”E;
Site: Latitude-13º04’09”N; Longitude-80º20’01”E;
Site: Latitude-13º02’47.1”N; Longitude-80º08’54.7”E;
Progress of Work as on March 2021
Site: Latitude-12º53’N; Longitude-79º07’E;
3º20’N; Longitude-80º08’E;
º93’N; Longitude-78º18’E;
2º22’N; Longitude-80º05’E;
3º78’N; Longitude-77º85’E;
Site: Latitude-12º56’N; Longitude-80º12’E;
Completed
3º08’05.44”N; Longitude-80º14’76.06”E;
2º56’05.0”N; Longitude-80º15’10.3”E;
Site: Latitude-11º01’10.2”N; Longitude-76º52’35.2”E;
Site: Latitude-10º04’N; Longitude-77º33’E;
Site: Latitude-12º81’N; Longitude-80º21’E;
Site: Latitude-11º01’N; Longitude-76º52’E;
Site: Latitude-12º50’N; Longitude-80º13’E;
Site: Latitude-10º43’N; Longitude-79º40’E;
Site: Latitude-11º20’N; Longitude-77º45’E;
Completed
Completed
Completed
Site: Latitude-10º48’46.5”N; Longitude-78º39’26.0”E;
º11’21.2”N; Longitude-77º31’32.0”E;
Site: Latitude-12º55’26.1”N; Longitude-80º08’37.3”E;
Site: Latitude-13º00’27.3”N; Longitude-80º06’40.4”E;
Site: Latitude-12º54’N; Longitude-80º11’E;
0º43’33.4”N; Longitude-79º04’48.20”E;
Site: Latitude-13º6’30.996”N; Longitude-80º12’27.3996”E;
Site: Latitude-11º33’1466”N; Longitude-77º67’5698”E;
Completed
Site: Latitude-11º00”N; Longitude-77º00”E;
Site: Latitude-12º59’40.5”N; Longitude-80º07’00.8”E;
Site: Latitude-12º95”N; Longitude-80º20”E;
Completed
Completed
Completed
Completed
Completed
Completed
3º13’N; Longitude-80º10’E;
Completed
Progress of Work as on March 2021
Completed
1º07’N; Longitude-77º02’E;
Site: Latitude-12º95’N; Longitude-80º21’E;
Site: Latitude-13º11”N; Longitude-80º18”E;
Site: Latitude-12º94”N; Longitude-80º20”E;
Site: Latitude-13º03”N; Longitude-80º21”E;
Site: Latitude-13º01”N; Longitude-80º12”E;
Site: Latitude-13º04’13.73”N; Longitude-80º19’68.61”E;
Site: Latitude-12º57’28”N; Longitude-80º12’11”E;
Completed
2º50’N; Longitude-80º14’E;
Completed
Completed
Site: Latitude-12º95’N; Longitude-80º21’E;
Site: Latitude-12º91’N; Longitude-80º20’E;
Site: Latitude-11º39”N; Longitude-78º09”E;
Site: Latitude-12º96”N; Longitude-80º19”E;
Site: Latitude-13º08’19"N; Longitude-80º24’39"E;
Completed
Completed
2º94’N; Longitude-80º05’E;
Completed
3º01’N; Longitude-80º15’E;
2º86’89.4”N; Longitude-80º19’58.6”E;
Completed
Completed
Completed
Completed
2º54’N; Longitude-80º12’E;
2º84’N; Longitude-80º16’E;
Completed
2º87’28.5”N; Longitude-80º20’00.8”E;
Site: Latitude-13º6’30.996”N; Longitude-80º12’27.3996”E;
Site: Latitude-13º06’79.08”N; Longitude-80º14’60.82”E;
Site: Latitude-12º81’09.86”N; Longitude-80º20’17.06”E;
Completed
1º03’29.5”N; Longitude-76º57’14.5”E;
Completed
2º70’33.142”N; Longitude-80º22’24.824”E;
Completed
Completed
º42’34.5”N; Longitude-77º38’02.5”E;
3º06’N; Longitude-80º01’E;
Completed
Completed
2º92’N; Longitude-80º08’E;
Site: Latitude-12º94’96”N; Longitude-80º20’54”E;
2º87’28.5”N; Longitude-80º20’00.8”E;
Site: Latitude-12º48’N; Longitude-80º13’E;
Site: Latitude-12º95’43.97”N; Longitude-80º21’13.66”E;
Site: Latitude-12º95’54.97”N; Longitude-80º21’09.89”E;
Site: Latitude-13º02’N; Longitude-80º14’E;
Completed
3º05’N; Longitude-80º07’E;
2º49’N; Longitude-79º40’E;
Completed
3º06’16.3”N; Longitude-80º01’22.”E;
2º54’1.34”N; Longitude-80º3’25.75”E;
Completed