Bar Chart Showing the Current Activites of the Different Items & Complition Schedules

Priority 1 :- (HKL STATION)Complition Date :- DEC-2023


Client : Western Railway
Agency : M/s. SRC-ENRICH-VRR (JV), Hyderabad.
Name of Work : Composite tender for execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway line involving (i) Engineering works
in in yards and (ii) Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of works as mentioned in tender document.

2022 2023
Sr. Approx. Balanced to % of
No. Description of Works Unit Scope Work Done be Done Date of Start Date of Finish Progess Remarks
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

1 PLATFORM WORK (PF


WALL)

A PF No. 01 (165.43m X
7.62m) Extention Mtr. 165.43 0.00 165.43 01-05-2023 30-05-2023 0%

PF No. 02 (600.00m X
B 6.10m) Mtr. 600.00 530.00 70.00 15-07-2022 31-03-2023 88%

C PF Rising Work at PF No. Mtr. 434.57 434.57 0.00 05-11-2022 30-11-2022 100%
1
2 TOILET BLOCK

A At PF No. 01 Nos. 1 0 1.00 12/1/2022 31-03-2023 90%

B At PF No. 02 Nos. 1 0 1.00 5/1/2023 30-06-2023 0%

3 WATER HUT

A At PF No. 01 Nos. 3 0 3.00 7/1/2023 7/15/2023 0%

B At PF No. 02 Nos. 2 0 2.00 7/1/2023 7/15/2023 0%


PLATFORM
4 SHELTER/COVERING
SHED
Drawing not
A At PF No. 01
(32.00x7.15m.) Mtr. 32.00 0 32.00 0% yet received

At PF No. 02 (64.00x6.10 Drawing not


B m.) Mtr. 64.00 0 64.00 0% yet received

5 BOUNDARYWALL/
OTHER WALLS

A PF No. 01 Back Wall Mtr. 600.00 190.00 410.00 10/1/2022 7/30/2023 32%

6 STATION BUILDING

A At
Ch. 28.97 towards
Nos. 1 0 1.00 2/10/2023 10/30/2023 15%
NMH End

7 QUARTERS

A Type II Quarters Nos. 12 0 12.00 12/1/2022 10/30/2023 45%


2022 2023
Sr. Description of Works Unit Approx. Work Done Balanced to Date of Start Date of Finish % of Remarks
No. Scope be Done Progess JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

B Type III Quarters Nos. 5 0 5.00 2/1/2023 10/30/2023 10%


Drawing not
C Type IV Quarters Nos. 1 0 1.00 0% yet received

8 EARTH FILLING

A At PF No. 01 CUM 2500.00 0.00 2500.00 6/1/2023 6/30/2023 45%

B At PF No. 02 CUM 25000.00 0.00 25000.00 7/1/2022 4/30/2023 74%

9 ROADS

A Behind PF No. 01 Mtr. 450.00 135.00 315.00 5/1/2023 10/30/2023 30%

B Behind PF No. 02 Mtr. 100.00 0.00 100.00 5/1/2023 10/30/2023 0%

10 CABLE TRENCH & DRAIN

A Cable Trench Work at PF Mtr. 600.00 90.00 510.00 9/1/2022 7/30/2023 15%
No. 01
B Cable
Trench Work at PF Mtr.
600.00 0.00 600.00 5/1/2023 7/30/2023 0%
No. 02
11 FOOT OVER BRIDGE
Drawing not
A At
Ch. 200 Mtr. Towards Nos.
NMH 1 0 1.00 0% yet received

12 OTHER WORKS

A Garden Renovation Nos. 0 0.00 4/1/2023 10/30/2023 0%


Circulating Area
B Renovation Nos. 0 0.00 4/1/2023 10/30/2023 0%

13 Minor Bridges
Drawing not
A Minor Bridges Nos. 2 0 2.00 0% yet received
14 Formation Work
Earth Work TWO is
A m 945 0 945.00 4/30/2023 0%
required
Blanketing
B m 1980 0 1980.00 4/30/2023 0%
Supply of Ballast
c cum 5000 1500 3500.00 10/1/2022 4/30/2023 30%
Tansportation of
D Sleepers(Normal) nos 3180 3180 0.00 10/1/2022 12/31/2022 100%
Tansportation of
E Sleepers(Turnout) Set 3 3 0.00 10/1/2022 12/31/2022 100%

15 Track Work
Ballast Bed Prepration
A m 1980 0 1980.00 0%
4/30/2023
2022 2023
Sr. Description of Works Unit Approx. Work Done Balanced to Date of Start Date of Finish % of Remarks
No. Scope be Done Progess JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Track Linking
B m 1980 0 1980.00 0%
4/30/2023
Laying Turnout
c Set 3 0 3.00 0%
4/30/2023
Bar Chart Showing the Current Activites of the Different Items & Complition Schedules
Priority 1 :- (MLG STATION) Complition Date :- DEC-2023
Client : Western Railway
Agency : M/s. SRC-ENRICH-VRR (JV), Hyderabad.
Name of Work : Composite tender for execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway line involving (i) Engineering works in in yards and (ii)
Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of works as mentioned in tender document.

Sr. % of 2022 2023


No Description of Works Unit Approx. Work Done Balanced Date of Start Date of Finish Proges Remarks
Scope to be Done
. s JULY AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC

PLATFORM WORK (PF


1
WALL)
PF No. 01 (600.00m X
A Mtr. 600 0 600.00 0%
7.15m)

B PF No. 02 (600.00m X Mtr. 600.00 500 100.00 15/08/2022 31/03/2023 83%


6.10m)

2 TOILET BLOCK

A At PF No. 01 Nos. 1 1 0.00 12/1/2022 2/28/2023 98%

B At PF No. 02 Nos. 1 1 0.00 12/1/2022 3/30/2023 95%

3 WATER HUT

A At PF No. 01 Nos. 3 0 3.00 7/1/2023 7/15/2023 0%

B At PF No. 02 Nos. 2 0 2.00 7/1/2023 7/15/2023 0%

PLATFORM
4 SHELTER/COVERING
SHED
Drawing not yet
A At PF No. 01 (32x7.15 Mtr. 32 0 32.00 0%
received
m.)
Drawing not yet
B At PF No. 02 Mtr. 64 0 64.00 0%
received
(64.00x6.10 m.)

5 BOUNDARYWALL/
OTHER WALLS
A PF No. 01 Back Wall Mtr. 600.00 0.00 600.00 2/1/2023 7/30/2023 0%

B Compund Wall Mtr. 300.00 300.00 0.00 10/1/2022 7/30/2023 100%

6 STATION BUILDING
At Ch. 28.97 towards
A RTM End Nos. 1 0 1.00 12/1/2022 10/30/2023 40%

7 QUARTERS

A Type II Quarters Nos. 12 0 12.00 12/1/2022 10/30/2023 40%

B Type III Quarters Nos. 5 0 5.00 4/1/2023 10/30/2023 0%

Drawing not yet


C Type IV Quarters Nos. 1 0 1.00 0%
received
Sr. % of 2022 2023
Approx. Balanced
No Description of Works Unit Scope Work Done to be Done Date of Start Date of Finish Proges Remarks
. s JULY AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC

8 OFFICE/STORE/OTHER
BUILDING

A PMC Office Nos. 1 1 0.00 7/1/2022 11/30/2022 100%

B Store Room Nos. 1 1 0.00 8/1/2022 1/30/2022 100%

9 EARTH FILLING

A At PF No. 01 CUM 1500.00 0.00 1500.00 6/1/2023 6/30/2023 0%

B At PF No. 02 CUM 4000.00 0.00 4000.00 12/1/2022 4/30/2023 65%

10 ROADS

A Behind PF No. 01 Mtr. 600.00 450.00 150.00 1/1/2023 6/30/2023 75%

11 CABLE TRENCH & DRAIN

A Cable Trench Work at Mtr. 600.00 230.00 370.00 10/1/2022 6/30/2023 38%
PF No. 01

B Cable Trench Work at Mtr. 600.00 80.00 520.00 6/30/2023 13%


PF No. 02 3/1/2022
12 FOOT OVER BRIDGE
At ch. 100.00 Mtr. Drawing not yet
A Nos. 1 0 1.00 0%
received
Towards RTM
13 OTHER WORKS

A Garden Renovation Nos. 1 0 1.00 9/1/2022 6/30/2023 50%

B Circulating Area Nos. 1 0 1.00 9/1/2022 6/30/2023 50%


Renovation
14 Minor Bridges
A Minor Bridges Nos. Drawing not yet
1 0 1 0 received

15 Formation Work
Earth Work TWO is
A m 945 0 945.00 4/30/2023 0%
required
Blanketing
B m 2445 0 2445.00 4/30/2023 0%

Supply of Ballast
c cum 6000 4500 1500.00 10/1/2022 4/30/2023 75%

Tansportation of
D Sleepers(Normal) nos 3960 3960 0.00 10/1/2022 12/31/2022 100%

Tansportation of
E Sleepers(Turnout) Set 7 7 0.00 10/1/2022 12/31/2022 100%

16 Track Work
Ballast Bed Prepration
A m 2446 0 2446.00 4/30/2023 0%

B Track Linking m 2446 0 2446.00 4/30/2023 0%


Sr. % of 2022 2023
Approx. Balanced
No Description of Works Unit Scope Work Done to be Done Date of Start Date of Finish Proges Remarks
. s JULY AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC

c Laying Turnout Set 7 0 7.00 4/30/2023 0%


Bar Chart Showing the Current Activites of the Different Items & Complition Schedules
Priority 2 :- (PIP STATION) Complition Date :- AUG-2024
Client : Western Railway
Agency : M/s. SRC-ENRICH-VRR (JV), Hyderabad.
Name of Work : Composite tender for execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway line involving (i) Engineering works in in yards
and (ii) Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of works as mentioned in tender document.

2022 2023 2024


Sr. Approx. Balanced to % of
No Description of Works Unit Work Done Date of Start Date of Finish Proges Remarks
. Scope be Done s JU A SE O N DE JA FE M AP M JU JU A SE O N DE JA FE M AP M JU JU A
L U P CT O C N B A R AY N L U P CT O C N B A R AY N L U
G V R G V R G

1 PLATFORM WORK (PF WALL)

A PF No. 01 (600m X 8.00m) Mtr. 600.00 0 600.00 01-03-2023 31-05-2023 0%

B PF No. 02 (600m X 6.10m) Mtr. 600.00 600 0.00 01/08/2022 31/05/2023 100%

TOILET BLOCK/FEBRICATED
2 TOILET

A At PF No. 01 Nos. 1 0 1.00 2/1/2023 3/30/2023 60%

3 WATER HUT

A At PF No. 01 Nos. 2 0 2.00 3/1/2024 3/15/2024 0%

B At PF No. 02 Nos. 2 0 2.00 3/1/2024 3/15/2024 0%

4 PLATFORM SHELTER/COVERING
SHED
Drawing not yet
A At PF No. 01 (64x8.00m.) Mtr. 128 0 128.00 0% received
(64.00x8.00m)
Drawing not yet
B At PF No. 02 (64.00x6.10 m.) Mtr. 64 0 64.00 0% received

5 BOUNDARYWALL/OTHER WALLS

A PF No. 01 Back Wall Mtr. 600.00 80.00 0 4/1/2023 12/31/2023 13%

A PF No. 02 FENCING Mtr. 600.00 0.00 0 4/1/2023 12/31/2023 0%

6 STATION BUILDING

A At Ch. 33.50 towards RTM End Nos. 1 0 1.00 12/1/2022 4/30/2024 40%

7 QUARTERS

A Type II Quarters Nos. 18 0 18.00 12/1/2022 4/30/2024 30%

B Type III Quarters Nos. 6 0 6.00 3/1/2023 4/30/2024 0%


Drawing not yet
C Type IV Quarters Nos. 2 0 2.00 0% received

8 EARTH FILLING
2022 2023 2024
Sr. % of
No Description of Works Unit Approx. Work Done Balanced to Date of Start Date of Finish Proges Remarks
Scope be Done A N M A N M A
. s JU U SE O O DE JA FE A AP M JU JU U SE O O DE JA FE A AP M JU JU U
L G P CT V C N B R R AY N L G P CT V C N B R R AY N L G

A At PF No. 01 CUM 600.00 0.00 600.00 12/1/2023 12/30/2023 0%

B At PF No. 02 CUM 1500.00 900.00 600.00 7/1/2023 11/30/2023 60%

9 ROADS

A Behind PF No. 01 Mtr. 500.00 0.00 500.00 11/1/2023 4/30/2024 0%

10 CABLE TRENCH & DRAIN

A Cable Trench Work at PF No. 01 Mtr. 600.00 400.00 200.00 10/1/2022 10/30/2023 67%

B Cable Trench Work at PF No. 02 Mtr. 600.00 0.00 600.00 3/1/2022 3/30/2023 0%

12 FOOT OVER BRIDGE


Drawing not yet
A At ch. 100.00 Mtr. Towards RTM Nos. 1 0 1.00 0% received

11 OTHER WORKS

A Garden Renovation Nos. 0 0.00 8/1/2023 5/30/2024 0%

B Circulating Area Renovation Nos. 0 0.00 8/1/2023 5/30/2024 0%

14 Minor Bridges
A Minor Bridges Nos. Drawing not yet
1 0 1 0 received

15 Formation Work
Earth Work
A m 945 0 945.00 5/30/2024 0% TWO is required
Blanketing
B m 2350 0 2350.00 5/30/2024 0%
Supply of Ballast
c cum 6000 0 6000.00 5/30/2024 0%
Tansportation of Sleepers(Normal)
D nos 3790 3790 0.00 12/31/2022 100%
Tansportation of
E Sleepers(Turnout) Set 9 9 0.00 12/31/2022 100%

16 Track Work
Ballast Bed Prepration
A m 2350 0 2350.00 5/30/2024 0%
Track Linking
B m 2350 0 2350.00 5/30/2024 0%
Laying Turnout
c Set 9 0 9.00 5/30/2024 0%
Bar Chart Showing the Current Activites of the Different Items & Complition Schedules
Priority 2 :- (MDS STATION) Complition Date :- AUG-2024
Client : Western Railway
Agency : M/s. SRC-ENRICH-VRR (JV), Hyderabad.
Name of Work : Composite tender for execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway line involving (i) Engineering works in in
yards and (ii) Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of works as mentioned in tender document.

2022 2023 2024


Sr. Approx. Work Balanced % of
Description of Works Unit to be Date of Start Date of Finish Proges Remarks
No. Scope Done Done s JU A SE O N DE JA FE M AP M JU JU A SE O N DE JA FE M AP M JU JU A
L U P CT O C N B A R AY N L U P CT O C N B A R AY N L U
G V R G V R G

1 PLATFORM WORK (PF WALL)

A PF No. 01 (547.88m X 6.10m) Mtr. 547.88 0.00 547.88 01-06-2023 31-07-2023 0%

B PF No. 02 (600.00m X 11.00m) Mtr. 600.00 0.00 600.00 01/04/2023 31/05/2023 0%

TOILET BLOCK/FEBRICATED
2 TOILET

A At PF No. 02 Nos. 1.00 0.00 1.00 1/1/2023 3/30/2023 94%

3 WATER HUT

A At PF No. 01 Nos. 4.00 0.00 4.00 3/1/2024 3/15/2024 0%

B At PF No. 02 Nos. 9.00 0.00 9.00 3/1/2024 3/15/2024 0%

4 PLATFORM SHELTER/COVERING
SHED
At PF No. 01 (48x6.10 m.) Drawing not yet received
A Mtr. 148.00 0.00 148.00 0%
(100x6.10m)
Drawing not yet received
B At PF No. 02 (64.00x11.00 m.) Mtr. 64.00 0.00 64.00 0%

5 BOUNDARYWALL/OTHER WALLS

A PF No. 02 Back Wall Mtr. 600.00 310.00 0 10/1/2022 12/31/2023 52%

B RE Wall Behind Store Mtr. 70.00 60.00 0 9/1/2022 10/31/2023 86%

6 STATION BUILDING
Drawing not yet received
A At Ch. 136.11 towards RTM End Nos. 1.00 0.00 1.00 0%

7 QUARTERS
Drawing not yet received
A Type II Quarters Nos. 24.00 0.00 24.00 0%
Drawing not yet received
B Type III Quarters Nos. 11.00 0.00 11.00 0%
Drawing not yet received
C Type IV Quarters Nos. 2.00 0.00 2.00 0%

8 OFFICE/STORE/OTHER BUILDING
2022 2023 2024
Balanced % of
Sr. Description of Works Unit Approx. Work to be Date of Start Date of Finish Proges Remarks
No. Scope Done A N M A N M A
Done s JU U SE O O DE JA FE A AP M JU JU U SE O O DE JA FE A AP M JU JU U
L G P CT V C N B R R AY N L G P CT V C N B R R AY N L G

A PMC Office Nos. 1 1 0.00 7/1/2022 11/30/2022 100%

B Store Room Nos. 1 1 0.00 8/1/2022 40%


Superstructure Drawing
not yet received

8 EARTH FILLING

A At PF No. 01 CUM 600.00 0.00 600.00 12/1/2023 12/30/2023 0%

B At PF No. 02 CUM 3000.00 2000.00 1000.00 7/1/2023 11/30/2023 67%

9 ROADS

A Behind PF No. 02 Mtr. 600.00 258.00 342.00 2/1/2023 4/30/2024 43%

10 CABLE TRENCH & DRAIN

A Cable Trench Work at PF No. 01 Mtr. 547.88 0.00 547.88 7/1/2023 1/30/2024 0%

B Cable Trench Work at PF No. 02 Mtr. 600.00 330.00 270.00 10/1/2022 1/30/2024 55%

12 FOOT OVER BRIDGE


Drawing not yet received
A At ch. 100.00 Mtr. Towards RTM Nos. 1 0 1.00 0%

11 OTHER WORKS

A Garden Renovation Nos. 1 0 1.00 8/1/2023 5/30/2024 0%

B Circulating Area Renovation Nos. 1 0 1.00 8/1/2023 5/30/2024 0%

15 Formation Work
Earth Work
A m 1100 0 1100.00 5/30/2024 0% TWO is required
Blanketing
B m 3600 0 3600.00 5/30/2024 0%
Supply of Ballast
c cum 9000 0 9000.00 5/30/2024 0%
Tansportation of Sleepers(Normal)
D nos 4100 800 3300.00 12/31/2022 20%
Tansportation of
E Sleepers(Turnout) Set 16 0 16.00 12/31/2022 0%

16 Track Work
Ballast Bed Prepration
A m 3600 0 3600.00 5/30/2024 0%
Track Linking
B m 3600 0 3600.00 5/30/2024 0%
Laying Turnout
c Set 16 0 16.00 5/30/2024 0%
Bar Chart Showing the Current Activites of the Different Items & Complition Schedules
Priority 3 :- (DLD STATION) Complition Date :- JAN-2025
Client : Western Railway
Agency : M/s. SRC-ENRICH-VRR (JV), Hyderabad.
Name of Work : Composite tender for execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway line involving (i) Engineering works in in yards and (ii)
Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of works as mentioned in tender document.

2022 2023 2024 2025


Sr. Approx. Work Balanced % of
No. Description of Works Unit Scope Done to be Date of Start Date of Finish Proges A N M A N M A N Remarks
Done s JU U SE O O DE JA FE A AP M JU JU U SE O O DE JA FE A AP M JU JU U SE O O DE JAN
L G P CT V C N B R R AY N L G P CT V C N B R R AY N L G P CT V C

1 PLATFORM WORK (PF WALL)

A PF No. 01 (600.00m X 6.10m) Mtr. 600.00 450 150.00 01-06-2023 31-07-2023 75%

B PF No. 02 (547.50m X 7.50m) Mtr. 547.50 0 547.50 01/10/2023 31/05/2024 0%


Goods Platform (700.00m X
C 11.00m) Mtr. 700.00 330 370.00 01/04/2023 31/07/2023 47%

2 TOILET BLOCK/FEBRICATED
TOILET

A At PF No. 01 Nos. 1.00 0.00 1.00 4/1/2024 4/30/2024 0%

3 WATER HUT

A At PF No. 01 Nos. 2 0 2.00 8/1/2024 8/15/2024 0%

B At PF No. 02 Nos. 2 0 2.00 8/1/2024 8/15/2024 0%

PLATFORM SHELTER/COVERING
4 SHED
Drawing not yet received
A At PF No. 01 (96.00x6.10 m.) Mtr. 96 0 96.00 0%
Drawing not yet received
B At PF No. 02 (96.00x6.10 m.) Mtr. 96 0 96.00 0%

C At Goods Platform (700x11.00 m.) Mtr. 700 0

5 BOUNDARYWALL/OTHER WALLS

A PF No. 01 Back Wall Mtr. 600.00 0.00 0 4/1/2023 12/31/2023 0%

B PF No. 02 Back Wall Mtr. 547.50 0.00 0 7/1/2023 5/31/2024 0%

C Goods Platform Back Wall Mtr. 700.00 0.00 10/1/2023 8/31/2024

6 STATION BUILDING

A At Ch. 45.99 towards NMH End Nos. 1 0 1.00 3/1/2023 9/30/2024 0%

7 QUARTERS

B Type II Quarters (G) Nos. 11 0 11.00 12/1/2022 5/30/2022 25%

C Type III Quarters Nos. 6 0 6.00 5/1/2023 8/31/2024 0%


2022 2023 2024 2025
Sr. Approx. Work Balanced % of
No. Description of Works Unit Scope Done to be Date of Start Date of Finish Proges A N M A N M A N Remarks
Done s JU U SE O O DE JA FE A AP M JU JU U SE O O DE JA FE A AP M JU JU U SE O O DE JAN
L G P CT V C N B R R AY N L G P CT V C N B R R AY N L G P CT V C
Drawing not yet received
D Type IV Quarters Nos. 1 0 1.00 0%

8 OFFICE/STORE/OTHER BUILDING
Drawing not yet received
A Labour Room Nos. 1 0 1.00 0%

Drawing not yet received


B Traders Room Nos. 1 0 1.00 0%

Drawing not yet received


C RPF Thana Nos. 1 0 1.00 0%

8 EARTH FILLING

A At PF No. 01 CUM 3500.00 0.00 3500.00 12/1/2023 12/30/2023 0%

B At PF No. 02 CUM 3200.00 0.00 3200.00 7/1/2023 11/30/2023 0%

C Goods PF CUM 5000.00 0.00 5000.00 7/1/2023 11/30/2023 0%

9 ROADS

A At PF No. 01 Mtr. 250.00 0.00 250.00 5/1/2023 7/30/2024 0%

B. At Behind Goods PF Mtr. 700.00 0.00 700.00 5/1/2023 9/30/2024 0%

10 CABLE TRENCH & DRAIN

A Cable Trench Work at PF No. 01 Mtr. 600.00 0.00 0% 8/1/2023 8/30/2024 0%

B Cable Trench Work at PF No. 02 Mtr. 547.50 0.00 0% 9/1/2023 9/30/2024 0%

12 FOOT OVER BRIDGE


Drawing not yet received
A At ch. 100.00 Mtr. Towards RTM Nos. 1 0 1.00 0%

11 OTHER WORKS

A Garden Renovation Nos. 1 0 1.00 8/1/2023 5/30/2024 0%

B Circulating Area Renovation Nos. 1 0 1.00 8/1/2023 5/30/2024 0%

15 Formation Work
Earth Work
A m 2334 0 2334.00 10/30/2024 0% TWO is required
Blanketing
B m 3134 0 3134.00 10/30/2024 0%
Supply of Ballast
c cum 7835 0 7835.00 10/30/2024 0%
Tansportation of Sleepers(Normal)
D nos 5000 3000 2000.00 12/31/2022 60%
Tansportation of
E Sleepers(Turnout) Set 18 18 0.00 12/31/2022 100%

16 Track Work
Ballast Bed Prepration
A m 3134 0 3134.00 10/30/2024 0%
Track Linking
B m 3134 0 3134.00 10/30/2024 0%
2022 2023 2024 2025
Sr. Approx. Work Balanced % of
No. Description of Works Unit Scope Done to be Date of Start Date of Finish Proges A N M A N M A N Remarks
Done s JU U SE O O DE JA FE A AP M JU JU U SE O O DE JA FE A AP M JU JU U SE O O DE JAN
L G P CT V C N B R R AY N L G P CT V C N B R R AY N L G P CT V C
Laying Turnout
c Set 18 0 18.00 10/30/2024 0%