2022 2023
Sr. Approx. Balanced to % of
No. Description of Works Unit Scope Work Done be Done Date of Start Date of Finish Progess Remarks
JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
A PF No. 01 (165.43m X
7.62m) Extention Mtr. 165.43 0.00 165.43 01-05-2023 30-05-2023 0%
PF No. 02 (600.00m X
B 6.10m) Mtr. 600.00 530.00 70.00 15-07-2022 31-03-2023 88%
C PF Rising Work at PF No. Mtr. 434.57 434.57 0.00 05-11-2022 30-11-2022 100%
1
2 TOILET BLOCK
3 WATER HUT
5 BOUNDARYWALL/
OTHER WALLS
A PF No. 01 Back Wall Mtr. 600.00 190.00 410.00 10/1/2022 7/30/2023 32%
6 STATION BUILDING
A At
Ch. 28.97 towards
Nos. 1 0 1.00 2/10/2023 10/30/2023 15%
NMH End
7 QUARTERS
8 EARTH FILLING
9 ROADS
A Cable Trench Work at PF Mtr. 600.00 90.00 510.00 9/1/2022 7/30/2023 15%
No. 01
B Cable
Trench Work at PF Mtr.
600.00 0.00 600.00 5/1/2023 7/30/2023 0%
No. 02
11 FOOT OVER BRIDGE
Drawing not
A At
Ch. 200 Mtr. Towards Nos.
NMH 1 0 1.00 0% yet received
12 OTHER WORKS
13 Minor Bridges
Drawing not
A Minor Bridges Nos. 2 0 2.00 0% yet received
14 Formation Work
Earth Work TWO is
A m 945 0 945.00 4/30/2023 0%
required
Blanketing
B m 1980 0 1980.00 4/30/2023 0%
Supply of Ballast
c cum 5000 1500 3500.00 10/1/2022 4/30/2023 30%
Tansportation of
D Sleepers(Normal) nos 3180 3180 0.00 10/1/2022 12/31/2022 100%
Tansportation of
E Sleepers(Turnout) Set 3 3 0.00 10/1/2022 12/31/2022 100%
15 Track Work
Ballast Bed Prepration
A m 1980 0 1980.00 0%
4/30/2023
2022 2023
Sr. Description of Works Unit Approx. Work Done Balanced to Date of Start Date of Finish % of Remarks
No. Scope be Done Progess JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Track Linking
B m 1980 0 1980.00 0%
4/30/2023
Laying Turnout
c Set 3 0 3.00 0%
4/30/2023
Bar Chart Showing the Current Activites of the Different Items & Complition Schedules
Priority 1 :- (MLG STATION) Complition Date :- DEC-2023
Client : Western Railway
Agency : M/s. SRC-ENRICH-VRR (JV), Hyderabad.
Name of Work : Composite tender for execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway line involving (i) Engineering works in in yards and (ii)
Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of works as mentioned in tender document.
2 TOILET BLOCK
3 WATER HUT
PLATFORM
4 SHELTER/COVERING
SHED
Drawing not yet
A At PF No. 01 (32x7.15 Mtr. 32 0 32.00 0%
received
m.)
Drawing not yet
B At PF No. 02 Mtr. 64 0 64.00 0%
received
(64.00x6.10 m.)
5 BOUNDARYWALL/
OTHER WALLS
A PF No. 01 Back Wall Mtr. 600.00 0.00 600.00 2/1/2023 7/30/2023 0%
6 STATION BUILDING
At Ch. 28.97 towards
A RTM End Nos. 1 0 1.00 12/1/2022 10/30/2023 40%
7 QUARTERS
8 OFFICE/STORE/OTHER
BUILDING
9 EARTH FILLING
10 ROADS
A Cable Trench Work at Mtr. 600.00 230.00 370.00 10/1/2022 6/30/2023 38%
PF No. 01
15 Formation Work
Earth Work TWO is
A m 945 0 945.00 4/30/2023 0%
required
Blanketing
B m 2445 0 2445.00 4/30/2023 0%
Supply of Ballast
c cum 6000 4500 1500.00 10/1/2022 4/30/2023 75%
Tansportation of
D Sleepers(Normal) nos 3960 3960 0.00 10/1/2022 12/31/2022 100%
Tansportation of
E Sleepers(Turnout) Set 7 7 0.00 10/1/2022 12/31/2022 100%
16 Track Work
Ballast Bed Prepration
A m 2446 0 2446.00 4/30/2023 0%
B PF No. 02 (600m X 6.10m) Mtr. 600.00 600 0.00 01/08/2022 31/05/2023 100%
TOILET BLOCK/FEBRICATED
2 TOILET
3 WATER HUT
4 PLATFORM SHELTER/COVERING
SHED
Drawing not yet
A At PF No. 01 (64x8.00m.) Mtr. 128 0 128.00 0% received
(64.00x8.00m)
Drawing not yet
B At PF No. 02 (64.00x6.10 m.) Mtr. 64 0 64.00 0% received
5 BOUNDARYWALL/OTHER WALLS
6 STATION BUILDING
A At Ch. 33.50 towards RTM End Nos. 1 0 1.00 12/1/2022 4/30/2024 40%
7 QUARTERS
8 EARTH FILLING
2022 2023 2024
Sr. % of
No Description of Works Unit Approx. Work Done Balanced to Date of Start Date of Finish Proges Remarks
Scope be Done A N M A N M A
. s JU U SE O O DE JA FE A AP M JU JU U SE O O DE JA FE A AP M JU JU U
L G P CT V C N B R R AY N L G P CT V C N B R R AY N L G
9 ROADS
A Cable Trench Work at PF No. 01 Mtr. 600.00 400.00 200.00 10/1/2022 10/30/2023 67%
B Cable Trench Work at PF No. 02 Mtr. 600.00 0.00 600.00 3/1/2022 3/30/2023 0%
11 OTHER WORKS
14 Minor Bridges
A Minor Bridges Nos. Drawing not yet
1 0 1 0 received
15 Formation Work
Earth Work
A m 945 0 945.00 5/30/2024 0% TWO is required
Blanketing
B m 2350 0 2350.00 5/30/2024 0%
Supply of Ballast
c cum 6000 0 6000.00 5/30/2024 0%
Tansportation of Sleepers(Normal)
D nos 3790 3790 0.00 12/31/2022 100%
Tansportation of
E Sleepers(Turnout) Set 9 9 0.00 12/31/2022 100%
16 Track Work
Ballast Bed Prepration
A m 2350 0 2350.00 5/30/2024 0%
Track Linking
B m 2350 0 2350.00 5/30/2024 0%
Laying Turnout
c Set 9 0 9.00 5/30/2024 0%
Bar Chart Showing the Current Activites of the Different Items & Complition Schedules
Priority 2 :- (MDS STATION) Complition Date :- AUG-2024
Client : Western Railway
Agency : M/s. SRC-ENRICH-VRR (JV), Hyderabad.
Name of Work : Composite tender for execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway line involving (i) Engineering works in in
yards and (ii) Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of works as mentioned in tender document.
TOILET BLOCK/FEBRICATED
2 TOILET
3 WATER HUT
4 PLATFORM SHELTER/COVERING
SHED
At PF No. 01 (48x6.10 m.) Drawing not yet received
A Mtr. 148.00 0.00 148.00 0%
(100x6.10m)
Drawing not yet received
B At PF No. 02 (64.00x11.00 m.) Mtr. 64.00 0.00 64.00 0%
5 BOUNDARYWALL/OTHER WALLS
6 STATION BUILDING
Drawing not yet received
A At Ch. 136.11 towards RTM End Nos. 1.00 0.00 1.00 0%
7 QUARTERS
Drawing not yet received
A Type II Quarters Nos. 24.00 0.00 24.00 0%
Drawing not yet received
B Type III Quarters Nos. 11.00 0.00 11.00 0%
Drawing not yet received
C Type IV Quarters Nos. 2.00 0.00 2.00 0%
8 OFFICE/STORE/OTHER BUILDING
2022 2023 2024
Balanced % of
Sr. Description of Works Unit Approx. Work to be Date of Start Date of Finish Proges Remarks
No. Scope Done A N M A N M A
Done s JU U SE O O DE JA FE A AP M JU JU U SE O O DE JA FE A AP M JU JU U
L G P CT V C N B R R AY N L G P CT V C N B R R AY N L G
8 EARTH FILLING
9 ROADS
A Cable Trench Work at PF No. 01 Mtr. 547.88 0.00 547.88 7/1/2023 1/30/2024 0%
B Cable Trench Work at PF No. 02 Mtr. 600.00 330.00 270.00 10/1/2022 1/30/2024 55%
11 OTHER WORKS
15 Formation Work
Earth Work
A m 1100 0 1100.00 5/30/2024 0% TWO is required
Blanketing
B m 3600 0 3600.00 5/30/2024 0%
Supply of Ballast
c cum 9000 0 9000.00 5/30/2024 0%
Tansportation of Sleepers(Normal)
D nos 4100 800 3300.00 12/31/2022 20%
Tansportation of
E Sleepers(Turnout) Set 16 0 16.00 12/31/2022 0%
16 Track Work
Ballast Bed Prepration
A m 3600 0 3600.00 5/30/2024 0%
Track Linking
B m 3600 0 3600.00 5/30/2024 0%
Laying Turnout
c Set 16 0 16.00 5/30/2024 0%
Bar Chart Showing the Current Activites of the Different Items & Complition Schedules
Priority 3 :- (DLD STATION) Complition Date :- JAN-2025
Client : Western Railway
Agency : M/s. SRC-ENRICH-VRR (JV), Hyderabad.
Name of Work : Composite tender for execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway line involving (i) Engineering works in in yards and (ii)
Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of works as mentioned in tender document.
A PF No. 01 (600.00m X 6.10m) Mtr. 600.00 450 150.00 01-06-2023 31-07-2023 75%
2 TOILET BLOCK/FEBRICATED
TOILET
3 WATER HUT
PLATFORM SHELTER/COVERING
4 SHED
Drawing not yet received
A At PF No. 01 (96.00x6.10 m.) Mtr. 96 0 96.00 0%
Drawing not yet received
B At PF No. 02 (96.00x6.10 m.) Mtr. 96 0 96.00 0%
5 BOUNDARYWALL/OTHER WALLS
6 STATION BUILDING
7 QUARTERS
8 OFFICE/STORE/OTHER BUILDING
Drawing not yet received
A Labour Room Nos. 1 0 1.00 0%
8 EARTH FILLING
9 ROADS
11 OTHER WORKS
15 Formation Work
Earth Work
A m 2334 0 2334.00 10/30/2024 0% TWO is required
Blanketing
B m 3134 0 3134.00 10/30/2024 0%
Supply of Ballast
c cum 7835 0 7835.00 10/30/2024 0%
Tansportation of Sleepers(Normal)
D nos 5000 3000 2000.00 12/31/2022 60%
Tansportation of
E Sleepers(Turnout) Set 18 18 0.00 12/31/2022 100%
16 Track Work
Ballast Bed Prepration
A m 3134 0 3134.00 10/30/2024 0%
Track Linking
B m 3134 0 3134.00 10/30/2024 0%
2022 2023 2024 2025
Sr. Approx. Work Balanced % of
No. Description of Works Unit Scope Done to be Date of Start Date of Finish Proges A N M A N M A N Remarks
Done s JU U SE O O DE JA FE A AP M JU JU U SE O O DE JA FE A AP M JU JU U SE O O DE JAN
L G P CT V C N B R R AY N L G P CT V C N B R R AY N L G P CT V C
Laying Turnout
c Set 18 0 18.00 10/30/2024 0%