You are on page 1of 1

F8A DETAIL (141 FS) (QTY = 1 NOS) F8B DETAIL (130, 154 FS) (QTY = 2 NOS) GENERAL NOTES

GRID GRID

no comment
GRID

GRID
B D
GRID

GRID
REFERENCE DRAWINGS
A C

FOUNDATION PLAN REBAR ARRANGEMENT FOUNDATION PLAN REBAR ARRANGEMENT

no comment

Creating Value Through Project Management

CODE A : NO OBJECTION

CODE B : OBJECTION

DATE BY

SECTION B SECTION D

A 16/11/22 IFA SYM / RA DNR TK

REV DATE DESCRIPTION PREPARE CHECK APPROVAL

EMPLOYER :
SOLUSI BANGUN
INDONESIA
ENGINEER :

Creating Value Through Project Management

CONTRACTOR :
TPJC-TQ1-DW-C5-641-3G00-025

PROJECT :
SECTION A SECTION C EPC TUBAN JETTY UPGRADE AND
ITS ANCILLARY PRODUCTION &
TRANSPORTATION FACILITIES
TITLE :
TUBE CONVEYOR (641-BC01)
FOUNDATION DETAIL

DRAWING NO. SHEET OF SIZE

TPJC-TQ1-DW-C5-641-3G00-025 1 OF 1 A3
A

You might also like