LLM RQ NDT 012
LLM RQ NDT 012
VIETNAM
Tổ hợp hóa dầu Miền Nam Việt Nam
PROJ. No.:
QUALITY CONTROL FORM 036909C
QCF REV. A SH. 1 OF 1
DATE: 22-Apr-2020
WORKING AREA PREFABRICATION ERECTION ✘
2EUG04-IDW-53164-02 02SP001 005 B 30" WPS-LLM-002 21-Apr-20 LLM-001 A 9,53 mm cs 100% X PIPE TO 90⁰ ELBOW
2EUG04-IDW-53164-03 03SP001 005 B 30" WPS-LLM-002 21-Apr-20 LLM-011 A 9,53 mm cs 100% X PIPE TO 90⁰ ELBOW
2EUG04-IDW-53164-04 04SP001 006 B 30" WPS-LLM-002 22-Apr-20 LLM-001/LLM-011 A 9,53 mm cs 100% X PIPE TO 45⁰ ELBOW
2EUG04-IDW-53164-04 04SP001 016 B 24" WPS-LLM-002 21-Apr-20 LLM-002 A 8,74 mm cs 100% X PIPE TO 90⁰ ELBOW
2EUG04-IDW-53164-04 04SP001 017 B 24" WPS-LLM-002 21-Apr-20 LLM-004 A 8,74 mm cs 100% X PIPE TO 90⁰ ELBOW
2EUG04-IDW-53164-04 04SP001 011 B 24" WPS-LLM-002 22-Apr-20 LLM-012 A 8,74 mm cs 100% X PIPE TO 90⁰ ELBOW
2EUG04-IDW-53164-04 04SP001 012 B 24" WPS-LLM-002 22-Apr-20 LLM-010 A 8,74 mm cs 100% X PIPE TO 90⁰ ELBOW
2EUG04-IDW-53164-05 05SP001 006 B 24" WPS-LLM-002 22-Apr-20 LLM-001 A 8,74 mm cs 100% X PIPE TO 90⁰ ELBOW
NOTES:
(1) B=Buttweld S=Socket Weld EW=External Weld
(2) A=ACCEPTED R=TO BE REPAIRED
(3) Signature of the Subcontractor's Inspector (or equivalent Personnel).
(4) Signature of the Contractor's Inspector (or equivalent Personnel) only in case of its inspection’s attendance.
NAME
SIGNATURE
DATE