You are on page 1of 3

1. What are the challenges involved from execute design coordination to BIM?

When
you are doing Design coordination in BIM, what is the challenges? (Answer: what,
what, what, what, Human, animal, zoo)
2. What are the organizational challenges when staff are to adopt BIM in your work
methodology?
3. When modelling a BIM model if which is required power socket outlet position choose from
below which is the correct coordination workflow? What is the right coordination workflow
when you are doing power socket outlet position?
4. What are the challenges involved When executing design documentation in BIM?
(Challenges or design documentation in BIM)
5. When implementing BIM for design documentation what are the technological challenge for
a consultancy farm? (Focusing on a consultancy farm)
6. What are the different types all stages of design documentation in BIM? (Focus is design
documentation, what is the type of stages?)
7. Autodesk dynamo is a visual programming tool beside generating geometry from accept of
data. What is the use of Dynamo?
8. All BCA of BIM submission shall meet the following requirement specify under the following
guides? That means when you are doing BIM submission What BIM guide you are supported
to use? (The name of the book can be downloaded from BCA website specially for BIM
submission)
9. Steal in submission, BCA, BIM E-submission architecture template has included several
schedules embedded in this template. What are the schedule included? (Downloaded BCA
template and look at what are the schedule that embedded inside) have to do area in the
model.
10. When you are submitting to BCA for Civil Structural approval the beam structural physical
model must include modelling of primary load bearing element of what? What should be
included in primary load bearing element?
11. When submitting to BCA for household shelter approval what would be necessary
information to show in a part 3D view of a typical unit of the floor Plan? (What they always
emphasis must show off Part 3D view?)
12. When submitting to BCA same thing for civil structural approval the beam structural model
will adopt which coordinate system to zero reference of element? (Focus on the coordinate
Singapore standard)
13. When submitting to BCA same thing for civil structural approval this is what do we have
adopted for the BIM structural model in order to show the hight datum for Z coordinate?
14. When submitting to BCA same thing for civil structural approval for cross laminated timber
what does the part 3D view has to indicate?
15. When you are shifting gas pipe routing in a residential typical 3D view part model what are
the critical annotation that are required to this model? (Valves, Service valves chamber)
16. When illustrating apart 3D model of a bulk meter details, What are the critical components
needed to be shown in the submission to PUB this is in conjunction to a bulk meter detail?

17. When illustrating apart 3D model of ACMV system, what attribute are to be shown
for the system this is part 3D BIM model of ACMV system? What attribute should be
shown in the system?
18. Client has requested a design presentation for community centre project they request to be
easily accessible at all times to discuss with their boss or director, what is the best
interactive software would you recommend?
19. When modelling a particularly a large building project with the GFA of 500,000 sqm for
M&E coordination, how the BIM model manage when modelling the floor? (As a
BIM manager, how do you advise?)
20. When modelling a floor and a column component, how you as a modeller place rebar
component for the purpose of construction documentation?

21. What is the advantage of modelling MEP services in BIM as compared to the traditional
method of drafting MEP services in Cad? (What are advantages compare BIM and AutoCAD?)
22. What is consider the most critical requirement when conducting spatial coordination
in a BIM environment?
23. A new building project and you are preparing the BEP plan all your state holder user a similar
BIM authoring software except for your C&S engineer their organization uses Tekla structure
designer what would u recommend as the type of model for spatial coordination? (Clash,
federated, central, integrated model)
24. Project review software by use generally to review conflict and clashes between
different discipline model besides BIM use as a clash detection software what are other use
other than review conflict and clash for between the discipline what is the clash detection
software use for?
25. There are three different origin point in Autodesk Revit project as a BIM manager, which
point would u use when setting out the model for coordination?
26. You as a BIM consultancy farm reputable BIM contractor specialized in multi residential
project if adopted BIM to improve your workflow productivity what BIM software will you
recommend for them to purchase?
27. Virtual work through (Def of Virtual work through?)
28. With the adoption of BIM conflict of discrepancies between the different disciplines are no
longer identified at what stage?
29. You are the overall BIM manager for the community centre building project and every buy
with this there is integrated concurrent engineering coordination meeting you are
establishing some household all the far file that need to be fabricated into zone what is the
recommended maximum file size you will suggest for the stage holder?
30. In BIM environment the terminology of clash is defined as? (The terminology of clash is
defined as what in the BIM environment?)
31. What is the BIM object? (Def of BIM object?)
32. How does BIM objects support AEC industry during schematic design phase?
33. When you are modelling BIM object for LOD 400 who are the main state holder that
will be involved in their production and selection for a building project?
34. The building project is now into the detail design development stages what type of BIM
object would recommend for the BIM model?
35. The BIM authoring tool you are using is Autodesk Revit however your project architect is
using Graphic soft archicarp you need to send your model for coordination works, what
classification would u need to append for the model so that the project architect could open
the model in their authoring software?
36. In a BIM Teamwork environment, work sharing of the BIM model fascinated which of the
most obvious advantage?
37. There are many types of BIM server for Autodesk product what is the BIM server for Graphic
soft product?
38. When conducting a multi discipline coordination during a building project which of the
following sequence is correct? (The workflow?)
39. Autodesk Navisworks has three Native file formats, and your BIM manager has start you as a
BIM coordinator to send the model to your engineer you will inform that the engineer only
has free version of Navisworks which file format will you send to your engineer? (What kind
of file format for Navisworks can be open in Navisworks freedom?)
40. Besides using review software such as Autodesk Navisworks for detecting conflict and
clashes between the discipline What are the practical use could this software be used for?
41. Client asks for a BIM model that require to have both times and costs Which of the following
BIM dimensional would you provide for your BIM model? What does BIM dimension
2D,3D,4D,5D?
42. You are preparing BEP and with the reference to the Singapore BIM guide you are to
specify the BIM object and responsibility matrix at detail design development stage
what type of cost estimate will you needed to draft or provided for the BIM model?
43. What is the potential value when conducting cost estimation using BIM? What could be the
potential value having BIM to conduct cost estimation?
44. The QS has requested a BIM model for the civil structural consultant you as a BIM
coordinator is started to ensure that the BIM model is model correctly where the QS
calculate the concrete works containing to column, beam, slab, and wall components the
concrete work for each component has different concrete mixed, how the column, beams,
and walls component BIM model?
45. When executing 5D cost estimation, what are the results require to ensure the model satisfy
the competency requirements?
46. Assuming that you are a QS, and you are task to do cost estimation for bungalow
house with the GFA of 5000sqm, how would you implement a BIM cost management
process to ensure and accurate costing?
47. The depth of the steel universal beam is measured as 600 mm and with the structural
engineer calculation the depth of the UB could be 1/3 of his depth to support the loading
facilitate in the zone. Choose how the measurement of the UB width would be taken when
operating in the BIM cost estimation software.
48. Why is cost estimation with BIM advantages to traditionally method of cost estimation,
please select the most advantages taken. (Comparing cost estimation traditional and BIM
way, what is the most advantages)
49. Which of the following is considered as 4D technology?
50. What are the challenges BIM object facing in current climate?