You are on page 1of 14

ERL CAPE Section

PLANS Design Drg.


SL.NO Descriptio Initiat CE Divisio Initiat
Unit Scope
n ed by Approv n HQ ed by
Dy.CE ed Appd. Appd. Dy.CE
4
Major
1 bridges Nos. 4 4 4
2 0
Minor
bridges Nos. 128 19 16 0 0
3 ROBs Nos. 4 4 4 3 3 3
4 RUBs Nos. 3 3 3 2 0 0
5 LHS Nos. 3 2 0 0 0 0
6 Aqueducts 7
Nos. 8 8 8 8 8
7 FOB Nos. 3 3 3 3 0 0
8 LC Nos. 17 11 11 0
9 ESP Nos. 4 4 4 4 4
10 Stage Plan Nos. 8 6 6 5 6
11 W-PLAN Km 35.5 35.5 20 0 0
W-
12 SECTION Km 35.5 35.5 20 0 0
13

LWR Nos. 35.5 20 1.961 1.961 1.961


BUILDING
14 DRG. Nos. 6 6 6 6
APE Section
Design Drg. Launching Drg. CRS sanction
CE Initiat CE Divisio Dy.CE REMARK
Approv ed by Approv n CBE Submit Sancti S
ed Dy.CE ed Appd. Appd. ted oned
4

3 2 2 2 2
0 0 0 0 0
0 0 0 0 0
7 6 6 6 5

0 0 0 0 0

NJT yard
stage-I;
1.961km
complete
d
ERL NJT Section
PLANS Design Drg.
SL.NO Descrip Initiat CE Divisio Initiat CE
Unit Scope
tion ed by Approv n HQ ed by Approv
Dy.CE ed Appd. Appd. Dy.CE ed
4 4
Major
1 bridges Nos. 4 4 4
2 0 0
Minor
bridges Nos. 128 19 16 0 0
3 ROBs Nos. 4 4 4 3 3 3 3
4 RUBs Nos. 3 3 3 2 0 0 0
5 LHS Nos. 3 2 0 0 0 0 0
6 Aquedu 7 7
cts
Nos. 8 8 8 8 8
7 FOB Nos. 3 3 3 3 0 0 0
8 LC Nos. 17 11 11 0
9 ESP Nos. 4 4 4 4 4
Stage
10 Plan Nos. 8 6 6 5 6
11
W-
PLAN Km 35.5 35.5 20 0 0
W-
SECTIO
12 N Km 35.5 35.5 20 0 0
13

LWR Nos. 35.5 20 1.961 1.961 1.961


BUILDI
NG
14 DRG. Nos. 6 6 6 6
DETAILED BREAK UP
PLANS Design Drg.
SL.NO Descrip Initiat CE Divisio Initiat CE
Unit Scope
tion ed by Approv n HQ ed by Approv
Dy.CE ed Appd. Appd. Dy.CE ed
1 ERL 1 1 1 1 1
ESP
ESP
2 VRLR 1 1 1 1 1
2 2 2 2 2
1 ERL 3 1 1 0 0
STAGE
2 PLANS VRLR 0 0 0 0 0
11 8 5 5 4 4

MAJOR
BRIDGES
1 241 1 1 1
4 4 4 0 0
1 230 1 1 1 1 1 1 1
2 236 1 1 1 1 1 1 1
ROB in
lieu of LC
ROB
3 20
4 260
5 262 1 1 1 1 1 1 1
6 289A 1 1 1 0 0 0 0
7 315
4 4 4 3 3
1 RUB 238 1 1 1 0 0 0 0
3 3 3 2 0
1 242A 1 1 0 0 0 0 0
LHS
2 252A 1 1 0 0 0 0 0
3 2 0 0 0
1 231 1 1 1 1 1 1 1
2 248 1 1 1 1 1 1 1
3 249 1 1 1 1 1 1 1
AQUADU
4 CT 254 1 1 1 1 1 0 0
5 261 1 1 1 1 1 1 1
6 263 1 1 1 1 1 1 1
7 266 1 1 1 1 1 1 1
7 7 7 7 7
1 ERL 1 1 1 1 0
FOB
2 VRLR 1 1 1 1 0
3 3 3 3 0
1 222 1 0 0 0 0
2 223 1 0 0 0 0
3 224 1 0 0 0 0
4 225 1 0 0 0 0
5 226 1 0 0 0 0
6 227 1 0 0 0 0
7 228 1 0 0 0 0
8 229 1 0 0 0 0
9 232 1 0 0 0 0
10 233 1 0 0 0 0
11 234 1 0 0 0 0
12 235 1 0 0 0 0
13 237 1 0 0 0 0
14 239 1 0 0 0 0
15 240 1 0 0 0 0
16 242 1 0 0 0 0
17 243 1 0 0 0 0
18 244 1 0 0 0 0
19 245 1 0 0 0 0
20 246 1 0 0 0 0
21 247 1 0 0 0 0
22 250 1 0 0 0 0
23 251 1 0 0 0 0
24 252 1 0 0 0 0
25 253 1 0 0 0 0
26 255 1 0 0 0 0
27 256 1 0 0 0 0
28 257 1 0 0 0 0
29 258 1 0 0 0 0
30 259 1 0 0 0 0
31 MINOR 264 1 0 0 0 0
33 BRIDGES 267 1 0 0 0 0
34 268 1 0 0 0 0
35 269 1 0 0 0 0
36 270 1 0 0 0 0
37 271 1 0 0 0 0
38 272 1 0 0 0 0
39 273 1 0 0 0 0
40 274 1 0 0 0 0
41 275 1 0 0 0 0
42 276 1 0 0 0 0
43 277 1 0 0 0 0
44 278 1 0 0 0 0
45 279 1 0 0 0 0
46 280 1 0 0 0 0
47 281 1 0 0 0 0
48 282 1 0 0 0 0
49 283 1 0 0 0 0
50 284 1 0 0 0 0
51 285 1 0 0 0 0
52 286 1 0 0 0 0
53 287 1 0 0 0 0
54 288 1 0 0 0 0
55 289 1 0 0 0 0
56 290 1 0 0 0 0
57 291 1 0 0 0 0
58 292 1 0 0 0 0
59 293 1 0 0 0 0
60 294 1 0 0 0 0
61 295 1 0 0 0 0
62 296 1 0 0 0 0
63 297 1 0 0 0 0
128 19 16 0 0
1 STATION ERL 1 1 1 1
2 BLDG. VRLR 1 1 1 1
2 2 2 2 0
1 S&T ERL 1 1 1 1
BUILDIN
2 GS VRLR 1 1 1 1
4 4 4 4 0
WORKIN
0
1 G PLANS ERL-NJT 13.45 13.45 13.45 0
13.45 13.45 13.45 0 0

WORKIN
G 0
SECTION
1 ERL-NJT 13.45 13.45 13.45 0
13.45 13.45 13.45 0 0
1 LC No. 20 1 1 1 0 0
2 LC No. 22 1 1 1 0 0
3 LC LC No.23 1 1 1 0 0
4 PLANS LC No.24 1 1 1 0 0
5 LC No 25 1 1 1 0 0
6 LC NO 26 1 1 1 0 0
17 11 11 0 0
1 LWR ERL-NJT 20 20 1.961 1.961 1.961
35.5 20 1.961 1.961 1.961
ection
Launching Drg. CRS sanction
Initiat CE Divisio Dy.CE REMARK
ed by Approv n CBE Submit Sancti S
Dy.CE ed Appd. Appd. ted oned

2 2 2 2
0 0 0 0
0 0 0 0
6 6 6 5

0 0 0 0

NJT yard
stage-I;
1.961km
complete
d

Launching Drg. CRS sanction


Initiat CE Divisio Dy.CE
ed by Approv n CBE Submit Sancti
Dy.CE ed Appd. Appd. ted oned
1 1 1 0 0 0
1 1 1 1 1 1

0 0 0 0 0 0
0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0
0 0 0 0 0 0

1 1 1 0 0 0
1 1 1 1 1 1
1 1 1 1 1 1
0 0 0 0 0 0
1 1 1 1 1 1
1 1 1 1 1 1
1 1 1 1 1 1
POSITION OF GAD's & ESP's BETWEEN ERL-NCJ-CAPE As on 11-03-2022

ERL-NJT
BRIDGES

Item
Bridge No E-File No. Type of Bridge Presently file with Date Remarks
No

GAD Approved by CBE. Sub structure/Super


1 230 120444 ROB (CG) Approved 08.03.2022 Structure approved by CE/CN. Dismantling
scheme at Division

GAD Approved by CBE. Sub structure/Super


2 231 71223 Aqueduct CBE Approved Structure approved by CE/CN. Dismantling
scheme submitted to CE/CN

Railway portion completed. Approaches in


3 236 133653 ROB (CG) Launching scheme Approved by CRS/SBC
progress
Corrections advised by division, contractor to
4 238 129740 RUB (Box) SSE/Drg/CN/TVC 01.02.2022
resubmit GAD
5 248 108690 Aqueduct Launching scheme Approved by CRS/SBC 18.07.2021 Bridge proper completed

6 249 132754 Aqueduct Launching scheme Approved by CRS/SBC 19.07.2021 Bridge proper completed
Approved by CBE. Design of sub structure
7 254 Edas Aqueduct CBE Approved 10.03.2022
submitted to CE office
Super structure design approved by
8 260 Edas Aqueduct cum ROB GAD Approved by CBE 16.12.2021 CE/CN/S/ERS on 01.02.2022. Ctr to submit
dismantling/launching scheme
9 261 119412 Aqueduct Launching scheme Approved by CRS/SBC 22.07.2021 Bridge proper completed

GAD Approved by CBE. Sub structure/Super


10 262 120450 ROB Approved 11.06.2021 Structure approved by CE/CN. Ctr to submit
dismantling scheme

11 263 120068 Aqueduct Launching scheme Approved by CRS/SBC Bridge proper completed
Substructure completed, girders to be
12 266 122564 Aqueduct Launching scheme Approved by CRS/SBC 26.07.2021
launched

13 289A Edas ROB SSE/Drg/CN/TVC 16.02.2022 To attend divisional remarks

14 ERL EDAS FOB CPDE 05.01.2022 For approval of CPDE/MAS

15 VRLR EDAS FOB CPDE 05.01.2022 For approval of CPDE/MAS

16 LC 20 EDAS ROB in lieu of LC 20 SSE/Drg/CN/TVC 28.01.2022 To attend remarks from CE office


17 252A EDAS LUS SSE-2/CN/HQ/ERS 23.02.2022 Send to CE office for approval

18 242A EDAS LUS SSE-2/CN/HQ/ERS 08.03.2021 Send to CE office for approval

BUILDINGS

ERL Stn Structural drawing and design approved by


19 EDAS GAD- STN BUILDING GAD Approved 13.01.2022
Building CE/CN/ERS on 03.02.2022
VRLR Stn
20 96392 GAD- STN BUILDING GAD Approved 09.04.2021 Work in progress
Building

STAGE PLANS
SL No E file No Station Presently file with Date Remarks
21 Edas ERL Stage I SSE/Drg/CN/TVC 15.10.2021 Division correction to be attend

LAUNCHING SCHEME
Sl No E file No Presently file with Date Remarks

22 230 Eoffice Launching Scheme CBE/MAS 28.01.2022 For Approval of CBE

23 231 Eoffice Launching Scheme CBE/MAS 28.01.2022 For Approval of CBE

DISMANTLING SCHEME

Sl No E file No Presently file with Date Remarks

24 231 Eoffice Dismantling Scheme Dismantling scheme with CE/ELE/CN/MS

25 254 Eoffice Dismantling Scheme Ctr to submit dismantling scheme

WORKING PLANS

SL No E file No Section Presently file with Date Remarks


ERL-NCJ (WP
26 Edas Approved 04.01.2022 Approved by CE/CN/ERS
Km.270-290)

WORKING SECTIONS
SL No E file No Section Presently file with Date Remarks
ERL-NCJ
27 Edas Approved 01.11.2021 Approved by CE/CN/ERS
(WS Km.270-290)
LEVEL CROSSING
28 Edas LC No.82 for closing SSE/I/CN/HQ/ERS 07.01.2022 Completion plan to be approved by CE

MISCELLANEOUS

29 Edas Water Hydrants @ CAPE Approved 18.02.2022 Approved by CE/CN/ERS

Structral design VRLR Stn


30 Edas SSE-4/CN/HQ/ERS 14.09.2021 Approved by CE/CN/ERS
Bldg
31 Eoffice Gabion wall design Approved 07.01.2022 Approved by CE/CN/ERS

NJT-NCJ
BRIDGES
Item
Bridge No E-File No. Type of Bridge Presently file with Date Remarks
No
Water way bridge(UP line
SSE-2/CN/HQ/ERS 23.02.2022 Send to CE office for approval
32 307 EDAS new bridge) COM PLAN
Rebuilding DN line Division/TVC 08.03.2022 Divisional remarks to be attended
33 308 EDAS Minor Bridge COM PLAN SSE-2/CN/HQ/ERS 23.02.2022 Send to CE office for approval
34 309 EDAS Minor Bridge SSE-2/CN/HQ/ERS 21.01.2022 Send to CE office for approval
35 310 EDAS Minor Bridge SSE-2/CN/HQ/ERS 21.01.2022 Send to CE office for approval

BUILDINGS
36 NJT EDAS New S&T Building GAD Approved 21.09.2021 Work in progress

STAGE PLANS
37 102692 NJT Stage I, II, III - Approved 20.04.2021 Approved
38 Edas LWR @ NJT (diversion) Approved 31.08.2021 Approved by CTE

ESP FOR CRS SANCTION


Sl No E file No Station Presently file with Date Remarks
39 NJT- Stage I- Diversion CRS/SBC Sanctioned 07.02.2022 Work completed and track diverted

NCJ-CAPE
BRIDGES
Item Date
Bridge No E-File No. Type of Bridge Presently file with Remarks
No (pending from) Approved by CE/CN/ERS. Divisional
40 22A EDAS Water way bridge Division/TVC 23.02.2022
approval awaits
41 20 EDAS SSE-2/CN/HQ/ERS 08.03.2022 Send to CE office for approval
42 21 EDAS DYCE/CN/TVC 10.03.2022 Approval awaits
43 22 EDAS SSE-2/CN/HQ/ERS 08.03.2022 Send to CE office for approval
44 23 EDAS SSE-2/CN/HQ/ERS 08.03.2022 Send to CE office for approval
45 24 EDAS SSE-2/CN/HQ/ERS 08.03.2022 Send to CE office for approval

BUILDINGS
DRM Approved. Design to be corrected by
46 CAPE EDAS ORH @ CAPE GAD Approved 17.02.2022
CTR as per CE/O/ERS remarks

STAGE PLANS
47 Edas CAPE Stage I-Alteration II Approved 30.09.2021 Alteration II approved by CTPM

HQ/ERS to advise whether this diversion is


48 Edas Cause way NCJ-CAPE SSE/CN/HQ/ERS 09.12.2021
required or not

WORKING PLANS
NCJ - CAPE (WP Km 0-
49 Edas Approved 15.02.2022 WP approved by CE/CN/ERS
15.5)

WORKING SECTIONS
NCJ - CAPE (WS
50 SSE/Drg/CN/TVC Submitted to CE/CN/ERS
Km 0-15.5)