1b 0 TEMPERATURE SCANFIER

IS.1 Temperature scanner panel made of sheet steel, floor


mounted consisting of temperature scanner as detailed
below The panel shalt be duly wired, pa~nted and
complete in all respect..;

1; -2.A) Ten po~nts micro p m s s o r based temperature


scanner to monitor H.T. motor winding and bearing
temwrature as well as the t e m p e m n d thrust
bearings of pumps. the scanner shall be suitable for
working with 4 wire system P.T. 100
RTDs for the range of 0% to 2 0 0 " ~with indicating
accuracy of 6.25% full scale (FS) 4 1°c and resolution
of O.lOc.The scanner shall k sljitatjle for operation at
220 V. 2 10% 50 Hz. A. C. si~pplyand shall have one
common relay for alarm. The unit shall be complete
wtth necessary c-bling lugs etc. for interconnection
between the terminal blocks and scanner terminals
within the panel.

The instruction shall be suitable for programming data


for each channel with the help of key board. Scanning
speed shall be variable from one second onwards. The
c;.annel number and data shall be indicated on the
seven segment Light Emission Diode (LED) displays.
The ~ndividualLEDS shall indicate thestatus of high or
low alarm and control relay status and sensor. A lock
shall be provided so that the programme cannot be
tempered wrth . Control relay shall be given for each
channel which will operate depending on the control
levels as per the programme.
s - 74 ----

GODAVARI MARATHWADA IRRIGATION DEVELOPMENT CORPORATION, ALIWNGABAD


- 7

(0) 1 No. of lemperalt~rescanner to be pr~videdfor


each H.T. motor feeder;

.
16.3
. .
2 Nos. portable Data Loggers. suitable for pl'upging
lo the above scanners shall be provided, will,
necessary interconnecting cable connections. The
loggers shall be suitable lor operation on 220 volts :
-+ 10 OO/ Hz, A. C. Supply. The printer shall be 24
column Alpllanurnetric Dot Metric Rerolling facility.
The printout shall be violet colour, and the speed L.

shall be 16 CPS.

1.&0 PREPARATION OF CABLE SCHEDULE AND SUPPLY,


a
INSTALLATION AND TESTING OF CABLES

16'.% \ First the work covers detailed engineering work for


preparation of cable schedule and cable. termination
schedule. This will comprise of uetailed study of various
equipmentslpanel drawings, co-ordination with other
manufacturerslsuppliers at site and preparation of cable
'
schedule giving the equipment interconnection references,
p,reparation of cable terminatiori schedules giving the
krminal details. core identification, purpose etc.

l ~ . % . , L . ~ e t a iabout
ls Engineering Work for preparation of cable
schedule and cable termination schedule.

The Contractor will have to get acquaint$d with his own as


w ~ l las ~ ~ : I ~ ~ I I \SPI II PI I~SI ~ by.
C ~ otllers. The diagrams
relalirlg to internal wiring and scllen~alics of equipment
supplied by other suppliers shall be made available to the
successful Contractor. 'The cable schedule to be prepared
after stirdy of aforesaid diagrams and shall contain the
followi~lydetails.

i Size of cable
ii) G i v i ~ ~tile
g idcr~tific,-ilio~i
ni~ftit)er
I
iii) Reference drawing numbers

Far pmsm ~ f i i/jARi


i ~ ic.,i
~
n I

w
Executive Engineer