Dcp30023 - Bim Auth. Tool 1 - p01 - js01 Na20
Dcp30023 - Bim Auth. Tool 1 - p01 - js01 Na20
Sri Gading
JOB SHEET
Tools/Equipment required:
1. PC
TOOLS / 2. Autodesk Revit
EQUIPMENTS /
MATERIALS 3. Autodeck AutoCAD
Materials required:
1. N/A
DRAWING AND
1. DCP 30023_Practical 1_3Dtopography.dwg
DATA
Page 1 of 10
INSTRUCTION Model the 3D topography based on 2D CAD data
PROCEDURE
1. Launch AutoCAD
Page 2 of 10
4. Click Next.
6. Click Next
Page 3 of 10
7. Select Text and Mtext. Then click
Next.
9. Click Next.
Page 4 of 10
10. Select Output data to external file i. Save as .csv
(.xls .csv .mdb .txt). Select . ii. Click Next
Page 5 of 10
14. Select the dropdown menu for i. Set the value is greater than 0,
Value > Text Filters > Custom Filter and is less then or equal to 80.
ii. This is the limit for the value
that can be extracted from the
CAD file.
iii. Click OK
iv. Make sure the limit value is
correct and after completion,
only numbers are shown.
Page 6 of 10
15. Select and copy all the value for
Position X, Position Y and Value.
Page 7 of 10
16. Paste it in the new sheet from cell
A1. Delete the previous sheet.
Save the new .csv file.
Page 8 of 10
17. Select Select Massing & Site >
i. Make sure the ”Phase
Toposurface
Created” is ”Existing”
Page 9 of 10
RESULT
QUESTION/DISCUSSION
CONCLUSION
REFERENCE
Checked by:
Signature:
Name:
Designation: Date:
Page 10 of 10